| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹1.4 Cr | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹1.4 CrRejected-Finance GORAKHPUR | UTTAR PRADESH | 273413 | ₹1.4 Cr | 2 | Rejected-Finance 2ND LOWEST |
| 3 | Rejected-Technical 99 SUSHILA BIHAR BHUD BULANDSHAHAR | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 4 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S Singh Construction L1 | M/S SRI RAJ BAHADUR SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | M-150 brick work in Toe wall/X- sleeper in 1:4 cement coarse sand mortar including of all labour,Material and T&P etc. required for proper completion of work | 124.68 | m³ | 6,900 ₹8.6 L | 6,791.13 ₹8.5 L |
| 2.00 | Earth work in filling ruts & cuts for making sub grade for lining including lead up to 30m. & lift up to 1.50m. Including labour, T&P and dressing to profiles etc. required for proper completion of work | 1,539.78 | m³ | 160 ₹2.5 L | 162.12 ₹2.5 L |
| 3.00 | 10 mm Thick Cement plaster 1:4 C.M with hamirpur coarse sand including cost of all Material, Labour and T&P etc. with proper completion of work. | 92.45 | m² | 260 ₹24,037 | 263.78 ₹24,386.46 |
| 4.00 | Laying of Tiles for Pressure Release Arrangement on slope filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 35 | Nos. | 3,500 ₹1.2 L | 3,487.65 ₹1.2 L |
| 5.00 | Laying & Fixing Vertical Pressure Release Valve filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 55 | Nos. | 4,900 ₹2.7 L | 4,898.53 ₹2.7 L |
| 6.00 | Slope lining in two layer 1st layer laying with 1st class brick work in 1:4 cement mortar laid over 10mm thick cement mortar and 15 mm thick S.W.P in 1:3 cement mortar and 2nd layer laying with C.C. Tiles in 1:4 cement mortar laid over 5 mm thick cement mortar in 1:4 including Cost of material,Labour and T&P required for proper completion of work | 6,159.13 | m² | 1,922 ₹1.2 Cr | 1,958.22 ₹1.2 Cr |
| 7.00 | Slope lining in single layer laying with C.C. Tiles laid over 15 mm thick S.W.P in 1:3 cement mortar and laid over 5 mm thick cement mortar in 1:4 over 1st class brick work.including Cost of Material,labour and T&P required for proper completion of work. | 607.88 | m² | 1,190 ₹7.2 L | 1,285.09 ₹7.8 L |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
13 Oct 2025, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT02
2025_UPIDC_1080571_2
07/SE-XII/2025-26
Open Tender
Civil Works
240 days
LAKHIMPUR KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,470
₹3.0 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
9 Apr 2026
7 Oct 2025
13 Oct 2025
7 Oct 2025
13 Oct 2025
7 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
techsummary_1977253.pdf
BOQ Comparative Chart
xlsx
finsummary_1977253.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
TD2.pdf
Tender Documents • 2.22 MB
BOQ_1977253.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid