| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance | ₹6.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹6.8 LAccepted-Finance VANIYAPURACKAI HOUSE PURAKKAD PO ALAPPUZHA | ALAPPUZHA | ALAPPUZHA | KERALA | ₹6.8 L | L2 | Accepted-Finance L2 |
| 3 | L3₹7.1 LAccepted-Finance | ₹7.1 L | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | Shaji.V L2 | VIJAY V NAIR L3 | A Sadik L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix - A | ||||||
| 1.00 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | 64.94 | sqm | 131 ₹8,506.88 | 137.7 ₹8,941.96 | 116 ₹7,532.81 |
| 1.00 | 26.30.1:Drilling suitable holes in reinforced or plain cement concrete with power driven
drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels,
columns and slabs to introduce steel bars for sunshades/balconies including
fixing the steel bars in position using epoxy resin anchor grout of approved
make but excluding the cost of reinforcement, all complete as per direction of
Engineer-In-Charge.Upto and including 12mm dia. | 10 | holes | 152.93 ₹1,529.30 | 160.5 ₹1,605 | 135 ₹1,350 |
| 1.00 | OD115085/2025-2026:Providing & fixing 10 mm dia Shear Connectors drilling holes of 14 mm dia in the concrete for a depth of 100 mm & cleaning the drilled holes using powered air blowers & fixing the connectors using Epoxy accelerate Anchor system as per drawings & specifications . The shear Connectors shall be welded to reinforcement for a minimum length of 50 mm. | 5 | each | 348.45 ₹1,742.25 | 365.8 ₹1,829 | 309 ₹1,545 |
| 1.00 | 26.37:Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. | 64.94 | sqm | 464.18 ₹30,142.92 | 487.3 ₹31,644.29 | 412 ₹26,754.46 |
| 1.00 | 26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter | 50 | metre | 16.71 ₹835.50 | 17.5 ₹875 | 14 ₹700 |
| 1.01 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter | 50 | metre | 8.35 ₹417.50 | 8.7 ₹435 | 7 ₹350 |
| 1.01 | OD115086/2025-2026:Anticorrossive treatment for preventing rusting of reinforcement at bottom portion of roof slab, columns, beams, lintel, sunshade etc.. by applying epoxy zinc primer after cleaning with rust removing liquid including the cost of all materials, labour charges for cleaning, applying anticorrossive solution etc... complete as per the directions of deptl. officers at site.(Measurement taken 10% of plastering area) | 10 | sqm | 321.66 ₹3,216.60 | 337.7 ₹3,377 | 285 ₹2,850 |
| 1.01 | 26.35.3:Providing and injecting approved grout in proportion recommended by the
manufacturer into cracks/honey-comb area of concrete/masonry by suitable
gun/pump at required pressure including cutting of nipples after curing etc.
complete as per directions of Engineer-in-Charge.
(The payment shall be made on the basis of actual weight of approved grout
injected.)Epoxy injection grout in concrete/RCC work of approved make | 10 | kg | 994.73 ₹9,947.30 | 1,044.4 ₹10,444 | 884 ₹8,840 |
| 1.01 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | 64.94 | sqm | 489.63 ₹31,795.59 | 514 ₹33,378.13 | 435 ₹28,248.03 |
Tender Value
₹6.8 L
EMD Value
₹16,949
Closing Date
18 May 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o The Assistant Executive Engineer,PWD Special Buildings Subdivision,Alappuzha
GENERAL Govt TDMC Alappuzha Urgent maintenance work for Ladies group quarters Ladies Staff Quarters General Civil Work
2026_PWD_850015_1
PWD/BLDG/TR/14823/2025(44/AEE)
Open Tender
Civil Works - Buildings
180 days
Alappuzha
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,495
Yes
₹16,949
Yes
1 Jun 2026
11 May 2026
20 May 2026
11 May 2026
18 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Appendix - A | ||||||
| 1.001 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | 0.2 | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 26.30.1:Drilling suitable holes in reinforced or plain cement concrete with power driven
drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels,
columns and slabs to introduce steel bars for sunshades/balconies including
fixing the steel bars in position using epoxy resin anchor grout of approved
make but excluding the cost of reinforcement, all complete as per direction of
Engineer-In-Charge.Upto and including 12mm dia. | - | holes | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | OD115085/2025-2026:Providing & fixing 10 mm dia Shear Connectors drilling holes of 14 mm dia in the concrete for a depth of 100 mm & cleaning the drilled holes using powered air blowers & fixing the connectors using Epoxy accelerate Anchor system as per drawings & specifications . The shear Connectors shall be welded to reinforcement for a minimum length of 50 mm. | - | each | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 26.37:Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. | 0.2 | sqm | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter | - | metre | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter | - | metre | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | OD115086/2025-2026:Anticorrossive treatment for preventing rusting of reinforcement at bottom portion of roof slab, columns, beams, lintel, sunshade etc.. by applying epoxy zinc primer after cleaning with rust removing liquid including the cost of all materials, labour charges for cleaning, applying anticorrossive solution etc... complete as per the directions of deptl. officers at site.(Measurement taken 10% of plastering area) | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | 26.35.3:Providing and injecting approved grout in proportion recommended by the
manufacturer into cracks/honey-comb area of concrete/masonry by suitable
gun/pump at required pressure including cutting of nipples after curing etc.
complete as per directions of Engineer-in-Charge.
(The payment shall be made on the basis of actual weight of approved grout
injected.)Epoxy injection grout in concrete/RCC work of approved make | - | kg | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | 0.2 | sqm | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1436292.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1436292.xls
BOQ • 0.33 MB
PA.pdf
Additional Documents • 0.24 MB
sbd.pdf
Tender Documents • 1.63 MB
Circular.pdf
Other Document • 20.04 MB
epay.pdf
Other Document • 0.06 MB
bis.pdf
Additional Documents • 0.56 MB
affidavit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid