Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L | L1 | Accepted-AOC Lowest Contractor |
| 2 | L2₹6.5 L+₹61,947.60 (10.6%)Rejected-AOC | ₹6.5 L+₹61,947.60 (10.6%) | L2 | Rejected-AOC L2 Second lowest contractor |
| 3 | L3₹6.7 L+₹80,423.01 (13.8%)Rejected-Finance | ₹6.7 L+₹80,423.01 (13.8%) | L3 | Rejected-Finance Third Lowest Bidder |
| 4 | L4₹7.2 L+₹1.4 L (23.2%)Rejected-Finance | ₹7.2 L+₹1.4 L (23.2%) | L4 | Rejected-Finance fourth Lowest Bidder |
| 5 | L5₹7.4 L+₹1.5 L (26.0%)Rejected-Finance | ₹7.4 L+₹1.5 L (26.0%) | L5 | Rejected-Finance fifth Lowest Bidder |
| Sl No | Description | Qty | Unit | Ajikumar G L6 | KURIAKOSE ABRAHAM L4 | Rinju P James L5 | SALIM.H L1 | NIYASMON P A L3 | Jithin V L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix-A- Pre-monsoon works | |||||||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 10 | cum | 2,303 ₹23,030 | 2,175 ₹21,750 | 2,115 ₹21,150 | 1,765.51 ₹17,655.1 Lowest | 2,008.6 ₹20,086 | 2,000 ₹20,000 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 10 | cum | 5,070.65 ₹50,706.5 | 4,780 ₹47,800 | 4,325 ₹43,250 | 3,887 ₹38,870 Lowest | 4,422.24 ₹44,222.4 | 4,138 ₹41,380 |
| 1.00 | OD31922/2026-2027:Engaging man mazdoor for clearing chocked culvert, clearing vegetation, removing the RCC slab and cleaning drain etc. | 55 | Day | 1,014.73 ₹55,810.15 | 960 ₹52,800 | 970 ₹53,350 | 777.87 ₹42,782.85 Lowest | 884.98 ₹48,673.9 | 900 ₹49,500 |
| 1.00 | OD31924/2026-2027:Engaging JCB for removal of wastage, eviction purpose etc. | 72 | hour | 1,258.59 ₹90,618.48 | 1,200 ₹86,400 | 1,160 ₹83,520 | 964.81 ₹69,466.32 Lowest | 1,097.65 ₹79,030.8 | 1,050 ₹75,600 |
| 1.00 | OD31928/2026-2027:Engaging tipper for conveying wastag | 9 | Day | 5,899.63 ₹53,096.67 | 5,600 ₹50,400 | 5,800 ₹52,200 | 4,522.54 ₹40,702.86 | 5,145.22 ₹46,306.98 | 3,500 ₹31,500 Lowest |
| 1.01 | OD31920/2026-2027:Engaging wood cutter for cutting trees and branches standing in dangerous condition | 2 | no | 1,123.28 ₹2,246.56 | 1,060 ₹2,120 | 1,100 ₹2,200 | 861.09 ₹1,722.18 Lowest | 979.65 ₹1,959.3 | 1,500 ₹3,000 |
| 1.01 | OD31929/2026-2027:Hire charge for machine saw including petrol charge | 2 | Day | 1,851.5 ₹3,703 | 1,750 ₹3,500 | 1,815 ₹3,630 | 1,419.33 ₹2,838.66 | 1,614.74 ₹3,229.48 | 750 ₹1,500 Lowest |
| 1.01 | OD31930/2026-2027:Engaging Man mazdoor for assisting wood cutter and removing branches of trees, Cutting in shape for keeping road side with out hindrance to the traffic as per the direction of deptl. officers at site. | 2 | no | 1,014.73 ₹2,029.46 | 960 ₹1,920 | 970 ₹1,940 | 777.87 ₹1,555.74 Lowest | 884.98 ₹1,769.96 | 950 ₹1,900 |
| 1.01 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 5 | Hectare | 45,456.45 ₹2,27,282.25 | 42,925 ₹2,14,625 | 44,450 ₹2,22,250 | 34,864.07 ₹1,74,320.35 Lowest | 39,643.72 ₹1,98,218.6 | 38,885 ₹1,94,425 |
Tender Value
₹8.5 L
EMD Value
₹21,186
Closing Date
30 Jun 2026, 3:00 pmClosed
O/o Office of the Assistant Executive Engineer,
O/o Office of the Assistant Executive Engineer, Roads Sub Division Ranni
GENERAL-Pre Monsoon work 2026-27 in various roads under Roads section Laha-workGeneral Civil Work
2026_PWD_857122_1
PWD/RB/TR/8112/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
Ranny
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,870
Yes
₹21,186
Yes
29 Jul 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-A- Pre-monsoon works | |||||
| 1.001 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | - | cum | - | - |
| 1.002 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | - | cum | - | - |
| 1.003 | OD31922/2026-2027:Engaging man mazdoor for clearing chocked culvert, clearing vegetation, removing the RCC slab and cleaning drain etc. | - | Day | - | - |
| 1.004 | OD31924/2026-2027:Engaging JCB for removal of wastage, eviction purpose etc. | - | hour | - | - |
| 1.005 | OD31928/2026-2027:Engaging tipper for conveying wastag | - | Day | - | - |
| 1.006 | OD31920/2026-2027:Engaging wood cutter for cutting trees and branches standing in dangerous condition | - | no | - | - |
| 1.007 | OD31929/2026-2027:Hire charge for machine saw including petrol charge | - | Day | - | - |
| 1.008 | OD31930/2026-2027:Engaging Man mazdoor for assisting wood cutter and removing branches of trees, Cutting in shape for keeping road side with out hindrance to the traffic as per the direction of deptl. officers at site. | - | no | - | - |
| 1.009 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hectare | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1448815.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1448815.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .