| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.9 LAccepted-Finance KP 8 490 UNIC POWER ENGINEERS VALLAMCODE KALLIYOOR THIRUVANANTHAPURAM 695020 | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695020 | 1 | Accepted-Finance satisfied with the terms and condition | |
| 2 | 2₹26.4 L+₹1.6 L (6.29%)Accepted-Finance NARIKUZHIYIL HOUSE KARIKODE P O KOTTAYAM 686 610 | KOTTAYAM | KERALA | 686610 | 2 | Accepted-Finance satisfied with the terms and condition | |
| 3 | 3₹28.8 L+₹3.9 L (15.7%)Accepted-Finance 14 395 D BISMI VILLA KUZHIPALLI PARAMBIL BC ROAD CHERUVANNUR FEROK PO CALICUT 673631 | CALICUT | KOZHIKODE | KERALA | 673631 | 3 | Accepted-Finance satisfied with the terms and condition | |
| 4 | Rejected-Technical | - | Rejected-Technical Work experience for the last 5 years prior to the date of tender not attached |
Tender Value
₹31.9 L
EMD Value
₹50,000
Closing Date
22 Sept 2026, 3:00 pmClosed
Transmission Sub Division Nedumangad
Assistant Executive Engineer Transmission Sub Division Nedumangad
replacing existing plate earthing with new mat earthing and providing connectivity for the existing yard equipments with the new mat earth
2026_KSEB_866897_1
5/TSD-NDD/2026-27 dtd 31-08-2026
Open Tender
Electrical Works
Percentage
150 days
Nedumangad
Please refer tender documents
6 documents required · 6 mandatory
₹5,900
₹50,000
7 Oct 2026
31 Aug 2026
23 Sept 2026
1 Sept 2026
22 Sept 2026
2 Sept 2026
1 Sept 2026 - 22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in- Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (cost index(c) : 1.4766 included in Rate) | 90 | cub.m | 0.36 | ₹32.39 |
| 2 | Dismantling already layed GI strip/Copper strip of variable size including cutting, removing of metal/earth in the yard and leading suitable place as per the direction of the departmental officers. Capital work- Replacement of old pipe earthing at upper 110kV Yard with erathmat at 110kV Substation, Nedumangad | 25 | meter | - | - |
| 3 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil (cost index(c) : 1.4766 included in Rate) | 510 | cub.m | - | - |
| 4 | 2.26.2 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock (cost index(c) : 1.4766 included in Rate) | 50 | cub.m | 0.12 | ₹6 |
| 5 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (cost index(c) : 1.4766 included in Rate) | 6.5 | cub.m | 0.64 | ₹4.16 |
| 6 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more (cost index(c) : 1.4766 included in Rate) | 610 | kg | 0.32 | ₹195.2 |
| 7 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete (cost index(c) : 1.4766 included in Rate) | 10 | sq.m | 0.8 | ₹8 |
| 8 | 5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (cost index(c) : 1.4766 included in Rate) | 11.5 | sq.m | 0.32 | ₹3.68 |
| 9 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size (cost index(c) : 1.4766 included in Rate) | 10 | cub.m | 0.76 | ₹7.6 |
| 10 | 13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) (cost index(c) : 1.4766 included in Rate) | 25 | sq.m | 0.64 | ₹16 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tender_conditions.pdf
Tender Documents • 1.12 MB
Checklist.pdf
Additional Documents • 0.31 MB
PQquestion.pdf
Additional Documents • 0.31 MB
BidQustionare.pdf
Other Document • 0.26 MB
BOQ_1467741.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .