Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹41.5 L
EMD Value
₹42,000
Closing Date
26 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Officer, Lathi Nagarpalika, Lathi
Construction Work of Asphalt Road as per Various Location Chart At. Lathi Under 15th Finance Commission Grant Year-2025-26
355927
97/2026
Open
Civil Works - Roads
Works
Amreli
12 documents required · 11 mandatory · 1 optional
₹1,500
Chief Officer, Lathi Nagarpalika, Lathi
₹42,000
16 Oct 2026
16 Oct 2026
16 Oct 2026
26 Oct 2026
16 Oct 2026
NAME OF WORK : CONSTRUCTION WORK OF ASPHALT ROAD, AS PER VARIOUS LOCATION CHART AT,
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
PERCENTAGE RATE TENDER
Sr.No. Schedule Amount
1 Schedule - "B"- 1
2 Schedule - "B"- 2
Total Amount Rs.
Total Amount Rs.
I/We am/are willing to carry out the work @ ________% Above / Below_______Percentage (should be writen in
figures and words) of the Estimated rates mentioned above amount of my / our Tender works out as under.
Estimated Amount Estimated Amount
Put to Tender Rs. 41,53,643=00 Put to Tender Rs. 41,53,643=00
Add ..............% Rs. Deduct %Rs.
Total Rs. Total Rs.
(In Words (In Words
Signature of the Contractor
Consl. Engineer Engineer
"DESIGN POINT" Lathi Nagarpalika
Chief Officer President
Lathi Nagarpalika Lathi Nagarpalika
LATHI NAGARPALIKA - LATHI
SCHEME : 15TH FINANCE COMMISSION GRANT YEAR-2025-26
NAME OF WORK: CONSTRUCTION WORK OF ASPHALT ROAD
LOCATION CHART FOR SCHEDULE- B-1
Sr. No. Location No. Length Width Sqmt.
Various Street Of, Lathi.
1 Chavnd Gate To Gagdiya Water Works 1 150.00 8.00
2 Near Vijay Hanuman Bridge 20 % Qty 1 150.00 7.00
3 Snanghat To Gomati Ma 1 83.00 6.00
Stamp with Signature of Contractor
Consl.Engineer Engineer
"DESIGN POINT" Lathi Nagarpalika
Chief Officer President
Lathi Nagarpalika Lathi Nagarpalika
LATHI NAGARPALIKA - LATHI
SCHEME :- 15TH FINANCE COMMISSION GRANT YEAR-2025-26
NAME OF WORK :- CONSTRUCTION WORK OF ASPHALT ROAD
LOCATION : Various Street of Lathi, At. Lathi.
SCHEDULE - "B-1"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Scarifying gravelled macadam or bitumen macadam surface 6 cm
to 10 cm.depth including stacking useful materials on road side
and disposing off remaining stuff. 1908.00 41.60 Sqmt
Demolition and disposal of unserviceable materials with all lead
and lift.(i) Lime concrete. 7.50 623.01 Cumt
Crushed stone aggregate for machine cut hard quality (I) 40mm to
63mm size all lead and lift 60.70 609.03 Cumt
Supplying of Stone Dust all lead and lift 4.90 308.05 Cumt
Spreading the stone aggregate for rolling and W.B.M. including
filling the interstices to required camber and gradient (excluding
spreading of Blindage) (ii) 40mm to 63mm size aggreagates 60.70 262.23 Cumt
Spreading blindage or road crust filling the gaps in metal and
leveling to camber and gradient as directed.. 4.90 154.84 Cumt
Providing & Laying 37.50mm thick B.M. stone aggregates at the
rate 0.66 Cumt/MT. as per M.O.S.T. gradation and asphalt 60/70
(VG30) for tack coat at the rate of 2.50 kg. per 10 Sqmt. Road
surface by mechanical sprayer and for mixing aggregates with
asphalt 60/70 (VG30) at the rate of 3.4% i.e. 34kg/MT. of total mix
including heating & mixing in drum mix plant, spreading the same
by paver finisher and consolidation with vibrator roller including the
cost of fuel, hire charges, wood, kerosene, labour charges etc. by
using contraxtor's own machineries and plant etc. comp.
Providing & laying 25 mm thick Semi Dense Bitumeneous Carpet
with B.T. aggregates as per MORTH specification & VG-30 Grade
asphalt for mixing at a rate of 50.00 Kg / M.T total weight of
bitumean including heating the aggregates & asphalt in contineous
batching hot mix plant & spreading the same by sensor paver
finisher & consolidation with vibratory road roller incl, providing all
material equipment tools & plants fire wood, kerosine labour
charges etc, comp. using contractor's own machinaries, etc, comp.
Providing and applying primer coat with bitumen emulsion (SS) on
prepared surface of granular Base including clearing of road
surface and spreying primer at the rate of 0.75 kg/sqmt using
mechanical means. (MoRTH- standard databook Item no. 5.1) 1908.00 70.92 Sqmt
Tracing of old Manhole all type 13.00 1202.00 No.
RCC precast M.H. Frame & Cover Manufacture, supply & Delivery
at store or at site of work precast RCC M.200 Frame & cover
suitable to drainage M.H. and as per type design & Drawing
including cost of reinforcement M.S. Angles or Flat, curing mold
work etc. Heavy Duty Frame Suitable for 50cm opening of MH
Cover Suitable for 50cm opening of MH 7.00 1173.00 No.
Total Amounts Rs...……
Total Amounts Rs...……
Stamp with Signature of Contractor
Consl. Engineer Engineer
"DESIGN POINT" Lathi Nagarpalika
Chief Officer President
Lathi Nagarpalika Lathi Nagarpalika
LATHI NAGARPALIKA - LATHI
SCHEME : 15TH FINANCE COMMISSION GRANT YEAR-2025-26
NAME OF WORK: CONSTRUCTION WORK OF ASPHALT ROAD
LOCATION CHART FOR SCHEDULE- B-2
Sr. No. Location No. Length Width Sqmt.
Various Street Of, Lathi.
1 Chavnd Gate To Gagdiya Water Works 1 200.00 8.00
2 Bhavani Chowk To Gagdiya Water Works 1 50.00 20.00
3 Near Vijay Hanuman Bridge 20 % Qty 1 200.00 7.00
4 Snanghat To Gomati Ma 1 367.00 6.00
Stamp with Signature of Contractor
Consl.Engineer Engineer
"DESIGN POINT" Lathi Nagarpalika
Chief Officer President
Lathi Nagarpalika Lathi Nagarpalika
LATHI NAGARPALIKA - LATHI
SCHEME :- 15TH FINANCE COMMISSION GRANT YEAR-2025-26
NAME OF WORK :- CONSTRUCTION WORK OF ASPHALT ROAD
LOCATION : Various Street of Lathi, At. Lathi.
SCHEDULE - "B-2"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Scarifying gravelled macadam or bitumen macadam surface 6 cm to
cm.depth including stacking useful materials on road side and disposing
off remaining stuff. 5082.00 41.60 Sqmt
Demolition and disposal of unserviceable materials with all lead and lift.(i)
Lime concrete. 33.10 623.01 Cumt
Box cutting the road surface to proper slope and camber for making a
base for road work including removing the excavated stuff and depositing
on the road side slope as directed upto all lead and sretta 150.00 109.41 Cumt
Crushed stone aggregate for machine cut hard quality (I) 40mm to
63mm size all lead and lift 256.60 609.03 Cumt
Supplying of Stone Dust all lead and lift 20.50 308.05 Cumt
Spreading the stone aggregate for rolling and W.B.M. including filling the
interstices to required camber and gradient (excluding spreading of
Blindage) (ii) 40mm to 63mm size aggreagates 256.60 262.23 Cumt
Spreading blindage or road crust filling the gaps in metal and leveling to
camber and gradient as directed.. 20.50 154.84 Cumt
Providing & Laying 37.50mm thick B.M. stone aggregates at the rate
Cumt/MT. as per M.O.S.T. gradation and asphalt 60/70 (VG30) for tack
coat at the rate of 2.50 kg. per 10 Sqmt. Road surface by mechanical
sprayer and for mixing aggregates with asphalt 60/70 (VG30) at the rate
of 3.4% i.e. 34kg/MT. of total mix including heating & mixing in drum mix
plant, spreading the same by paver finisher and consolidation with
vibrator roller including the cost of fuel, hire charges, wood, kerosene,
labour charges etc. by using contraxtor's own machineries and plant etc.
Providing & laying 25 mm thick Semi Dense Bitumeneous Carpet with
B.T. aggregates as per MORTH specification & VG-30 Grade asphalt for
mixing at a rate of 50.00 Kg / M.T total weight of bitumean including
heating the aggregates & asphalt in contineous batching hot mix plant &
spreading the same by sensor paver finisher & consolidation with
vibratory road roller incl, providing all material equipment tools & plants
fire wood, kerosine labour charges etc, comp. using contractor's own
machinaries, etc, comp. 292.30 5687.31 M.T.
Providing and applying primer coat with bitumen emulsion (SS) on
prepared surface of granular Base including clearing of road surface and
spreying primer at the rate of 0.75 kg/sqmt using mechanical means.
(MoRTH- standard databook Item no. 5.1) 5082.00 70.92 Sqmt
Tracing of old Manhole all type 27.00 1202.00 No.
RCC precast M.H. Frame & Cover Manufacture, supply & Delivery at
store or at site of work precast RCC M.200 Frame & cover suitable to
drainage M.H. and as per type design & Drawing including cost of
reinforcement M.S. Angles or Flat, curing mold work etc. Heavy Duty
Frame Suitable for 50cm opening of MH 14.00 1121.00 No.
Cover Suitable for 50cm opening of MH 14.00 1173.00 No.
Total Amounts Rs...……
Total Amounts Rs...……
Stamp with Signature of Contractor
Consl. Engineer Engineer
"DESIGN POINT" Lathi Nagarpalika
Chief Officer President
Lathi Nagarpalika Lathi Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Tender.pdf
02 Form B-1.pdf
03 Schedule B.pdf
04 DRG And Section.pdf
05 Terms and Conditions.pdf
06 Specifications of Road Work.pdf
07 Vendor Civil work.pdf
08 Test Require for Construction Material.pdf
09.1 DMO_2876_01-May-2025_273.pdf
09.1GR All.pdf
10 GR Affidavit GR_240217_161336.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .