Nodal Officer, WDC 2.O Project C/o Project Director District Watershed Development Unit, Dang-Ahwa
WDC 2.O Supplementary DPR- Constructing Farmpond No.2, Gabian Structure Nos.4 at Village Galkund
279335
Tender Issue No.: 03 /WDC 2.0 Purak DPR 2025-26
Open
Civil Works - Others
Works
Dang
8 documents required · 5 mandatory · 3 optional
₹900
DWDU DANG PROJECT FUND BATCH-6
₹5,099
21 Feb 2026
21 Feb 2026
21 Feb 2026
9 Mar 2026
21 Feb 2026
Name of work :-
Under Workphase Head : WDC 2.O Supplementary DPR- Workphase: Supplementary
DPR- Constructing Farmpond No.2, Gabian Structure Nos.4 at Village Galkund
PMKSY – WDC 2.O /02/2021-22 Kanchanghat Project
(Supplementary DPR)
Watershed Committee-: Galkund
1 Downloading of tender documents(Last Date and Time) 09-03-2026 –18:00
2 Online Submission of bid (Last Date and Time) 09-03-2026 –18:00
Submission of EMD, Tender Fee and mentioned documents 12-03-2026 –18:00
(Last Date and Time)
Technical Bid: Online Verification of documents(Date and 13-03-2026 –12:00
5 Online opening Commercial Bid (Date and Time) 13-03-2026 –12:30
6 Estimated cost of work. Rs.5,09,864/-
Demand Draft of Tender fees from any nationalised bank will
7 be in favour “DWDU DANG PROJECT FUNDBATCH-6” Payable at Rs.900/-
Demand Draft of EMD from any nationalised bank will be in
8 favour “DWDU DANG PROJECT FUNDBATCH-6” Payable at Rs.5,099/-
Tender document issued by: Tender bid submission address :
President Nodal Officer, WDC 2.O,
Village Watershed Committee C/o Project Director, District Watershed
Galkund Development Unit, Ahwa
Beside DEE (R&B) Panchayat Division-1 Ahwa,
Nr.Shardha Hospital, Taluka Ahwa District
Under WorkphaseHead : WDC 2.O Supplementary DPR- Workphase: Supplementary
DPR- Constructing Farmpond No.2, Gabian Structure Nos.4 at Village Galkund
પ્રોજેકટન ું નામઃ-WDC 2.O/02/2021-22 કાુંચનધાટ પ્રોજેકટ તાલકોઃઆહવા જિલોઃડાુંગ
જિલા િ્રાવ સવકામ કમત તનતગતનક મુંકજત િ્રાવ સવકામ કામ હેમ હ ્ WDC
કાુંચનઘાટ પ્રોજેકટ મુંજર થમે છે . જેના ગામઃ Galkund, તા.આહવા જી.ડાુંગ હ ્ આ પ્રોજેકટ માટ
1 Jakhana F/620/DANG 23/02/2023 Gujarat/637/dang 23/02/2023
2 Chinchpada (Galkund) F/621/DANG 23/02/2023 Gujarat/638/dang 23/02/2023
3 Galkund F/612/DANG 04/02/2023 Gujarat/629/dang 04/02/2023
4 Pipalpada (Galkund) F/619/DANG 23/02/2023 Gujarat/636/dang 23/02/2023
5 Mohpada (Galkund) F/617/DANG 23/02/2023 Gujarat/634/dang 23/02/2023
6 Vanar F/609/DANG 04/02/2023 Gujarat/626/dang 04/02/2023
7 Ambalia F/615/DANG 04/02/2023 Gujarat/632/dang 04/02/2023
8 Umarya F/610/DANG 04/02/2023 Gujarat/627/dang 04/02/2023
9 Wanki F/618/DANG 23/02/2023 Gujarat/635/dang 23/02/2023
10 Payarpada F/613/DANG 04/02/2023 Gujarat/630/dang 04/02/2023
11 Ranpada F/611/DANG 04/02/2023 Gujarat/628/dang 04/02/2023
12 Bhapkhal F/614/DANG 04/02/2023 Gujarat/631/dang 04/02/2023
13 Bhurapani F/616/DANG 04/02/2023 Gujarat/633/dang 04/02/2023
GST અંગે સ ૂચના
તા. ૦૧/૦૭/૨૦૧૭ થક GST કરમા્ખ ું અમમાું આવે છે . જે અનમાર મદર કામમાું GSTમાું
ગાુંધકનગર દ્વારા સ ૂચના આપવામાું આવે છે . જે ધ્માને ઈ GSTનાું નવા કરમા્ખા અનમાર
ટન્ડર ભરવાના રહશે. ટન્ડરમાું ભર ભાવો GST તથા અન્મ ટક્ષ મહીતનાું ગણવામાું આવશે
પાછ્થક ટન્ડરમાું GSTનાું કારણે નાણાુંકીમ ભારણ આવે છે . તેવક રજઆત ગ્રાહમ રાખવામાું
૪. ટેન્ડર ફીની રકિન ડીિાુંડ ડ્રાફ્ટ (Payableat.........................)
૫. બાનાની રકિન એફડડીડઇર(Payableat.............................) (પ્રથમ પેઇિમાું દશાણવ્મા મિબ હેમ નું.૮)
> .-એફડડીડઇરડ (e-FDR) ચલાિિાિાું ઇિ્ે નરહિં,
૭. GST રજી્રસશનન ું પ્રમાણ પર.
૧૧. WDT સમસવ ઇિનેર/WDT ગ્રકકલચર ક્સમપટણ નક સચના પ્રમાણે કામ કરાવવાના િથ્થાને
૧૮. કામગકરીન ું આખરી બક MDT સમસવ ઇિનેર દ્વારા ચકામણક કમાણ બાદ CC આપવાન ું રહશે.
૨૪. જબનક રકમમાુંથક કપાતપાર બનતક હશે, તે TDS તથા અન્મ િરૂરી કરનક રકમ જબમાુંથક
૨૬. સવવાદનક બાબતમાું પ્રોજેકટ ડામરક્સટર્ક, DWDU-ડાુંગ અને ચેરમેન્ક,DWDU- ડાુંગ, જિલા
માટ કામ પહાનાું ેવ તથા T.B.M વગેર WDT ઈિનેર પામે ખરાઈ કરાવક ેવા.
૨૯. કામ પ ૂણણ થમા બાદનાું ફાઈન ેવ અને માપ કોન્્રસાક્સટર WDT ઈિનેર/માથે રહી ેવાનાું
રહશે. WDT ઈિનેર દ્વારા ેવામાું આવે માપો માન્મ રહશે અને મમમ મમાણદામાું
MDTઈિનેરદ્વારા ેવામાું આવે માપો માન્મ રહશે.
ઓદફમર અને WDT ઈિનેર પામેથક પ્રમાણકત કમાણ બાદ જે આગ્નક કામગકરી હાથ
૩૬. કામગકરી માટ જે – તે ખાતાનાું SOR ેવામાું આવ્મા છે , તે આઈટમ માટ જે- તે ખાતાનાું
૪૭. મુંજર થમે ટન્ડરના કામોનો જાણવણક (MAINTANANCE)નો મમમગા્ો બે વર્ણનો રહશે.
5&P ;\A\lWT V[Hg;L T[G[ ;F\[5[, SFDULZL lGIT U]6J¿F;EZ VG[ ;DIDIF"NFDF\
SZJFDF\ lGQO/ HX[ TF[ H[ T[ V[Hg;LG[ GF[8LX VF%IF AFN TFtSF,LS V;ZYL
SFDULZL 5ZYL N]Z SZLG[ lGIDF[G];FZ H[ V[Hg;L VF NZYL SFDULZL SZJF ;\DT
CX[ TF[ T[G[ ;]lRAwW SZL SFDULZL ;F\[5JFDF\ VFJX[P ;DI VG[ U]6J¿FGF[ VD,GF\
SFDF[ DF8[ B]A H DCTJ5}6" CF[I T[DF\ SF[.56 ;\HF[UF[DF\ AF\WKF[0 R,FJL ,[JFDF\
VFJX[ GCLP U]6JTF V\U[GF[ VFBZL lG6"I H[ T[ ;\A\lWT 5|FIMHGF lGIFDSzLGL
5]lQ8GL XZT[ SZL XSX[P
5*P YI[, SFDULZLGL R]SJ6L YIF 5KL T[GL U]6JTF VYJF HyYFDF\ SF[. 1FlT HF[JF
D/X[ TF[ V[Hg;LG[ N\0 SZJFDF\ VFJX[ VG[ H~ZL H6FI TF[ T[G[ V;]lRAwW SZJFDF\
5(P SFDULZL JW] ;FZL ZLT[ Y. XS[ T[ DF8[ XZTF[ VG[ lGIDF[GF\ VY"W8G V\U[GF[
VAFlWT CSS 5|FIMHGF lGIFDSzLGF[ ZC[X[ VG[ H[ T[ V[Hg;LG[ T[ A\WGSTF" ZC[X[P
5)P .HFZNFZ[ DMS,[, V[OP0LPVFZP SFDGL ZSDGF !@ CMJL HM.V[4 V[OP0LPVFZPGM
;DIUF/M ! JQF"GM CMJM HM.V[4 GF D\H]Z YI[, .HFZNFZGL V[OP0LPVFZPq.PV[DP0LP
V+[ YL D]ST ccZL,Lhcc SZJFDF\ VFJX[P
&_P .vV[OP0LPVFZP R,FJFDF\ VFJX[ GlC\4 VG[ V[OP0LPVFZPq.PV[DP0LP 5|YD 5[.HDF\
H6FjIF D]HAGF GFDGL CMJL HM.V[P
&!P 8[g0Z GM8L;DF\ lGWF"lZT SZ[, TFZLB[ VlGJFI" ;\HMUMGF SFZ6[ HM H[ T[ ;DI[ BM,L G
XSFI TM ALÒ TFZLB OF/JJFDF\ VFJX[P
&ZP jIlSTUT VF5[, ,FE CMI TM T[ SFDGL 5CM\R D[/JL ,[JFGL ZC[X[P
પ્ર જેકટન ુંુ નાિઃ WDC 2.O/02/2021-22કાુંચનધાટપ્ર જેકટ િાલકુ ઃ ઇહિા,ઇહિા
SFDGM SFDMGL WDC 2.0 C[9/ ZSD
S|D SFDGM C[0 UFDG]\ GFD SFDG]\ GFD
5|SFZ ;\bIF s,FBDF\f
1 H/;\HIGF SFDM U,S]\0 B[TT,FJ0L G\U 2
2 ;\Z1F6GF SFDM
U,S]\0 U[A[IG :8=SRZ G\U 4
sV\S[ ~l5IF 5F\R ,FB GJ CHFZ VF9;M RM;9 5]ZFf
5}ZS 0LP5LPVFZPJQF" o Z_Z5vZ&4 lJUTJFZ SFDMGL lJUT
S|D UFDG]\ ;J[" SFDGL TF\l+S D\H]ZLGL
SFDG]\ GFD ,FEFYL"G]\ GFD
G\P GFD G\AZ ;\bIF ZSD
1 U,S]\0 B[TT,FJ0L ZFDR\NEF. UMlJ\NEF. JFW 107 1
2 U,S]\0 B[TT,FJ0L U]gTLA[G SF/]EF. UF\U]0[" 105 1
3 U,S]\0 U[A[IG :8=SRZ ;FD}lCSv! SMTZ 1
4 U,S]\0 U[A[IG :8=SRZ ;FD}lCSvZ SMTZ 1
5 U,S]\0 U[A[IG :8=SRZ ;FD}lCSv# SMTZ 1
6 U,S]\0 U[A[IG :8=SRZ ;FD}lCSv$ SMTZ 1
sV\S[ ~l5IF 5F\R ,FB GJ CHFZ VF9;M RM;9 5]ZFf
8[g0Z V[,P! TZLS[ D?IF AFN .HFZNFZ[ ZH] SZJFGL lJUTP
:JrK VG[ ;]NŸ0 JF\RL XSFI T[JF :5Q8 V\U|[Ò S[5[8, V1FZMDF\ .HFZNFZ wJFZF GLR[
D]HAGF 5+SDF\ JS"VM0"Z D?IF AFN V[Hg;LV[ ,[8Z5[0 p5Z DFlCTL lNGoZ DF\ V+[GL
SR[ZLV[ lC;FAL XFBFDF\ ZH] SZJFGL ZC[ K[P
.HFZNFZqV[Hg;LGM AFIM0[8F
VF 5+S ;FY[ s!f A[gS V[SFpg8 5F;A]S VYJF K[<,L A[gS :8[8D[g8GL h[ZM1F sZf
ÒPV[;P8LP ;8L"lOS[8 s#f ZÒ:8=[XG s$f 5FGSF0" SM5L ;lCql;SSF ;FY[ ZH] SZJLP
!P .HFZNFZG]\ GFD s5]Z[
ZP V[Hg;LG]\ GFD sW\WFG]\
#P ;ZGFD] D]PPPPPPPPPPPPPPPPPPPPPPP 5MP PPPPPPPPPPPPPP
O/LI] PPPPPPPPPPPPPPPPPPPP TFPPPPPPPPPPPPPP
ÒPPPPPPPPPPPPPPPPPPP 5LG SM0PPPPPPPPPPPPP
5P 5FGSF0" G\AZ
&P DMAF., G\AZ D]bI DMPG\P o !PPPPPPPPPPPPPPPPPPPPPPPPPPPP
V<8ZG[8 DMPG\Po ZP PPPPPPPPPPPPPPPPPPPPPPPP
(P .HFZNFZqV[Hg;LG]\ H[ o
A[gSDF\ SZ\8 V[SFpg8
)P A[gS V[SFpg8 G\AZ o
VF.PV[OPV[;P ;LP
!!P VFWFZSF0" G\AZ o
TFZLB o ;lCql;SSF
8[g0Z V[,P! TZLS[ SFD 5}6" YIF AFN .HFZNFZ[ AL, ;FY[ ZH] SZJFGL lJUTP
s!f VF.P0LP JFZ vOM<0Z AGFJLv UFDJFZ4 SFDJFZ SFD X~4 RF,] SFD4 5}6" YI[,
SFDGM OM8MU|FO; OZÒIFT ÒP5LPV[;P ,MS[XG N[BFI T[ ZLT[ OM8MU|FO; ;MO8
SM5LDF\ VG[ CF0"SM5LDF\ V[D AgG[ 5|SFZ[ V+[ ZH] SZJFGF ZC[X[P
sZf SFDGF OM8MU|FO; A[J0FI G HFI T[G]\ wIFG ZFBJFG]\ ZC[X[4 H[GM VD, R]:T56[
s#f AL, ;FY[ OZÒIFT p5Z D]HAGM .HFZNFZ AFIM0[8F V+[GL SR[ZLDF\ lC;FAL
XFBFDF\ ZH] SZJFGF ZC[X[P
s$f jIlSTUT YI[, SFD[ VF5[, ;FWG ;CFI V\U[GL 5CM\R4 JM8ZX[0 ;lDlT VG[
.HFZNFZGL ;\I}ST ;lC YL D[/JL AL, ;FY[ ZH] SZJFGL ZC[X[P
SR No. Descriptions Unit Rate Amount
Item No:- 2 Excavation for Foundationin in
all Sorts of soil including,Yellow,
Sandy,Gravelly Soil soft &Hard
Murrum,etc.dry condition including the 280.00 Cu.m 81.50
excaveted stuff in uniform layersin blanksor
1 as directed etc.Complete forlead up to1.0
Km.and all lifts.(By Machinery)
SOR( S.G.) N.W.R.W.S &K.DEPARTMENT.
Item No:- 2 Excavation for Foundationin
soft Rock including disposting the
excaveted stuff as and where directed
etc.complete for lead up to 1 k.m.and all
2 lifts(By Machinery )
SOR( S.G.) N.W.R.W.S &K.DEPARTMENT.
Item No :- 3 Deta board (Bord 0.60m x
0.40m.)Angle40 mmx40mmx6mm 1.00 Nos. 2571.25
3 SOR( S.G.) N.W.R.W.S &K.DEPARTMENT.
P.P.Woven U.V.Staibilised fabric 220 GSM 676.00 Sq.m 86.29
Drawing Activity No.
Name of Activity : Gabian Structure
Qty. Particulars Rate Per Amount
Item No:- (1) Excavation for trialpits,
trenches and quarry expleration in all
sorts of soil in cluding yellow, sandy and
gravelly soils, soft murrum in luding is
posing of the excavated stuff as and
where directed etc. complete without
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no : (2) Suplying and Laying trap
Rubble stone of UP to10 kg in weight for
toe and core filling including conveying
and stacking to required line m level slope
section including all leads and lifts.
Conveyingmaterials from stacks and
laying etc complete.
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no :- (3) Gabion 1.00mx 1.00m x
0.60m P.P. Woven 9 mm dia.(100 mmx
S.O.R. N.W.R.W.S & K DEPARTEMENT
Statement : 2S.r. No.298 Pg.No.77
Item no :-(4) Data board (Board 0.45mx
0.30 m,Angle 40 mmx 40mm x 6 mm)
1.00 S.O.R. N.W.R.W.S & K DEPARTEMENT 1172.32 Nos.
Statement : 2S.r. No.254 Pg.No.76
Drawing Activity No.
Activity No.4,5
Qty. Particulars Rate Per Amount
Item No:- (1) Excavation for trialpits,
trenches and quarry expleration in all
sorts of soil in cluding yellow, sandy and
gravelly soils, soft murrum in luding is
posing of the excavated stuff as and
where directed etc. complete without
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no : (2) Suplying and Laying trap
Rubble stone of 10 to 50 kg in weight for
toe and core filling including conveying
and stacking to required line m level slope
section including all leads and lifts.
Conveyingmaterials from stacks and
laying etc complete.
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no :- (3) Gabion 1.00mx 1.00m x
0.60m P.P. Woven 9 mm dia.(100 mmx
S.O.R. N.W.R.W.S & K DEPARTEMENT
Statement : 2S.r. No.298 Pg.No.77
Item no :-(4) Data board (Board 0.60mx
0.45 m,Angle 40 mmx 40mm x 6 mm)
1.00 S.O.R. N.W.R.W.S & K DEPARTEMENT 1172.32 Nos.
Statement : 2S.r. No.256 Pg.No.76
Drawing Activity No.
Technical Specification
Excavation in all sort of soil strata and formations including depositing the unuseful
excavated stuff as and where directed incl. sorting & stacking useful materials as
required and up to lead of 200mt. and all lifts etc. complete including dewatering.
Specifications and requirement laid down in general technical specification for EARTH
WORK shall apply.
The scope of this item of work includes back filling by quarrying, transporting the
suitable materials from borrow areas or suitable excavated stuff with all lead, all lift
and laying, spreading in specified layer with necessary dressing, finishing, ramming
and consolidation by hand tamping etc. complete.
Specifications laid down in general technical specification for EARTH WORK shall
apply. Suitable materials shall be stacked in piles and same shall only be spread after
approval of department. Spreading in specified layer can be performed by suitable
machinery or by manually. Embankment material shall be free from all perishable or
unsuitable material; if found shall be removed during embankment operation and
embankment shall be cleaned. The bond between old and new earth
work/embankment shall be carried out by loosened the old embankment surface by
means plough, ripper or other suitable method or providing steps as per site
The work shall have to carry out with best workmanship manner with the use of
modern earth work machineries as specified in general technical specifications.
MEARSUREMENT AND PAYMENT:
The payment of this item shall be made on cubic meter basis of the completed work in
all respect. The mode of arriving at quantities payable under this item shall be
governed as mention in general technical specification for earth work.
Providing and laying position” NOMINAL MIX” cement concrete using cement, sand
and H. B. METAL by mass and machine mix for PCC including necessary form works
compaction ramming, curring as directed with all lead & lift etc. complete for
Foundation Concrete other general purpose 2(a) M-10 Metal size 40 to 63mm.
i)CEMENT: Specification m-2 of specification of material section shall apply. ii)
WATER: Specification m-1 of specification of material section shall apply. iii) SAND:
Specification m-3 of specification of material section shall apply. Sand shall be
used after proper screening only.
iv) STONE: Specification m-5 of material section shall apply.
General technical specifications for concrete works shall apply here also. Concrete mix
shall be “NOMINAL MIX” or as decided by engineer in charge, and is to be design by
preliminary tests in the laboratory. The proportions for ingredients shall be by mass
only except for water. The grade of concrete shall be M-7.5 (1:4:8) with M.S.A. 40 or
The scope of work under this item includes doing C.C. at various work locations and
compartments as classified under the item including providing and supplying all
materials labours and use of equipment machinery with providing, erecting and
dismantling of necessary formwork and centring.
The scope of work also incl. laying of concrete in position as directed by machinery or
by manually with compaction by means of needle of surface vibrator together with
finishing the expose surface of concrete work to obtain dense and compact surface,
curing for a specified period etc.
Specifications for workmanship laid down in general technical specifications for
concrete works shall apply here also. The workability of the concrete mix shall be
controlled by maintaining a w/c ratio that is bound to give a concrete mix which is just
sufficiently wet to be placed and compacted without difficulty with the means
MODE OF MEASUREMENT AND PAYMENT:
The rate shall be for a unit of one cubic meter. The consolidated cubical contents of
concrete work as specified in item shall be measured. The concrete laid in excess of
section shown on drawing or as directed shall not be measured. No deduction shall be
i) Ends of beams, girders, joist, steps, posts, etc. of similar materials up to 500 sq.cm. In
section. ii) Opening up to 0.1 sq.mt. in area.
The rate includes cost of all materials, labour, tools and plants required for mixing,
placing in position, vibrating and compacting, finishing, as directed, curing and other
incidental expenses for producing concrete of specified strength. The rate includes
cost of formwork.
Prov. & Laying in position cement concrete using cement, sand and crushed metal
coarse aggregate by mass and machine mix for PCC/RCC including necessary
formworks compaction by vibrator, curing as directed with all lead & lift etc. complete.
(Excluding cost of steel) FOR BODY WALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC. 4/c Concrete Grade M-15 and MSA-
i) CEMENT: Specification m-2 of material section shall apply.
ii) WATER: Specification m-1 of material section shall apply.
iii) FINE AGGREGATE: Specification m-3 of material section shall apply.
iv) COARSE AGGREGATE: Specification m-4 of material section shall apply.
General technical specifications for concrete works shall apply here also. Concrete mix
shall be "nominal mix" or design mix as decided by Eng. I/c. and is to be design by
preliminary tests in the laboratory. The proportions for ingredients shall be by mass
only except for water. The grade of concrete shall be M-15 (1:2:4) with size of
aggregate MSA-40mm.
The scope of work under this item incl. doing C.C/ R.C.C. at various work locations and
compartments as classified under the item incl. providing & supplying all materials,
labours and use of equipment machinery with providing erecting and dismantling of
necessary formwork and centeing. The scope of work also incl. laying of concrete in
position as directed by machinery or by manually with compaction by means of needle
of surface vibrator together with finishing the expose surface of concrete work to
obtain dense and compact surface, curing for a specified period of 28 days.
Specifications for workmanship laid down in general technical specifications for
concrete works shall apply here also. The workability of the concrete mix shall be
controlled by maintaining a w/c ratio that is bound to give a concrete mix which is just
sufficiently wet to be placed and compacted without difficulty with the means
MODE OF MEASUREMENT AND PAYMENT:
The rate shall be for a unit of one cubic meter. The consolidated cubical contents of
concrete work as specified in item shall be measured. The concrete laid in excess of
section shown on drawing or as directed shall not be measured.
The rate includes cost of all materials, labour, tools and plants required for mixing,
placing in position, vibrating and compacting, finishing, as directed, curing and other
incidental expenses for producing concrete of specified strength. The rate includes
cost of formwork.
Providing and fixing in position white marble plate of size 45x45x1.8 cm incl.
engraving the letters as per drawing/as directed etc. complete.
MARBLE PLATE:Marble shall be of good quality white of fine grain.
GENERAL: SCOPE OF WORK: WORKMANSHIP:
The scope of item includes providing, engraving letters and fixing marble plate of size
45 X 45x1.80 cm as and where directed with all lead & lift. The work shall be carried
out with best workman like manner. The marble shall be of good quality, fine grained,
hard, uniform and homogeneous in texture. The marble shall have crystalline grain
and free from any defects and cracks. The front face shall be of machine polished one
and rear side shall be rough to provide good bond to cement mortar. The letters of
required size, font and lipi shall be engraved by best artisan as directed by engineer in
The wall surface shall be covered with 10mm thick rough cement mortar 1:3 plaster
and allowed to harden. If it is to be fixed on already plastered surface, then, plaster
shall be roughened by chisel. The rates are inclusive of cement plaster & cement
mortar / slurry. The back of marble plate shall be floated with cement slurry and fixed
to the surface by gentle tapping with wooden hammer. All the four edges shall be
flushed with vata. The work shall be kept wet for seven days.
MODE OF MEASUREMENT AND PAYMENT:
The work shall be paid on number basis of completed work.
GENERAL TECHNICAL SPECIFICATION
1.1 Water shall not he salty or brackish and shall be clean,
reasonably clear from objectionable quantities of silt and
traces of oil and injurious alkalies, salts, organic matter and
other deleterious material which will either weaken the mortar
of concrete or cause efflorescence’s or attack the steel in R.C.C.
the PH value of water shall generally be not less than
Container for transport, storage and handling of water shall be
clean and only potable water shall be use in the work.
1.2 Water for curing, mortar, concrete or masonry should not be too acidic
or too alkaline. It shall be free of elements which significantly affect
the hydration, reaction or otherwise interfere with the
hardening of concrete during curing of those which
produce objectionable stains or other unsightly deposits on
concrete or mortar surface.
1.3 Hard and bitter water shall not be used for curing.
1.4 Potable water will be generally found suitable for preparation and
curing of mortar or concrete.
1.5 Testing of water shall be done at Government at his own cost if
directed by Engineer-in-charge.
2.1 The contractor shall have to make his own arrangement to procure the
cement bearing I. S. I. (B.I.S.) mark, directly from the manufacturer or
from the authorized dealers of such manufacturer. For the
verification of such purchases the contractors shall have to
produce the bills of manufacturer or its authorized dealer along with
testing details of the Engineer-in-charge. The cement brought at
the site by the Contractor shall be tested prior to its use in work.
For testing of cement one sample for every lot (one time stacking of
cement bag on site of work) of cement shall be drawn & tested for
necessary qualitative tests, as per I. S. 12269-1987. The cement not
satisfying the criteria, as per I. S. shall be rejected& hence work done
by contractor shall have to remove from the site immediately at his
own risk & cost.
The cement shall O.P.C. type and shall conform to I.S.I. specifications
cement shall be fresh and stacked at site as directed by Engineer-in-
charge of the work on a dump proof floor and in a weather proof
shed. It shall be stacked on work site to prevent deterioration as
specified, in storage specification of the cement marketing company,
cement which is market from authorized dealer.
2.2 As the cement is available in bags, the contractor shall provide at the
site of work, satisfactory for not less than three months’ average
Consumption on works and shall keep the cement stored in manner
that shall satisfy the Engineer. The arrangement of storage and
utilization shall be such as to ensure the utilization of cement in the
order of its arrival at the storage and the Contractor shall
maintain satisfactory records, which would any time show the dates
of receipt and processed utilization of cement laying in store at site.
2.3 Engineer-ln-charge shall at all time, have an access to the stores at
site and shall authority to check and examine the method of storage,
accounting and security provided by the Contractor. The contractor
shall comply with instruction. The Contractor shall further at all times,
satisfy the Engineer for his demand for the production of records or
books or submission of returns and Performa of other proofs that may
be demanded in order to prove that the cement brought to site being
used. The Contractor shall, at all times keep his records up-to-date to
enable the Engineer to apply such checks as he may desire to
3.1 Sand be natural sand, clean, well graded, hard strong durable and gritty
particles five from injurious amounts of dust clay, kankar, soft or flaky
particles shale, alkali, salts, organic matter, loom, mica or other
substance and shall be got approved from the Engineer-in-charge.
The sand shall not contain more than 5 % of silt as determined by field
test. If necessary, the sand shall be washed to make it clean.
3.2 The fineness modules of sand shall not be less than 2.6 and exceed
3.3 All the fine aggregates shall confirm to I. S.383-1970 as directed by
Engineer-in-charge.
3.4 Sand for use on work shall natural river sand or crushed sand of
crushed gravel of their mixture in specified prescription. The sand
shall consist of hard, dense, uncoated siliceous grains of such
fragment and shall be free from the injurious of amounts of dust,
lumps, soft of flaky particlesshales, alkali, organic matter, looms,
mica and deleterious sub stances.
3.5 IMPURITIES:
3.5.1 Materials passing on No. 200 B.S.S. Sieve 5 by weight for crushed
gravel for sand, 10 % by weight for crushed rock.
Shale 1 percent by weight
Coal 1 percent by weight
Clay lumps 1 percent by weight
Other impurities 2 percent by weight
3.5.2 Deleterious substance such as Alkali, Mika coated grain and soft
flaky particles shall not be used.
3.5.3 The sum of the percentage of all deleterious substances in any cases
shall not exceed 5 percentages by the weight. Sand be free from
organic purities.
The sand shall he graded screen analysis shall confirm one of
gradation limit grading zone I to IV specification in I.S. 383-1970 vide
Table No. Mentioned below.
FINE AGGREGATE TABLE NO.
Percentage Passing
Grading Grading Grading Grading
Zone-I Zone-II Zone-III Zone-IV
3.7 Fineness modules
The sand shall have fineness modulus ranging between 2.6 to 3.2 the
fineness modules being computed by adding cumulative percentage
of sand retained on six standard sieves ranging front 4.75 mm
micron incisive & dividing the sum by
The contractor shall have to make his own arrangement to produce
the steel bearing ISI marks directly from the manufacturer or
from authorized dealers of such manufacturer. For verification of
such purchased, the contractor shall have to produce the bill if
manufacturer of authorized dealer along with testing details to the
Engineer-in-charge. In case of doubt of site by the contractor shall be
tested by the Department as per concrete IS Mild Steel bar
reinforcement for R. C. C. work shall confirm to IS 32-1982 and shall be
tested quality. In case of doubt after conducting the necessary
qualitative test as per IS 456-1978. Department will accept the steel.
The steel not satisfying the criteria as per I.S. shall be rejected and
contractor shall have to remove from the immediately at his risk and
5.0 COARSE AGGREGATE
5.1 Course aggregate shall be machine crushed stones of black trap or
equivalent and be hard, strong, dense, durable, clean and free from
skin and coaling which may likely to prevent proper adhesion of
mortar. Coarse aggregate shall consist of uncoated hard, strong,
dense and durable of locally available stone for 1 :4:8 and crushed
black trap stone for 1: 1½: 3, 1:2:4 and 1:3:6. (In the event of
some special work, the hand broken coarseaggregate may have to
5.2 The aggregate shall generally he cubical in shape. Unless special stones
of particular quarries are mentioned, aggregates shall be
machine crushed (Maud broken when specified) from the best black
trap of equivalent hard stone as approved by Engineer-in-charge.
Aggregate shall have no deleterious reaction with cement. The size of
the coarse aggregate for plain cement concrete and ordinary
reinforced cement shall generally be as per the table given below.
Percentage passing for single size aggregate of Percentage passing for graded
normal size aggregate to normal size
Note: This percentage may be varied somewhat by Engineer-in-charge
when considered necessary for obtaining better density and
strength of concrete.
5.3 However exact grading required to produce a dense concrete of
specified strength and desired workability shall be decided
by Engineer-in-charge by carrying out be carried accordingly.
5.4 IMPURITIES:
It shall be free from disintegrated stone soft flaky and elongated,
particles,salt alkali,vegetable,matter and other deleterious
materials in such quantities as to reduce strength and durability
of concrete or to attach steelreinforcement it shall be
generally simply with the I.S. 383-1970. Some of the
important requirements of coarse aggregate as specified in I.S.
38.-1970 issummarized below
The amount of deleterious materials in coarse aggregate
shall not exceed the percentage of limits given below in Table
No.2. When tested by method described inI.S.2383-1963 and the
sum of percentage of all deleterious materials (except mica) shall
not exceed the limit of 5 percentages.
MATERIALS MAXIMUM PERCENTAGE LIMITS BY
(I) DELETERIOUS
Coal and Lignite 1.00
Clay Lumps 1.00
Soft Fragment 3.00 --
Materials passing 75 microns I.S.
CLAUSE DESCRIBED IN APPPAND1X OF I.S. 383-1970
When required by Engineer-in-charge coarse aggregated shall also be
subject to some of following test as he consider necessary in accordance with the
procedure specified in I. S.383-1970.
5.1 The stone shall he of the sped lied variety such as Granite / Quartz / or any
oilier types of good hard locally available stone obtain from quarries as
approved by the Engineer-in-charge. The stone shall be obtained only
from the approval quarry and shall be hard, sound, durable and other
structural defect to like cavities, cracks, sand, holes, flows, injurious veins,
patches of loose or soft material etc. and weathered portion and other
structural defect of imperfection tending to affect their soundness and
strength. The thickness of the stone shall not be less than 15 Cm. The stone
with round surface shall not be used. The stone shall be such as will not
absorb more than 5 % of water. Stone with weathered skin shall not be
5.2 The sample of the stone to be used shall be got approval from Engineer-
in-charge before the work started. Testing of stone shall be done at
contractor’s cost if required as specified by Engineer-in-charge.
(B) WORK PROCEDURE
1.0 ACCURACY OF LINES & GRADES:
The various works shall to be clone true to line, level and grade. The periodical
checking of these by the Government staff does not absolve the contractor of
his responsibility, regarding their accuracy. In case of any deviation or
discrepancy in lines, level or grade, the Contractor shall correct the
discrepancy at his own cost and without any compensation for the
additional work if any involved. Wherever such a discrepancy is found to
arise at the junction of work of different contractor, the relative liability to
set right their respective discrepancy shall be fixed by the Engineer whose
decision shall be final and binding to the rectify the contractor concerned.
The Engineer shall, further have the authority if needed to rectify the
discrepancies and recover the costs from the contractor or contractors
according to proportions, as he may consider reasonable.
2.0 TESTING OF MATERIALS:
2.1 All materials before being incorporated in the work shall be inspected and if
necessarytested before approved by the Engineer-ln-charge.
Any work on which such materials are used without prior inspection and
without approval or written permission of the Engineer-ln-charge is liable to
considered as unauthorized, defective and not acceptable.
2.2 The Contractor shall supply all the materials required to be tested and also
make good at his costs as may be directed by Engineer-ln-charge for his
satisfaction. An authorized representative of the contractor shall remain
present at the time when the samples or course etc. are taken and shall
authenticate the facts, if so required. If the contractor’s agent fails to
remain present as aforesaid samples of cores etc., taken by the Engineer
or his representative shall be considered to be authentic. The contractor shall
however, be informed of the details of such samples and cores etc., having
2.3 The various materials and cubes shall be tested periodically as per
requirement at the Government Approved Laboratory or Q.C. sub
division or GERI and the results given thereby shall be considered
correct and authentic to the contractor. The Contractor shall be
given access to operations and tests that may be carried out
aforesaid to that he may satisfy himself regarding the procedure
and methods adopted, it shall be the contractor’s responsibility
to produce on the work, materials and finished items to the
standard based on the standards based on the laboratory design
2.4 The methods of sampling and testing and the procedures and
standard shall be as laid down by the Engineer-ln-charge from time to
2.5 SAMPLES AND TESTS:
Test of materials and also on the work as laid down will be made by
Government.The contractor shall arrange for collecting and
forwarding the samples to Laboratory as his own cost as may be
required by the Engineer-ln-charge and if so directed shall not lake
use or incorporate in the work any materials represented by any of the
samples, until the required tests have made and materials accepted.
The testing changes for all construction materials shall be borne by
the contractor.
3.0 DEWATERING AND DIVERSION WHERE NEEDED:
(1) The rates also include arrangement for the diversion of water during
construction in the fair weather as well in the monsoon during the ending
period of contract. No payment shall be made for any part of work
materials washed away or damage during the monsoon or other
period and it shall have to be made good by the contractor at his
own cost. It is the responsibility of the contractor to make good repair
any Government property materials to utilized for the present work or
completed part of present work damaged during construction period.
(2) The rate is also inclusive of all labour materials and plants necessary
for the purpose of dewatering, and division as required without any
separate payment in any items of this work.
4.0 CLEARING THE SITE OF WORK:
Trees and Dismantled materials shall be the property of the
Government and shall be carted and stacked at suitable places as
directed by Engineer-ln-charge, and all waste materials decided as
such by the Engineer-ln-charge and All waste materials decided as
such by the proposed site so as not to interface with construction
All clearing operations as above shall be considered as included
in the items of excavation embankment etc. and no extra
payment shall he made for clearing the site work.
5.0 EXCAVATION:
5.1 EXCAVATION IN ALL SOILS INCLUDING HARD MURRUM:
This shall include all excavation done in strata other than rock such
as soil marine clay, chickle, sill, sand, gravel, soft murrum stiff clay,
kankar, hard murrum and other similar materials, all kinds of
disintegrated rock or shale, indulated clay, sand or conglomerate
interspersed with boulder larger than one cubic feet sand or and
less than one cubic yard, which do not need blasting and can be
removed with pick bar, shovel, chisel etc. with same difficulty.
5.2 EXCAVATION IN SOFT ROCK:
This shall include all excavation done in strata which is rock but does
not need blasting and can be removed with pick bar and the shovel. But
which does not come under the category of strata covered under.
5.3 EXCAVATION IN HARD ROCK:
This shall include all excavation done occurring in masses which can
be removed by blasting. This shall also include rock require to be
removed by chiselling where blasting is not permitted. More fact that
blasting has been restored will not qualify for excavation in hard rock.
5.4 THE DECISION:
The decision of the Engineer-in charge for classification of the strata in
case of dispute shall be final and binding to the contractor.
5.5 UTILIZATION OF EXCAVATED STUFF:
The excavated material as found as able in other items of work shall be
the property of the Government and shall be separated by the
contractor as directed be Engineer-in-charge without any extra
Pay line will be as per specified in hereinafter or the actual line of
the excavation, whichever is less.
The pay line be as per the excavation for the foundation shall be
carried out in line, level as per plan. Design or as directed by
Engineer-in-charge.
Overcuts, beyond specified pay of excavation carried out by the
contractor for any purpose or reason, unless by directed by
Engineer-in-charge shall be at the cost of the contractor. Refilling
this overcuts if required shall be contractor or masonry and that shall
be at that cost of the contractor.
Slips in excavation shall be avoided by means of any necessary
shorting and strutting required during excavation. No extra payment
shall be made for any such operation. However, if any slips occur
on account of any reason, Government shall not be responsible
for loss of lives and other damage done on account of such slips or
any other reason. The excavation affected by slips etc. shall promptly
restored to stability. No claim shall be entertained for such slips and
their consequences.
The excavation trenches field up due to monsoon or any other reason
shall be cleared by the contractor directed by Engineer-in-charge
without any extra cost to government.
5.8 DISPOSAL OF EXCAVATED STUFF:
All spoil of excavation shall be removed from foundation and deposited
by the contractor as per instruction of Engineer-in-charge. The
deposited of spoil stuff shall be carefully planned so, is obstruct
traffic lines required for transport of the construction materials of
flow of the water and shall be dumped beyond AHFL line or lead
Mt. otherwise specified andsufficiently away from the edges of
excavation to avoid danger in stability, to permit ample space for
lorry installation or lifting and pumping devices, slaking
construction materials etc. All these operations are included in
corresponding item of excavation and no extra payment shall he
5.9 LEAD AND LIFT:
Excavation material would be deposited within lead and lift as
specified in the item and in spoil or canal hank in particular section
or at a space as directed by Engineer-in-charge.
6.0 CEMENT MORTAR:
6.1 Water: Water shall conform to specification (A)1.0 of this chapter.
6.2 Cement: Cement shall conform to specification (A) 2.0 of this chapter.
6.3 Sand: Sand shall conform to specification (A) 3.0 of this chapter.
6.4 Proportion of mix : Cement and sand be mixed to specified
proportion, sand being measured by measuring boxes. The
proportion of cement will be by volume on the basis of 50 Kg. /Bag
of cement bring equal to 0.034 Cu. M. the mortar may be hand
mixed or machine mixed as directed.
6.5 PREPARATION OF MORTAR:
Hand mixed mortar:
Cement and sand in the specified proportions shall be
thoroughly mixed dry on a clean impervious platform by turning
over at least 3 times or more till a homogenous mixture of uniform
colour is obtained. Mixed platform shall be also arranged that no
extraneous material shall gel mixed with mortar shall flow out. While
mixing, the water shall be gradually added and thoroughly mixed to
form a stiff plastic mass of uniform colour so that each particle of
sand shall be completely covered with a film of wet cement. The
water cement ration shall be adopted as directed. The hand mixing
shall be carried out with prior permission of Executive Engineer
subject to use of 10 % additional quantity of cement.
In machine mix mortar:
The mortar shall be mixed in mechanical mixer. The mixing shall be
continued until there uniform distribution of materials and
homogenous, uniform colour of mix is obtained. The mixing shall be
done for at least two minutes after required quantities of cement, sand
and water places in the drum. The mixing time will be increased if
required uniformity and consistency is not obtained in mix.
6.6 The mortar so prepared shall be used within 30 minutes of adding
water. Only such quality of mortar shall be prepared as can be used
within 30 minutes.
7.1 SCOPE OF WORK:
The work covered by this chapter consist furnishing nil materials,
equipment and labour for the manufacture, transport, placing, finishing
& curing of concrete in structure included in these section and
performing all functions necessary and ancillary there toetc. complete.
The item of concrete will have to be split up to several item according
to the class of concrete to be used and its location and will be
measured and paid for accordingly. The general section described
here in after shall however, in relevance, apply to all concrete items.
7.2 COMPOSITION:
Concrete shall compose of cement, fine aggregate (natural sand)
machine crushed coarse aggregate (or Hand broken rock) or natural
and screened gravel, and water, all well mixed in proper proportion
and brought to the power consistency. Whenever so ordered by the
Engineer-in-charge, admixtures shall be added as stated in the special
conditions. The exact proportion of each such type of aggregate will
be determined and adjusted from time to time, on mechanical
analysis of the aggregate.
The specification for cement, fine sand, coarse aggregate and water
shall be strictly adhered to as directed above in material section.
Aggregate size in different mix shall be as follow.
MIX COURSE AGGREGATE
Forms to confine the concrete and shape it to required lines shall be
used wherever necessary. The forms shall have sufficient strength and
rigidity to hold concrete and to with stand the pressure or ramming and
vibration without deflection from the prescribed lines, the more so when
the concrete vibrated. The surface of all forms in contact with concrete
shall be clean, rigid water right and smooth Suitable devices shall be
used to hold corners, adjacent ends and edges of panels or other
forms together in accurate alignment. Forms shall be so constructed as
to be removed in section without moving or damaging surface of
concrete. Bolls & rods shall preferably be used for internal ties and they
shall be so cut as to remain 1" (25 mm) behind the surface.Unless or
forms to round of or level the edges of the concrete. Temporary
cleaning and inspection immediately before depositing the concrete.
The design of cantering and form work shall be got approves before
erection by the Engineer-in-charge.
(a) At any stage, any grooves, set back etc. if ordered to be provided
by Engineer-in-charge shall be provided as per the instruction with
no extra cost. Any angle B.S.J., M.S. bars or any steel piece required to
be kept projecting out of the concrete surface or any structural
member like pipe, nuts, rods etc. required to be kept inside concrete.
The same shall be placed in position in concrete, in line and level as per
instruction of Engineer-in-charge and centring done accordingly with
no extra costof the labour and the materials for cantering.
(b) Subsequent connecting work of block left out earlier for any
reasonsshall bedone to required line and level. Such concreting shall
have to be done havingthe progress of the work as per instruction
of the Engineer-in- charge.
7.4.2 RE-USE OF FORMS ETC.:
Forms to be sued more than once shall be maintained in
serviceable condition and shall be thoroughly cleaned and
smoothened before being re-used. Where metal sheets arc used
for lining forms, the steel shall be placed and maintained on
form with the minimum amount of wrinkles, humps or other
imperfections. The use of steel metal to correct imperfection in
surface that will be permanently exposed to view shall not be
permitted. All forms shall be checked for shape.
7.4.3 ERECTION AND REMOVAL OF FORMS:
Before placing concrete surface all the forms shall be oiled with
suitable non-staining of such as raw linseed oil so as to prevent
slicking of concrete to facilitate the removal of forms. In case of
wood forms oil should be capable of penetrating the wood, and of
remaining sufficiently oily to eliminate sticking or preventing
absorption of water and consequent warping.
The oil shall be covering the form fully & evenly without excess over
drip. Care shall be taken to prevent oil from getting on surface of
construction joints and reinforcement bars. Special care shall be
taken for narrow grooves. So as to prevent swelling of the forms
and consequent damage to concrete prior to or during the
removal of forms. Immediately before concrete is placed
precaution shall be taken to see that all forms are in proper
alignment and this angles and are thoroughly secure and tight.
Where forms for continuous surface are placed in successive units
the forms shall fit lightly over completed surface, so as to prevent
leakage of mortar from concrete and to maintain accurate
alignment of the surface.
MACHINE MIXING:
The concrete shall be composed of water, cement, fine
aggregate and course aggregates. Each material being approved by
the Engineer-in-charge prior of the mixing.
The proportion of cement, sand and aggregate mixed for
concrete shall be as per grade of the concrete (i.e. 1:4:8, 1:3:6,
1:2:4 etc.) by weight or by volume as directed by Engineer-in-
charge. When volume batching the volume of 1 bag cement will be
considered as 0.034 cum. The wooden measuring boxes should be
field in loose with the materials. The ingredient of concrete shall
be properly mixed in mixers, designed, so as topositively
ensured uniform, distribution of all the component material
throughout the mass at the end of the mixing period. The mixing of
each batch shall continue for about one and half to two minutes, or
as found best practice, after all materials expect, the full amount of
water is in the mixer. The minimum mixing period specified above
assumed proper control of the speed of the rotation of mixer and of
the introduction of the materials including water. The mixing
time shall be increased when charging operation sails to produce
the required uniformity of composition and consistency within the
batch and from batch inclusive mixing, requiring additional water
to preserve the required concrete consistency, shall be avoided, if in
the mixing, the changing operations are such that the required
uniformity of the concrete is obtain in shorter mixing time than
that of the minimum specified without disturbing the specified
needed workability, the mixing time may be shortened under
orders of the Engineer-in-charge. The first batch of concrete
materials, placed in the mixer in each working period shall contain
sufficient excess of cement, sand and water at the rate of 10 % to
coat the inside of drum in order that the required mortar content of
the mix is not reduced. No extra claim for this shall be considered by
the department.
The following general principles shall be followed in preparation of mixing.
(a) The ingredients shall be fed into the mixer simultaneously.
(b) A portion of water (between 5 to 10 p. c.) shall proceed and an
equal quantity shall follow on introduction of other materials. The
remaining water shall be added uniformly and simultaneously with
the other materials.
(c) Care shall be taken that mixing of concrete in the mixer shall be
(d) The mixer shall not be loaded in excess of its rated capacity.
(e) The minimum mixing speed shall not be less than 4 RPM and
peripheral speed of the drum shall be not more than 225 ft./minutes.
(f) The Executive Engineer shall permit the hand mixing and in that
case, the extra 10 % cement shall he added for which no extra payment
HAND MIXING SHALL BE DONE AS FOLLOWS:
Required quantity of cement should be spread on watertight platform
of steel plate, through in uniform layer on lop of measured quantity of
the fine aggregate, so as to have proportion required for the concrete
volume by. Cement and sand shall then be thoroughly mixed, by turning
over four times to be mix uniform colour, this mixer shall be spread
evenly over required quantity of coarse aggregate meta, so as to
have required proportion by volume and mixed dry by running three times
till a homogeneous mix is obtained. Measured quantity of water shall he
added slowly and entire mass turned over. The turning shall he
continued till homogenous Uniform mix is obtained. The hand mixing shall
be permitted by the Executive Engineer and in that case. The
extra 10 % cement shall be added for which no extra payment shall be
The patch shall be placed in position within 20 minutes of its discharge
from the mixer. Any batch remaining unutilized for more than
minutes shall not be allowed to be used in work.
7.6 PLACING OF CONCRETE:
The contractor shall keep Engineer-in-charge informed as to when the
placing of concrete will be performed. Unless instruction is waived in
specified case as directed in writing from Engineer-in-charge. Placing of
concrete shall be performed only in the presence of the authorized
representative of the Engineer-in charge.
Concrete shall be placed only in locations where authorized and no concrete
or mortar shall be placed unit the form works, preparation of surface &
necessary clean up been done & approved. The rock surface rigid masonry
or concrete surface upon or against which concrete is to be placed shall
be concrete surface with reference to relevant specification starting
masonry over old masonry. Before starting the placing of concrete it should
be made certain that the transportation and placing equipment are
cleaned and in proper repair and the equipment along with operation staff
is arranged to deliver the concrete to the final position without any delay or
the objectionable segregation. If concrete is to be placed at night adequate
lighting arrangement as may be directed by the Engineer-in-Charge shall be
made. The method and equipment used for transporting and placing the
concrete of the required consistency in to the work without the
objectionable, porosity or the excessive loss of the workability. All
concrete shall be placed directly in its final position within 30 minutes after
being mixed. Any concrete, which has become so stiff that proper placing
cannot be assured without re-tempering shall he wasted. Excessive
segregation from what so ever cause shall he minimized in handling and
operation by avoiding or controlling the lateral movement of the concrete as
in dumping at an angle depositing continuously at one point and allowing the
concrete to How. Concrete shall not be dropped from height exceeding
meter and free fall should he kept to minimum. Al! surface of form and metal
work that have become in crushed with dried mortar or grout from concrete
previously placed shall be cleaned of all such mortar or grout before
surrounding or adjacent concrete is placed.
The bottom of the foundation and super-structure shall be trimmed and
levelled before concrete is placed. All loose and soft materials shall remove. The
foundation bed shall be thoroughly cleaned and then the concrete shall be
placed in position. Continuous, horizontal layers of maximum thickness of
cms. Each shall be placed and shall be compacted by wooden or iron rammers
Properly mixed concrete shall be placed in position within 30 minutes after the
water is added to the mixer. The concrete shall be laid gently, so as not permit
any segregation of aggregate. It shall than be compacted with tight wooden
template or vibrator till the slurry is formed at surface and compacted
thoroughly, so that no voids or cavity left and dense concrete is obtained,
over vibration shall .be avoided. Concrete shall be protected from direct heat
of sum, it shall be covered after few hours of initial of selling of cement, with
gunny bags or socking and shall be cured by watering for period of 14 days.
When concrete is to be resumed after lapse of time, the surface on which
further concrete is to be done shall be roughened and scrubbed with brush to
remove laitance and shall be swept clean thoroughly.
If the area to be concreted is to be dewatered before laying concrete the
contractor shall make arrangement for pumping out or bailing out stagnant or
[lowing water from foundation, so as to allow concrete operations to be done in
dry conditions without an^ trouble in almost all the stages till concrete has
finally set in position and nothing shall be paid for this dewatering and pumping
or bailing out water.
The concrete shall be thoroughly compacted by means of wooden or iron
rammers during placing till it causes the mortar to cream up and compacted
thoroughly so that no voids or cavities are in the concrete it is thoroughly dense
After removal of form work in due time, the concrete surface shall-be made free
from honey combing, air holes or any other defects shall be finished in line and
level with the cement.
The work, after its initial set shall be protected from excessive heat of sun or rain
etc. by covering wet gunny bags or by shallow pools of water as directed by the
Engineer in-charge.
Flooding with water by making mud walls 7.50 cm. high shall cure if or covering
with wet sand or earth and kept damp continuously for 14 days.
In case the contractor fails to make satisfactory arrangements for curing on any
day within curing period, department at the risk and cost of the contractor shall
he the same and this amount shall he recovered from the contractor from his
7.7 TEST FOR CEMENT CONCRETE;
(a) The compression test of concrete shall be on 6"(15 cm.) cubes whenever
applicable. Concrete for test cube shall be taken immediately, it has been
deposited on the work.
Whenever this is not possible, samples shall be taken as the concrete id being
placed, to obtain the representative sample. A sufficient number of samples each
enough to make one test cube shall be taken at different points, so that the test
cube made from them will be representative of the concrete placed in that
position of that structures selected for test. One set of test cube per every 50 cum
of the concrete deposited shall be taken. The set of six cubes shall be tested for
compressive strength at 7 days and 28 days.
(b) After proper curing of prescribed period this shall be tested as per I. S. I. and
should give compressive strength of not less than,
a.70 kg/sq. cm. for 7 days and 100 kg/sq.cm. for 28 days for a nominal mix of
b.100 kg/sq.cm. for 7 days and 150 kg/sq.cm. for 28 days for a nominal mix of
c.140kg/sq.cm.for 7 days and 200kg/sq.cm. for 28 days for a nominal mix of
(c) The exact proportion in which the different ingredients are to be used for
pans of the work, shall be determined by the Engineer from time to time, during,
the progress of the work and as analysed and the test are made of samples of
aggregates and resulting concrete. No extra payment or deduction shall be made
in the unit rate for variation in gradation and proportion of coarse and
fineaggregate for maintaining gradation as suggested by the Engineer for
achieving required strength of concrete.
(d) Slight variation in the nominal mix shall be made, it makes the
concrete more, dense in order to make the concrete impervious.
(e) At least 80% of the cubes tested shall give the minimum specified strength. No
cubes shall however, give a strength less than 80 % of the specified,
strength, if the lest shows that the concrete blocks result below the
specified strength, such bad quality of concrete shall be removed and
redone by contractor al his own cost.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Annexure _FP GS_Galkund-_Purak DPR_WDC 2.O_2025-26.pdf
SOGAND NAMU.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .