Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.2 LAccepted-AOC | l1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | BIJI K THOMAS L1 |
|---|---|---|---|---|
| 1.00Earth work | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 246 | sqm | 18 ₹4,428 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 32.39 | cum | 252 ₹8,162.28 Lowest |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.44 | cum | 8,568 ₹2,60,835.62 Lowest |
| 1.00 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 405.9 | sqm | 342 ₹1,38,817.8 Lowest |
| 1.00 | 5.26:Providing and filling in position, blow bitumen in expansion joints. | 0.13 | cum | 80,100 ₹10,413 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,591
Closing Date
21 Oct 2025, 5:00 pmClosed
Assistant Executive Engineer
KIP Sub Division No 1 Adoor
GENERAL Urgent rectification Urgent rectification work of Cherukunnam distributary between ch 2808 m to 3017 m General Civil Work
2025_Irrig_801991_2
IRR/PII/TR/2509/2023_5_2_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
cherukunnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,591
Yes
7 Jan 2026
9 Oct 2025
23 Oct 2025
9 Oct 2025
21 Oct 2025
9 Oct 2025
Amount
Earth work
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.26:Providing and filling in position, blow bitumen in expansion joints.
Bidder Name
BIJI K THOMAS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1345690.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1345690.xls
BOQ • 0.30 MB
viewsbd.pdf
Other Document • 2.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .