Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC KARINGAPPA CHEERAKUZHIYIL HOUSE PUNNATALA P O MALAPPURAM 676552 | MALAPPURAM | KERALA | 676552 | L1 | Accepted-AOC Agreement executed on 21/10/2025 | |
| 2 | L2₹4.4 L+₹14,960 (3.53%)Rejected-Finance KARIPPOL PO MALAPPURAM PIN 676552 | MALAPPURAM | MALAPPURAM | KERALA | 676552 | L2 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | HUSSAIN K L2 | Mohamed Rashid L1 |
|---|---|---|---|---|---|
| 1.00Compound Wall | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 7.55 | cum | 299 ₹2,257.45 Lowest | 299 ₹2,257.45 Lowest |
| 1.00 | OD11061/2025-2026:(OD From DAR 60.7.3)DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for
reuse for any thickness of walls in DR masonry including disposal of debris within a distance of
150m. | 37.12 | cum | 619 ₹22,980.38 Lowest | 619 ₹22,980.38 Lowest |
| 1.00 | OD11062/2025-2026:(OD From DAR 60.7.8)DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | 33.34 | cum | 1,479 ₹49,306.9 Lowest | 1,479 ₹49,306.9 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 18.7 | sqm | 337 ₹6,301.9 Lowest | 337 ₹6,301.9 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 3.83 | cum | 8,040 ₹30,801.24 Lowest | 8,040 ₹30,801.24 Lowest |
| 1.01 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 28.05 | cum | 5,924 ₹1,66,168.2 Lowest | 5,924 ₹1,66,168.2 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 299.2 | sqm | 316 ₹94,547.2 Lowest | 316 ₹94,547.2 Lowest |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 299.2 | sqm | 71 ₹21,243.2 Lowest | 71 ₹21,243.2 Lowest |
| 1.01 | 14.53.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 299.2 | sqm | 150 ₹44,880 | 100 ₹29,920 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
27 Sept 2025, 4:00 pmClosed
Assistant Engineer
AE lsgd office Athavanad grama panchayath
Athavanad GP 129/24-25 Kattilangadi Ayurvedic Dispensary-Compound wall in ward 13
2025_LSGD_799519_2
01/AE/ATVD/LSGD/ET/25-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Athavanad GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,593
Yes
19 Nov 2025
19 Sept 2025
29 Sept 2025
19 Sept 2025
27 Sept 2025
19 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1325855.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .