| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.7 LAccepted-AOC | ₹51.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹51.8 L+₹2,982.93 (0.06%)Rejected-Finance | ₹51.8 L+₹2,982.93 (0.06%) | L2 | Rejected-Finance L2 |
| 3 | L3₹52.0 L+₹26,581.24 (0.51%)Rejected-Finance | ₹52.0 L+₹26,581.24 (0.51%) | L3 | Rejected-Finance L3 |
| 4 | L4₹53.3 L+₹1.6 L (3.10%)Rejected-Finance | ₹53.3 L+₹1.6 L (3.10%) | L4 | Rejected-Finance L4 |
| 5 | L5₹55.9 L+₹4.2 L (8.10%)Rejected-Finance | ₹55.9 L+₹4.2 L (8.10%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M.A IQBAL L7 | B.M ABDUL RAHIMAN L3 | MOHAMMED SIYAB T M L6 | ANANDAN T L1 | AHMAD FAROOK K L2 | MADHU PONNAN L5 | MOHAMMED SABIR E K L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00BUILDING | ||||||||||
| 1.00 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 95.3 | cum | 11,646.33 ₹11,09,848.66 | 10,021.39 ₹9,54,998.38 | 11,439.64 ₹10,90,151.93 | 9,562.37 ₹9,11,255.61 Lowest | 9,975.79 ₹9,50,652.88 | 10,800 ₹10,29,196.8 | 10,279.75 ₹9,79,619.06 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 205.18 | sqm | 908.84 ₹1,86,472.16 | 782.03 ₹1,60,453.79 | 892.71 ₹1,83,162.67 | 778.09 ₹1,59,645.39 Lowest | 778.47 ₹1,59,723.36 | 840 ₹1,72,347.84 | 802.19 ₹1,64,590.14 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 240.92 | sqm | 687.47 ₹1,65,625.27 | 591.55 ₹1,42,516.23 | 675.27 ₹1,62,686.05 | 588.57 ₹1,41,798.28 Lowest | 588.86 ₹1,41,868.15 | 635 ₹1,52,984.2 | 606.8 ₹1,46,190.26 |
| 1.00 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 106.56 | sqm | 920.91 ₹98,132.17 | 792.42 ₹84,440.28 | 904.56 ₹96,389.91 | 788.43 ₹84,015.1 Lowest | 788.81 ₹84,055.59 | 855 ₹91,108.8 | 812.85 ₹86,617.3 |
| 1.00 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 20.22 | sqm | 743.26 ₹15,028.72 | 639.56 ₹12,931.9 | 730.07 ₹14,762.02 | 636.34 ₹12,866.79 Lowest | 636.65 ₹12,873.06 | 690 ₹13,951.8 | 656.05 ₹13,265.33 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 331.45 | sqm | 866.21 ₹2,87,105.3 | 745.35 ₹2,47,046.26 | 850.84 ₹2,82,010.92 | 741.6 ₹2,45,803.32 Lowest | 741.96 ₹2,45,922.64 | 800 ₹2,65,160 | 764.57 ₹2,53,416.73 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 68 | metre | 205.57 ₹13,978.76 | 176.89 ₹12,028.52 | 201.93 ₹13,731.24 | 176 ₹11,968 Lowest | 176.09 ₹11,974.12 | 190 ₹12,920 | 181.45 ₹12,338.6 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 9,891.87 | kilogram | 101.31 ₹10,02,145.75 | 87.17 ₹8,62,274.66 | 99.51 ₹9,84,340.38 | 86.11 ₹8,51,789.27 Lowest | 86.78 ₹8,58,416.83 | 92 ₹9,10,052.41 | 89.42 ₹8,84,531.37 |
| 1.01 | OD335705/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 87.04 | cum | 6,309.47 ₹5,49,182.58 | 5,429.15 ₹4,72,558.65 | 6,197.49 ₹5,39,435.73 | 5,412.66 ₹4,71,123.34 | 5,404.44 ₹4,70,407.86 Lowest | 5,860 ₹5,10,060.26 | 5,569.11 ₹4,84,740.9 |
Tender Value
₹63.1 L
EMD Value
₹50,000
Closing Date
22 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
Office of the Executive Engineer LID AND EW DIVISION, KASARAGOD P.O. VIDYANAGAR
Construction of Lab Building
2026_LSGD_855192_1
20/2026-27
Open Tender
Civil Works - Buildings
Item Wise
365 days
KODOM BELOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
19 Aug 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
22 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING | |||||
| 1.001 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 0.4 | cum | - | - |
| 1.002 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.4 | sqm | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.004 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | - | sqm | - | - |
| 1.005 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 1 | sqm | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.6 | kilogram | - | - |
| 1.009 | OD335705/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 0.4 | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1454391.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd20.pdf
Tender Documents • 3.03 MB
BOQ_1454391.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .