| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹12.6 L (5.80%)Admitted-Finance | ₹2.3 Cr+₹12.6 L (5.80%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹21.5 L (9.89%)Admitted-Finance | ₹2.4 Cr+₹21.5 L (9.89%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 Cr+₹23.2 L (10.7%)Admitted-Finance | ₹2.4 Cr+₹23.2 L (10.7%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 Cr+₹25.8 L (11.9%)Admitted-Finance ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹2.4 Cr+₹25.8 L (11.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TANISHQ INFRATECH L2 | ROCKERR INFRASOLUTIONS PVT LTD L5 | COMET NETWORK L4 | CHOUDHARY BUILDER & CONSTRUCTIONS L14 | Gurukrupa Engineering L7 | Desco Infratech Pvt Ltd L13 | KUSHAL CONSTRUCTION L8 | JAYAM INFRATECH PRIVATE LIMITED L12 | Shreenath Construction & labour contractor L9 | EMBRACE GAS PIPELINES PVT. LTD. L11 | SUNDARAM CONSTRUCTION AND ENGINEERING L17 | Shree Polkaji Enterprises L16 | UPADHYAY CONSTRUCTION PVT LTD L15 | Shri Ganapati Traders L6 | GURUKRUPA ENTERPRISE L10 | Siddhtaki Enterprises L1 | Pattanaik Associate L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00MANPOWER | ||||||||||||||||||||
| 2.00 | Shift In-harge (Skilled) | 56 | Man-Months | 0.01 ₹14,65,036.72 Lowest | 2,200 ₹16,10,412.16 | 450 ₹14,94,772.16 | 15,000 ₹24,56,236.16 | 800 ₹15,17,900.16 | 2,500 ₹16,30,236.16 | 1,200 ₹15,44,332.16 | 2,800 ₹16,50,060.16 | 900 ₹15,24,508.16 | 1,829 ₹15,85,896.48 | 29,000 ₹33,81,356.16 | 36,000 ₹32,57,555.84 | 24,500 ₹30,83,996.16 | 1,000 ₹15,31,116.16 | 860 ₹15,21,864.96 | 200 ₹14,78,252.16 | 1,000 ₹15,31,116.16 |
| 3.00 | Technician (Semiskilled) | 168 | Man-Months | 0.01 ₹38,44,285.2 Lowest | 1,900 ₹42,20,939.52 | 450 ₹39,33,491.52 | 14,000 ₹66,19,643.52 | 750 ₹39,92,963.52 | 2,500 ₹43,39,883.52 | 1,000 ₹40,42,523.52 | 2,600 ₹43,59,707.52 | 750 ₹39,92,963.52 | 1,108 ₹40,63,933.44 | 20,500 ₹79,08,203.52 | 30,000 ₹82,97,867.76 | 22,500 ₹83,04,683.52 | 800 ₹40,02,875.52 | 800 ₹40,02,875.52 | 200 ₹38,83,931.52 | 550 ₹39,53,315.52 |
| 4.00 | Plumber (Semiskilled) | 112 | Man-Months | 0.01 ₹25,62,856.8 Lowest | 1,900 ₹28,13,959.68 | 450 ₹26,22,327.68 | 11,000 ₹40,16,615.68 | 750 ₹26,61,975.68 | 2,500 ₹28,93,255.68 | 1,200 ₹27,21,447.68 | 2,600 ₹29,06,471.68 | 750 ₹26,61,975.68 | 1,108 ₹27,09,288.96 | 20,500 ₹52,72,135.68 | 30,000 ₹55,31,911.84 | 20,500 ₹52,72,135.68 | 600 ₹26,42,151.68 | 800 ₹26,68,583.68 | 200 ₹25,89,287.68 | 500 ₹26,28,935.68 |
| 5.00 | Patrolman (Semiskilled) | 168 | Man-Months | 0.01 ₹38,44,285.2 Lowest | 1,900 ₹42,20,939.52 | 450 ₹39,33,491.52 | 15,000 ₹68,17,883.52 | 750 ₹39,92,963.52 | 2,500 ₹43,39,883.52 | 1,350 ₹41,11,907.52 | 2,600 ₹43,59,707.52 | 750 ₹39,92,963.52 | 4,608 ₹47,57,773.44 | 20,500 ₹79,08,203.52 | 30,000 ₹82,97,867.76 | 20,500 ₹79,08,203.52 | 900 ₹40,22,699.52 | 800 ₹40,02,875.52 | 200 ₹38,83,931.52 | 450 ₹39,33,491.52 |
| 6.00 | Helper (Unskilled) | 280 | Man-Months | 0.01 ₹56,70,694.4 Lowest | 1,700 ₹62,32,371.6 | 450 ₹58,19,371.6 | 12,000 ₹96,35,491.6 | 700 ₹59,01,971.6 | 2,500 ₹64,96,691.6 | 850 ₹59,51,531.6 | 2,500 ₹64,96,691.6 | 700 ₹59,01,971.6 | 3,337 ₹67,73,236.4 | 15,500 ₹1,07,91,891.6 | 26,500 ₹1,22,25,670.8 | 18,000 ₹1,16,17,891.6 | 1,200 ₹60,67,171.6 | 755 ₹59,20,143.6 | 200 ₹57,36,771.6 | 400 ₹58,02,851.6 |
| 7.00OTHER ITEMS | ||||||||||||||||||||
| 8.00 | Consumables:
Consumables covers the following but not limited as, the Soldering Wire, Flux, Ethyl Alcohol, Teflon Tape, Pressure Gauge, Grease, Diesel & Petrol, Cement, Butane lamp, Screw, Rawal plug, telephone and cell Phone Computer, Printer, Scanner, Internet connectivity (Broadband), Tea/water for employees, etc. GIS/GPS trackers for patrolman, excavation supervisor (person standing on excavation sites), VTS etc. the SOR covers all material, tools, equipments etc. which is required to perform the job and as per the direction and satisfactory of EIC. | 48 | Nos | 34,550 ₹19,56,912 | 18,000 ₹10,19,520 | 18,000 ₹10,19,520 | 80,000 ₹45,31,200 | 23,000 ₹13,02,720 | 25,000 ₹14,16,000 | 22,500 ₹12,74,400 | 30,000 ₹16,99,200 | 25,000 ₹14,16,000 | 17,000 ₹9,62,880 Lowest | 3,21,000 ₹1,81,81,440 | 40,000 ₹19,20,000 | 75,000 ₹42,48,000 | 20,000 ₹11,32,800 | 24,800 ₹14,04,672 | 18,000 ₹10,19,520 | 17,000 ₹9,62,880 Lowest |
| 9.00 | ERV-PNG-O&M:
The contractor must provide Mahindra bolero or equivalent with CNG to MNGL as per Branding & Necessary Modification (Internal & External) to perform O&M activity for round the clock (24 hr). Model shall be BS VI having running KM not more than 15000 KM with necessary provision to store tools & tackles etc. as per EIC. Contractor must ensure the compliance with prevailing RTO Regulations. Driver is in the scope of contractor. Average ERV running per month is 2500 KM. | 48 | Nos | 45,500 ₹25,77,120 | 58,600 ₹33,19,104 | 72,000 ₹40,78,080 | 1,50,000 ₹75,60,000 | 80,000 ₹45,31,200 | 1,00,000 ₹56,64,000 | 77,200 ₹43,72,608 | 95,000 ₹53,80,800 | 80,000 ₹45,31,200 | 78,000 ₹44,17,920 | 1,59,500 ₹90,34,080 | 1,20,000 ₹57,60,000 | 90,000 ₹50,97,600 | 85,000 ₹48,14,400 | 86,500 ₹48,99,360 | 45,000 ₹25,48,800 Lowest | 70,000 ₹39,64,800 |
| 10.00 | O&M Site Office:
Office location should be located at strategic locations for round of clock monitoring O&M activities. It should be well equipped with required infrastructure namely Furniture and for reference layout is attached in tender. Minimum office space for office and storage of materials should be of 350 Sq Feet of carpet area and space for ERV & bike Parking. Office facility should include toilet/washroom, electricity bill, rent agreement, etc. Office preferably be at ground floor. Office space, interior, should be finalized on satisfaction of EIC. | 48 | Nos | 18,450 ₹10,45,008 | 15,000 ₹8,49,600 | 19,800 ₹11,21,472 | 60,000 ₹33,98,400 | 22,000 ₹12,46,080 | 30,000 ₹16,99,200 | 21,900 ₹12,40,416 | 25,000 ₹14,16,000 | 22,000 ₹12,46,080 | 21,000 ₹11,89,440 | 65,000 ₹36,81,600 | 45,000 ₹21,60,000 | 30,000 ₹16,99,200 | 12,000 ₹6,79,680 | 23,700 ₹13,42,368 | 10,000 ₹5,66,400 Lowest | 19,000 ₹10,76,160 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
29 Dec 2022, 3:00 pmClosed
Cheif Manager (C and P)
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune-411045
Tender for Rate Contract for a period of 2 (Two) years for hiring of the support services for PNG O and M of MDPE Pipeline and PNG connections in Nashik GA for CGD Network of MNGL, Nashik.
2022_MNGL_138290_1
MNGL/CP/2022-23/155
Open Tender
Miscellaneous Services
Works
730 days
Nashik GA
As per tender document
16 documents required · 16 mandatory
₹0
₹2 L
Yes
MNGL, Baner, Pune
16 Jan 2023
15 Dec 2022
30 Dec 2022
15 Dec 2022
29 Dec 2022
15 Dec 2022
19 Dec 2022
Amount
MANPOWER
Shift In-harge (Skilled)
Technician (Semiskilled)
Plumber (Semiskilled)
Patrolman (Semiskilled)
Helper (Unskilled)
OTHER ITEMS
Consumables: Consumables covers the following but not limited as, the Soldering Wire, Flux, Ethyl Alcohol, Teflon Tape, Pressure Gauge, Grease, Diesel & Petrol, Cement, Butane lamp, Screw, Rawal plug, telephone and cell Phone Computer, Printer, Scanner, Internet connectivity (Broadband), Tea/water for employees, etc. GIS/GPS trackers for patrolman, excavation supervisor (person standing on excavation sites), VTS etc. the SOR covers all material, tools, equipments etc. which is required to perform the job and as per the direction and satisfactory of EIC.
ERV-PNG-O&M: The contractor must provide Mahindra bolero or equivalent with CNG to MNGL as per Branding & Necessary Modification (Internal & External) to perform O&M activity for round the clock (24 hr). Model shall be BS VI having running KM not more than 15000 KM with necessary provision to store tools & tackles etc. as per EIC. Contractor must ensure the compliance with prevailing RTO Regulations. Driver is in the scope of contractor. Average ERV running per month is 2500 KM.
O&M Site Office: Office location should be located at strategic locations for round of clock monitoring O&M activities. It should be well equipped with required infrastructure namely Furniture and for reference layout is attached in tender. Minimum office space for office and storage of materials should be of 350 Sq Feet of carpet area and space for ERV & bike Parking. Office facility should include toilet/washroom, electricity bill, rent agreement, etc. Office preferably be at ground floor. Office space, interior, should be finalized on satisfaction of EIC.
NOTES: 1) PLEASE ENTER SERVICE CHARGES FOR ITEM NO. 2 TO 6 AND ENTER UNIT RATE FOR ITEM NO. 8 TO 10. 2) Service charge per man-month: This covers the manpower management like appointment of the manpower as define in tender including the reliever etc. it also covers all the scope defined in the tender like, transport, handling of manpower, emergency operations, maintenance, leak testing, coordination with MNGL, Govt. authorities, other utility companies, customers, societies, public etc. and any other requirement to ensure the continuous and 24X7 gas supply to customers etc., as per the guidance and satisfactory of EIC. Service Charge inclusive of all taxes & duties except Goods & Service Tax (in Rs.)
TANISHQ INFRATECH
Pattanaik Associate
COMET NETWORK
ROCKERR INFRASOLUTIONS PVT LTD
Shri Ganapati Traders
Gurukrupa Engineering
KUSHAL CONSTRUCTION
Shreenath Construction & labour contractor
GURUKRUPA ENTERPRISE
EMBRACE GAS PIPELINES PVT. LTD.
JAYAM INFRATECH PRIVATE LIMITED
Desco Infratech Pvt Ltd
CHOUDHARY BUILDER & CONSTRUCTIONS
UPADHYAY CONSTRUCTION PVT LTD
Shree Polkaji Enterprises
SUNDARAM CONSTRUCTION AND ENGINEERING
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .