| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹92,503.56Accepted-AOC | ₹92,503.56 | 1 | Accepted-AOC LOWEST |
| 2 | 2₹94,338Rejected-Finance | ₹94,338 | 2 | Rejected-Finance NOT LOWEST |
| Sl No | Description | Qty | Unit | Pradeep R L1 | PHILIP ABRAHAM L2 |
|---|---|---|---|---|---|
| 1.00SOAK PIT | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 38.96 | cum | 235.83 ₹9,188.17 | 235.83 ₹9,188.17 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 12 | cum | 3,847.13 ₹46,165.56 | 4,000 ₹48,000 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 138.82 | kilogram | 108.32 ₹15,037.52 | 108.32 ₹15,037.52 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 1.01 | cum | 10,010.58 ₹10,140.72 | 10,010.58 ₹10,140.72 |
| 1.00 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 20.4 | metre | 224.7 ₹4,583.88 | 224.7 ₹4,583.88 |
| 1.01 | 50.18.8.9.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC Solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 110 mm pipe 4 kgf/cm2 | 2 | metre | 740.01 ₹1,480.02 | 740.01 ₹1,480.02 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 20.74 | cum | 284.9 ₹5,907.69 | 284.9 ₹5,907.69 |
Tender Value
₹84,478
EMD Value
₹2,112
Closing Date
7 Oct 2023, 5:00 pmClosed
AEE, Pala Municipality
Office of the AEE, Pala Municipality
Annual Plan 2023 24 PALA MUNICIPAITY 318 24 CONSTRUCTION OF SOCKPIT IN MARKET COMPLEX TOILET General Civil Work
2023_LSGD_607797_17
LSGD/CELSGD/2023-2024/2
Open Tender
Civil Works - Others
120 days
Pala Municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹2,112
27 Mar 2026
30 Sept 2023
10 Oct 2023
30 Sept 2023
7 Oct 2023
30 Sept 2023
Amount
SOAK PIT
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
50.18.8.9.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC Solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 110 mm pipe 4 kgf/cm2
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
PHILIP ABRAHAM
Bidder Name
PHILIP ABRAHAM
Pradeep R
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_907207.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_907207.xls
BOQ • 0.27 MB
viewsbd.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid