Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.3 LAccepted-AOC UTTAR ARUPARA GIP COLONEY HOWRAH WEST BENGAL 711112 | HOWRAH | WEST BENGAL | 711112 | 1 | Accepted-AOC L1 | |
| 2 | 2₹21.2 L+₹86,400 (4.25%)Rejected-Finance BALITIKURI SHIBTALA INDUSTRIAL ESTATE HOWRAH 711113 | HOWRAH | HOWRAH | WEST BENGAL | 711113 | 2 | Rejected-Finance not L1 | |
| 3 | 3₹21.9 L+₹1.6 L (7.94%)Rejected-Finance 00 CHASIR MATH ICHAPUR SEALDANGA PO SANTRAGACHI HOWRAH 711104 HOWRAH WEST BENGAL 711104 | HOWRAH | WEST BENGAL | 711104 | 3 | Rejected-Finance not L1 | |
| 4 | 4₹23.7 L+₹3.4 L (16.5%)Rejected-Finance 26 1 V ROAD MONSATALA DASNAGAR HOWRAH 711105 | HOWRAH | HOWRAH | WEST BENGAL | 711105 | 4 | Rejected-Finance not L1 | |
| 5 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | A.T.A. INDUSTRIES L3 | Ray Enterprise L2 | SHRI ANAND UDYOG L1 | GLOBAL ENGINEERING UDYOG L4 |
|---|---|---|---|---|---|---|---|
| 1.00Procurement of straight pipe for repairing of Coal Carrying Pipe of Unit#2 boiler overhauling, scheduled in August-2026 ,STG-1, SGTPP. | |||||||
| 1.01 | PIPE,CCP,MS,STRAIGHT,ID 556,TK12 FOR COAL MILL SGTPP CCP FLANGELESS STRAIGHT COAL PIPE ID 556 MM, OD 580 MM,(TOLERANCE ON OD +/- 1 MM) THICKNESS 12 MM, 2000-2500 MM RUNNING LENGTH, MATERIAL MS IS: 226, ANTI RUST PAINTED, WELDING SEAMS FINISHED AT OUTSIDE, SINGLE LONGITUDINAL WELDING JOINT. | 150 | M | 21,93,750 ₹25,88,625 | 21,18,750 ₹25,00,125 | 20,32,350 ₹23,98,173 Lowest | 23,67,900 ₹27,94,122 |
Tender Value
₹22.9 L
EMD Value
₹45,722
Closing Date
31 Jul 2026, 3:00 pmClosed
General Manager, SgTPP
SgTPP, WBPDCL, PO-Monigram, Dist-Murshidabad, WB-742237
Procurement of straight pipe for repairing of Coal Carrying Pipe of Unit#2 boiler overhauling, scheduled in August-2026 ,STG-1, SGTPP.
2026_WBPDC_1030783_1
WBPDCL/SGTPP/NIT/E4142/26-27
Open Tender
Miscellaneous Goods
Item Wise
120 days
Sagardighi Thermal Power Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹45,722
Yes
25 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
31 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Procurement of straight pipe for repairing of Coal Carrying Pipe of Unit#2 boiler overhauling, scheduled in August-2026 ,STG-1, SGTPP. | |||||
| 1.01 | PIPE,CCP,MS,STRAIGHT,ID 556,TK12 FOR COAL MILL SGTPP CCP FLANGELESS STRAIGHT COAL PIPE ID 556 MM, OD 580 MM,(TOLERANCE ON OD +/- 1 MM) THICKNESS 12 MM, 2000-2500 MM RUNNING LENGTH, MATERIAL MS IS: 226, ANTI RUST PAINTED, WELDING SEAMS FINISHED AT OUTSIDE, SINGLE LONGITUDINAL WELDING JOINT. | 150 | M | 15,240.75 | ₹22,86,112.5 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.85 MB
BOQ_2531127.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .