Tender Value
₹23.2 L
EMD Value
₹24,000
Closing Date
29 Sept 2026, 6:00 pm2d left
Executive Engineer, U.L.B.C.Inv.Dn.No.2,Valod
Restoration Work Of Uwa Distry At Ch.18000mt.
344822
E Tender Notice No.5 of 2026-27
Open
Civil Works
Works
Tapi
13 documents required · 11 mandatory · 2 optional
₹900
Executive Engineer, U.L.B.C.Inv.Dn.No.2,Valod
₹24,000
14 Sept 2026
14 Sept 2026
14 Sept 2026
29 Sept 2026
14 Sept 2026
BILL OF QUANTITIESAquaduct
Name of work:- Restoration Work Of Uwa Distry At Ch.18000mt.
BILL OF QUANTITIES
Item Description of Item (with brief specification and Quantity Unit Rate in Amount in Rs.
No. reference to book of specifications) Figures
Excavation of canal/drains in all sorts of soils (including wet
and slushy condition of soil) including depositing the excavated
stuff in uniform layers in canal banks or in spoil banks or as and
1 where directed including dressing the canal section upto lead of 1518.00 m3 82.40
50 meter and all lift including clearing the site etc. complete (By
machinery for canal/drain maintanance) (upto 1.5 cumecs
capacity of canal/drain)
Earthwork in embankment using selected soil, soft & hard
murrum excavated from approved borrow area/village tanks
2 etc.including breaking clods, dressing to the design section with 5400.00 m 118.10
lead up to Following Lead and all lifts.(By poclane machinary)
(a) lead up to 5.0 kilometer
Compaction of selected soil/hard murrum/soft murrum in even
3 thickness of 15 to 20 cms including watering rolling of suitable 5400.00 m3 10.40
capacity etc. complete as directed.
Providing and laying plain / reinforced cement concrete lining
of M-15 grade in bed, side slopes and curvature including
batching, mixing, transporting placing, smooth finishing, curing
including dewatering where required. (Machinary based without
Paver). (b) 15 cm thick lining in bed &
Slope with water curing
Excavation for foundation in all sorts of soil including yellow,
sandy, gravelly soil, soft & hard murrum, etc. dry condition
5 including depositing the excavated stuff in uniform layers in 256.00 m3 81.50
banks or as directed etc. complete for lead uo to 1.0 Km and all
lifts. (By machinery) (a) Above water table.
Providing and laying plain/reinforced Nominal Mix cement
concrete of various grade with cement, sand and coarse
aggregates including centering, shuttering, batching, mixing,
transporting, placing, vibrating, smooth finishing, curingetc.
6(A) complete for all lead and lift.(Manually With Conventional 37.00 m 4479.80
Mixer, Including dewatering)
(A) Raft, Bottom slab of barrel, footing of columns,
piers,abutment and bottom slab of slump etc.(i) M-15
(B ) Piers, abutment, Wing walls, Head wall, Return wall
etc)(ii) M-20 grade(1:1.5:3)
Providing and placing in position reinforcement bars including
7 cutting, bending welding, joints where necessary, hooking 31.00 Qtl 7194.00
etc.complete as per drawing for all lead and lifts. (b) TMT
8 Providing and fixing in position (different diameter) I.S NP3
class reinforced pipe with caulking the joints with cement
mortar 1:1 proportion using jutestring soaked in cement slurry,
finishing joints, and laying pipes to the designed grade and
levels, curing etc.complete for all lead and lifts.
(e) NP3 class 900 mm dia pipe.
Providing video graphy on the ocassion of function or for
9 ongoing construction work including dubbing, titeling etc. 1.00 4Hrs 1230.51
complete including cost of cassette/CD (b) Up to 4.00 hours
Schedule B Page
BILL OF QUANTITIESAquaduct
Item Description of Item (with brief specification and Quantity Unit Rate in Amount in Rs.
No. reference to book of specifications) Figures
I/We am/are willing to carry out the work at _________________________________________________________________ %
(percentage) above/below
* Estimated Amount (Should
put to tender be written in figures and word) of the*estimated
Estimatedrates mentioned
Amount put toabove.
tender Amount of my/our tender
*(Please strike out whichever is not applicable).
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
SIGNATURE OF CONTRACTOR Executive Engineer
U.L.B.C.Inv.Dn No.2
Schedule B Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Uwa Tail.pdf
Sch B Uwa Tail.pdf
E Tender Notice No.5 of 2026-27 For Upload.pdf
SBD Uwa Tail Revised.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .