| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.4 L+₹22,292.57 (3.62%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.1 L+₹93,708.61 (15.2%)Rejected-Finance NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L3 | Rejected-Finance L3 Reject | |
| 4 | L4₹7.3 L+₹1.1 L (18.5%)Rejected-Finance | L4 | Rejected-Finance L4 Reject | |
| 5 | L5₹7.4 L+₹1.2 L (19.9%)Rejected-Finance KAVIKKUNNEL H KUNNACKAL P O MUVATTUPUZHA | MUVATTUPUZHA | KERALA | L5 | Rejected-Finance L5 Reject |
Tender Value
Refer Docs
EMD Value
₹20,100
Closing Date
16 Feb 2021, 6:00 pmClosed
Assistant Executive Engineer,
Assistant Executive Engineer, Additional Irrigation Sub Division, Aluva
Deepening of canal
2021_Irrig_413288_1
AEE/AISD/ALV/15/ET/2020-21/S Tender
Open Tender
Civil Works - Others
Item Rate
120 days
Elamkunnappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,360
Yes
₹20,100
Yes
6 Jul 2021
9 Feb 2021
19 Feb 2021
9 Feb 2021
16 Feb 2021
9 Feb 2021
9 Feb 2021 - 11 Feb 2021
Amount
Scheme 1 (Ch.110m-120m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 2 (Ch.120m-130m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 3(Ch.130m-140m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 4 (Ch.140m-150m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 5 (Ch.150m-163m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 6 (Ch.163m-176m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 7 (Ch.176m-189m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 8 (Ch.189m-202m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 9 (Ch.202m-215m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 10 (Ch.215m-228m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 11 (Ch.228m-241m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 12 (Ch.241m-250m)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
T A JOSEPH
DAISY JOSE
ANEESH.C.S
George Kutty
SANYO XAVIER
MIDHILAJ KHAN V H
ROY MON K E
MAS CONSTRUCTIONS
YEM PEES CONTRACTING
AFKAR ENTERPRISES
Poulose A. Arickal
Bidder Name
DAISY JOSE
Poulose A. Arickal
T A JOSEPH
George Kutty
ANEESH.C.S
MAS CONSTRUCTIONS
YEM PEES CONTRACTING
SANYO XAVIER
ROY MON K E
AFKAR ENTERPRISES
Padamadan Constructions
MIDHILAJ KHAN V H
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587178.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .