Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | ₹10.4 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 3 | Rejected-Technical VENGARA TIRURANGADI | KANNUR | KERALA | 670612 | - | - | Rejected-Technical L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | XAVIER GEORGE L3 | sebastian kappen L4 | MOHAMMAD KUNHI L1 | MOHAMMED SALIH V K L2 | KAPPEN BUILDERS & DEVELOPERS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Water tank and drinking water supply | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10.58 | cum | 348.9 ₹3,692.76 | 359.36 ₹3,803.47 | 302.16 ₹3,198.06 Lowest | 346.05 ₹3,662.59 | 400 ₹4,233.6 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.32 | cum | 7,694.9 ₹10,180.35 | 7,924.96 ₹10,484.72 | 6,663.63 ₹8,815.98 Lowest | 7,631.44 ₹10,096.4 | 8,500 ₹11,245.5 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 11.52 | sqm | 374.58 ₹4,315.16 | 385.77 ₹4,444.07 | 324.99 ₹3,743.88 Lowest | 371.49 ₹4,279.56 | 400 ₹4,608 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 13.92 | sqm | 739.99 ₹10,300.66 | 762.12 ₹10,608.71 | 640.82 ₹8,920.21 Lowest | 733.89 ₹10,215.75 | 800 ₹11,136 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 14.4 | sqm | 978.29 ₹14,087.38 | 1,007.54 ₹14,508.58 | 847.18 ₹12,199.39 Lowest | 970.23 ₹13,971.31 | 1,050 ₹15,120 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 6.96 | sqm | 932.4 ₹6,489.5 | 960.28 ₹6,683.55 | 807.44 ₹5,619.78 Lowest | 924.71 ₹6,435.98 | 1,050 ₹7,308 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 12 | metre | 221.2 ₹2,654.4 | 227.9 ₹2,734.8 | 191.63 ₹2,299.56 Lowest | 219.46 ₹2,633.52 | 300 ₹3,600 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 752.4 | kilogram | 109.1 ₹82,086.84 | 112.32 ₹84,509.57 | 94.44 ₹71,056.66 Lowest | 108.16 ₹81,379.58 | 150 ₹1,12,860 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.3 | cum | 10,174.11 ₹23,441.15 | 10,478.28 ₹24,141.96 | 8,810.57 ₹20,299.55 Lowest | 10,090.2 ₹23,247.82 | 10,650 ₹24,537.6 |
Tender Value
₹12.4 L
EMD Value
₹31,040
Closing Date
20 Jul 2026, 3:00 pmClosed
Assistant Engineer
Office of the assistant engineer LID and EW Section Malampuzha GP
Annual Plan-Malampuzha Grama Panchayath 2025-26 Chembana Kudivella padhadhi-Project No. 317/26-General Civil Work
2026_LSGD_859808_8
T/01/AE/LIDEW/MPZA/2026-27
Open Tender
Civil Works - Others
Item Rate
180 days
MALAMPUZHA GP
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹31,040
Yes
19 Sept 2026
9 Jul 2026
22 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Water tank and drinking water supply | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.005 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.009 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_1453982.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1453982.xls
BOQ • 0.32 MB
viewsbd.pdf
Tender Documents • 1.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .