Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC BHAWALI NAINITAL | L1 | Accepted-AOC Awarded | |
| 2 | L2₹10.7 L+₹23,398.34 (2.24%)Rejected-AOC BHAWALI NAINITAL | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.1 L+₹65,046 (6.23%)Rejected-AOC DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | dan singh negi L2 | MAA JAGDAMBA TRADERS L3 | GOPAL DUTT NAINWAL L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of LT Clamp for Sp-21 with N&B | 120 | Nos | 226 ₹27,120 | 235 ₹28,200 | 219 ₹26,280 Lowest |
| 2.00 | Supply of Stay Clamp for Sp-21 with N&B | 20 | Nos | 256 ₹5,120 | 255 ₹5,100 | 246 ₹4,920 Lowest |
| 3.00 | Supply of LT Clamp for Sp-10 with N&B | 380 | Nos | 205 ₹77,900 | 205 ₹77,900 | 199 ₹75,620 Lowest |
| 4.00 | Supply of Shackle Insulator 100x115 mm With N&B | 500 | Nos | 110 ₹55,000 | 115 ₹57,500 | 99 ₹49,500 Lowest |
| 5.00 | Supply of Stay Clamp for Sp-10 with N&B | 80 | Nos | 236 ₹18,880 | 239 ₹19,120 | 229 ₹18,320 Lowest |
| 6.00 | Supply of Stay Insulator 100x115 | 100 | Nos | 35 ₹3,500 | 40 ₹4,000 | 34 ₹3,400 Lowest |
| 7.00 | Laying of AB Cable 1x16+25 mm | 1 | CKM | 154 ₹154 Lowest | 155 ₹155 | 14,500 ₹14,500 |
| 8.00 | Excavation of pit for Pole | 145.35 | CBM | 256 ₹37,209.6 | 271 ₹39,389.85 | 249 ₹36,192.15 Lowest |
| 9.00 | Excavation of pit for Stay Set | 43.2 | CBM | 256 ₹11,059.2 | 256 ₹11,059.2 | 249 ₹10,756.8 Lowest |
| 10.00 | Grouting of Pole | 36.34 | CBM | 4,933 ₹1,79,265.22 | 5,100 ₹1,85,334 | 4,799 ₹1,74,395.66 Lowest |
Tender Value
₹10.5 L
EMD Value
₹42,000
Closing Date
27 Feb 2025, 3:00 pmClosed
EE, EDD Almora
EDD Almora, Laxmeshwar, Almora 263601
Supply and Errection of Mid Span Pole in LT Line at Village Sangroli and Pipli in Lamgara Section
2025_UPCL9_79838_1
57/2024-25/EDD(A)
Open Tender
Electrical Works
Item Wise
365 days
Lamgara
As per tender document
2 documents required · 2 mandatory
₹1,180
EE, EDD Almora
₹42,000
4 Sept 2025
2 Feb 2025
28 Feb 2025
3 Feb 2025
27 Feb 2025
10 Feb 2025
Amount
Supply of LT Clamp for Sp-21 with N&B
Supply of Stay Clamp for Sp-21 with N&B
Supply of LT Clamp for Sp-10 with N&B
Supply of Shackle Insulator 100x115 mm With N&B
Supply of Stay Clamp for Sp-10 with N&B
Supply of Stay Insulator 100x115
Laying of AB Cable 1x16+25 mm
Excavation of pit for Pole
Excavation of pit for Stay Set
Grouting of Pole
Grouting of Stay Set
Erection of Single SP-10 Pole
Erection of LT Stay Set
Erection of Single SP-21 Pole
Cartage of Petty Material, 71-100 KM
Headload Cartage SP-10 Pole (1-3 Km)
Headload Cartage SP-21/23 Pole (1-3 Km)
Muffing of Pole
Laying of 1P 2W LT Line (Weasel)
Cartage SP-21/23 Pole, 71-100 KM
Cartage of SP-10 Pole, 71-100 KM
Headload Cartage of Material (1-3)
dan singh negi (BID ID -363006)
MAA JAGDAMBA TRADERS (BID ID -363078)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .