Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹69,621.02Accepted-AOC | ₹69,621.02 | 1 | Accepted-AOC AGREEMENT EXECUTED |
| Sl No | Description | Qty | Unit | RAHUL CR L1 |
|---|---|---|---|---|
| 1.00Wooden Sluice and Temporary Bund | ||||
| 1.00 | OD427057/2025-2026: Putting up ring bund having top width of 1 m, bottom width of 2m, and average ht of 1.8m using bamboo post of 12.5m long 100mm dia driven 50 cm below bed level at 60 cm c/c vertical spacing. 1/3 rd split bamboo reapers fitted horizontally at 30 cm c/c, bamboo cross ties at 100cm c/c, side screening with plaited coconut cadjan madals including coir yarn for tying inclusive of all labor charges and filling with own earth between screening in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming & watering and maintaining the bund leak-proof for the maintaining period including labor for dismantling the bund after completion of the work, etc, complete as per direction. | 19.54 | 1 meter | 3,563 ₹69,621.02 Lowest |
Tender Value
₹69,622
EMD Value
₹1,741
Closing Date
6 Jul 2026, 3:00 pmClosed
AE
Office of the Assistant Engineer LIDEW Kodungalloor municipality
RE GENERAL KDLR MTY 2025 26 CONSTRUCTION OF BUND IN WARD 33 KDLR MTY 2025 26 CONSTRUCTION OF BUND IN WARD 33 General Civil Work
2026_LSGD_857997_12
2/26-27
Open Tender
Civil Works - Others
Item Rate
Office of the Assistant Engineer LIDEW Kodungall
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,741
Yes
20 Aug 2026
30 Jun 2026
8 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Wooden Sluice and Temporary Bund | |||||
| 1.001 | OD427057/2025-2026: Putting up ring bund having top width of 1 m, bottom width of 2m, and average ht of 1.8m using bamboo post of 12.5m long 100mm dia driven 50 cm below bed level at 60 cm c/c vertical spacing. 1/3 rd split bamboo reapers fitted horizontally at 30 cm c/c, bamboo cross ties at 100cm c/c, side screening with plaited coconut cadjan madals including coir yarn for tying inclusive of all labor charges and filling with own earth between screening in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming & watering and maintaining the bund leak-proof for the maintaining period including labor for dismantling the bund after completion of the work, etc, complete as per direction. | 1 | 1 meter | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1450591.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BUND33.pdf
Tender Documents • 1.78 MB
BOQ_1450591.xls
BOQ • 0.30 MB
AF.pdf
Tender Documents • 0.24 MB
FOT.pdf
Tender Documents • 0.25 MB
PA.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .