Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical AFCONS HOUSE 16 SHAH INDUSTRIAL ESTATE VEERA DESAI ROAD AZADNAGAR ANDHERI WEST MUMBAI 400 053 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400053 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical GR HOUSE HIRAN MAGRI SECTOR 11 UDAIPUR 313001 RAJASTHAN | UDAIPUR | UDAIPUR | RAJASTHAN | 313001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1109.0 Cr
EMD Value
₹11.1 Cr
Closing Date
9 Jan 2026, 2:00 pmClosed
ED, CnP
NEEPCO Ltd, Brookland Compound, Lower New Colony, Shillong 793003
Package III Civil Works of Power Intake, Head Race Tunnel, Surge Shaft, Valve chamber, Pressure Shafts and Penstock, Underground Powerhouse Complex (comprising of Powerhouse Cavern, Transformer - GIS Cavern, etc. of Tato II HEP
2025_NEEPC_236688_1
NIB No. 483 Dtd. 27.05.2025
Global Tenders
Civil Works
Item Rate
1860 days
Tato II HEP, Shi Yomi District
Please refer Tender documents.
3 documents required · 3 mandatory
₹1.2 L
NEEPCO Ltd
₹11.1 Cr
28 Oct 2025
28 May 2025
12 Jan 2026
28 May 2025
9 Jan 2026
28 May 2025
28 May 2025 - 10 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONTROL OF WATER, CONSTRUCTION DRAINAGE AND DEWATERING Control of water, dewatering of surface/underground construction sites including all construction works, labor, plants and materials necessary to keep the construction sites free of water during the contract period. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge. | |||||
| 1.01 | Dewatering of all construction sites | 0.87 | kWHr | - | - |
| 2SURFACE EXCAVATION AND BACKFILL | |||||
| 2.01 | Surface excavation including loading, transport, all lift and lead up to 3.0 km from the excavation area/working site, unloading at disposal sites or stockpiles and maintenance of the disposal sites or stockpiles. Construction of haul roads (if any) and its maintenance. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge.
Power Intake, Portals, TRT outlet, Pothead yard, etc. | - | - | - | - |
| 2.02 | Clearing of excavation areas, disposal areas and stockpiles | - | m2 | - | - |
| 2.03 | Excavation in soil including stripping of top soil | 0.29 | m3 | - | - |
| 2.04 | Excavation in soft and disintegrated rock | 0.29 | m3 | - | - |
| 2.05 | Excavation in hard rock | - | - | - | - |
| 2.06 | a) Drilling and blasting | 0.29 | m3 | - | - |
| 2.07 | b) Line-drilling | - | metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 13.31 MB
BidDocPart2.pdf
Tender Documents • 34.79 MB
BidDocPart1.rar
Tender Documents • 11.26 MB
BOQ_268623.xls
BOQ • 0.65 MB
CorrigendumNo9NIB483.pdf
PDF • 0.27 MB
PreBidClarificationsNo3NIB483.pdf
PDF • 25.34 MB
CorrigendumNo8NIB483.pdf
PDF • 1.27 MB
CorrigendumNo7NIB483.pdf
PDF • 0.63 MB
PreBidClarificationsNo2NIB483.pdf
PDF • 2.06 MB
CorrigendumNo6NIB483.pdf
PDF • 0.60 MB
PreBidClarifications1NIB483.rar
PDF • 29.50 MB
CorrigendumNo5NIB483.pdf
PDF • 0.59 MB
CorrigendumNo4NIB483.rar
PDF • 39.80 MB
CorrigendumNo3NIB483.pdf
PDF • 2.18 MB
MOMPkgIII.pdf
PDF • 1.12 MB
CorrigendumNo2NIB483.pdf
PDF • 0.59 MB
PreBidMeetingNotice.pdf
PDF • 0.66 MB
CorrigendumNo1.pdf
PDF • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .