Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.7 LAdmitted-Finance | -21.80% | ₹11.7 L | L1 | Admitted-Finance |
| 2 | L2₹12.0 L+₹28,530.27 (2.43%)Admitted-Finance | -19.90% | ₹12.0 L+₹28,530.27 (2.43%) | L2 | Admitted-Finance |
| 3 | L3₹14.3 L+₹2.5 L (21.5%)Admitted-Finance | -5.00% | ₹14.3 L+₹2.5 L (21.5%) | L3 | Admitted-Finance |
| 4 | L4₹14.9 L+₹3.1 L (26.6%)Admitted-Finance | -1.00% | ₹14.9 L+₹3.1 L (26.6%) | L4 | Admitted-Finance |
| 5 | L5₹15.0 L+₹3.3 L (27.9%)Admitted-Finance | +0.00% | ₹15.0 L+₹3.3 L (27.9%) | L5 | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
25 Aug 2026, 6:00 pmClosed
xen
kalakote
Construction of lane drain/paths in different wards of MC kalakote at Draman to Manda MOhalla Ward No. 05 Kalakote
2026_PWDJK_320725_4
eNIT No 47 of 2026/27 dated 12/08/2026
Open Tender
Civil Works
Percentage
60 days
kalakote
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
xen
₹30,000
27 Aug 2026
12 Aug 2026
26 Aug 2026
12 Aug 2026
25 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :AKS 60% OR 20% HR 20% | 200 | Cum | 256.85 | ₹51,370 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3 | Cum | 4,826.5 | ₹14,479.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 175 | Cum | 5,733.6 | ₹10,03,380 |
| 4 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm | 80 | Cum | 1,204.15 | ₹96,332 |
| 5 | Supplying and stacking of good earth at site including royalty (earth
measured in stacks will be reduced by 20% for payment) | 7 | cum | 281.3 | ₹1,969.1 |
| 6 | Supplying and stacking at site Graded crushed stone aggregate of size 13.2 mm | 14 | Cum | 1,204.15 | ₹16,858.1 |
| 7 | Laying, spreading and compacting stone aggregate of specified sizes to
WBM specifications in uniform thickness, hand picking, rolling with 3
wheeled road / vibratory roller 8-10 tonne capacity in stages to proper
grade and camber, applying and brooming requisite type of screening
/binding material to fill up interstices of coarse aggregate, watering and
compacting to the required density. | 80 | Cum | 768.15 | ₹61,452 |
| 8Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 8.1 | Foundations, footings, bases of columns etc. for mass concrete | 240 | Sqm | 286.35 | ₹68,724 |
| 9Carriage of material by mechanical transport from source to the site of work including loading/unloading and stakcing complete. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1067361.xls
BOQ • 1.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .