Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.4 L
EMD Value
₹14,740
Closing Date
25 Nov 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer IFCD Bla
Executive Engineer IFCD Bla
Restoration of Binner nallah by way of constt. Of protection wall on Binner nallah at Ghazdaji near L/o Gh. Nabi Sheikh and others On L/S.
2022_IFC_196369_1
eNIT.No.20.IFCD.Bla.of.2022.23
Open Tender
Civil Works
Item Rate
15 days
Baramulla
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Executive Engineer IFCD Bla
₹14,740
Yes
26 Nov 2022
17 Nov 2022
26 Nov 2022
17 Nov 2022
25 Nov 2022
17 Nov 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge 2.8.1 All kinds of soil :
Providing & laying dry stone soling (Quarry).
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
12 mm thick cement plaster of mix 1:4(1: cement 4: fine sand).
Cantering and shuttering including strutting, propping removal of form work for:-
walls (any thickness) including attached pilasters buttresses, plinth and string course etc
Filling available excavated earth(excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
Carriage of materials from source to road site of Work by Mechanical Transport.
Stone Avg. lead 08 Km
Stone Agg. 20 mm lead 08 Km
Sand Avg. lead 08 Km
Cement Avg. lead 05 Km
Carriage of materials by manual means from dumping site to actual site by head load Avg. lead 300 Mtrs
Stone
Stone Agg. 20 mm
Cement
M/S SHOWKAT AHMAD SOFI
HILAL AHMAD LONE
M/s LATEEF AHMAD CHANNA
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .