| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | -20.96% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 CrAdmitted-Finance | -16.77% | ₹2.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.1 CrAdmitted-Finance | -16.59% | ₹2.1 Cr | L3 | Admitted-Finance |
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
20 Apr 2026, 6:00 pmClosed
EE RSAMB Div Kota
EE RSAMB Div Kota
Construction of Govt. Level EWS Girls Hostel (50 Bedded) at Tonk, Distt Tonk
2026_RSAMB_551496_1
NIT NO 01/2026-27 EE RSAMB DIV KOTA
Open Tender
Civil Works
365 days
TONK
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
RTGS/NEFT/Any other money Transfer System
₹5.1 L
Yes
7 May 2026
13 Apr 2026
21 Apr 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | - | P.cum | - | - | BI01010001010000000000000515BI0100001165 |
Add extra for foundation/trenches/drains for every additional lift of 1.5 Mtr. or part thereof in, All kinds of soil | - | P.cum | - | - | BI01010001010000000000000515BI0100001166 | |
Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | - | Cum | - | - | BI01010001010000000000000515BI0100001167 | |
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | - | P.cum | - | - | BI01010001010000000000000515BI0100001168 | |
Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | - | P.cum | - | - | BI01010001010000000000000515BI0100001169 | |
Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix | - | P.cum | - | - | BI01010001010000000000000515BI0100001170 | |
Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.M20 grade Nominal Mix / Design Mix | - | P.cum | - | - | BI01010001010000000000000515BI0100001171 | |
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | - | P.sqm | - | - | BI01010001010000000000000515BI0100001172 | |
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | - | P.sqm | - | - | BI01010001010000000000000515BI0100001173 | |
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. | - | P.sqm | - | - | BI01010001010000000000000515BI0100001174 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.33 MB
Tendernotice_2.pdf
PDF • 0.14 MB
Tendernotice_3.pdf
PDF • 0.87 MB
2_technicalBid.pdf
Tender Documents • 0.87 MB
02_Agreement.pdf
Tender Documents • 0.86 MB
BOQ_982935.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid