| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.5 LAccepted-Finance | 1 | Accepted-Finance Lowest | |
| 2 | 2₹16.2 L+₹73,292 (4.74%)Accepted-Finance | 2 | Accepted-Finance Second lowest | |
| 3 | 3₹16.8 L+₹1.3 L (8.50%)Accepted-Finance NOT SPECIFIED IN THE DOCUMENT | 3 | Accepted-Finance Third lowest | |
| 4 | 4₹16.8 L+₹1.3 L (8.53%)Accepted-Finance 7 395B CHERIA VAPPALASSERY ANGAMALY SOUTH 683573 | ANGAMALY | ERNAKULAM | KERALA | 683573 | 4 | Accepted-Finance Fourth lowest | |
| 5 | 5₹23.9 L+₹8.4 L (54.6%)Accepted-Finance | 5 | Accepted-Finance Fifth lowest |
| Sl No | Description | Qty | Unit | Virgin Power and Engineering Pvt Ltd L4 | TACHYONS ENERGY PRIVATE LIMITED L2 | EDISON ELECTRICAL ENGINEERING L3 | Baby NV L5 | NTFEB ENGINEERS AND CONTRACTORS L1 | Mathew V L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Material | |||||||||
| 1.01 | Cable 1.1kV XLPE AL UG 3.5c x 300 sq mm (armoured) | 450 | metre | 2,110 ₹9,49,500 | 1,945 ₹8,75,250 Lowest | 2,114.25 ₹9,51,412.5 | 3,100 ₹13,95,000 | 2,055.86 ₹9,25,137 | 3,300 ₹14,85,000 |
| 2.00Labour | |||||||||
| 2.01 | Dismantling of solar panels of standard size carefully and stacking the same at maximum of 50m away from the place of dismantling taking all safety precautions as per direction of departmental officers | 600 | Nos | 28 ₹16,800 Lowest | 29 ₹17,400 | 29.34 ₹17,604 | 39 ₹23,400 | 28 ₹16,800 Lowest | 40 ₹24,000 |
| 2.02 | Dismantling of solar panel mounting structures by loosening bolt and nut and cutting the base structure. | 4.55 | MT | 4,400 ₹20,020 | 4,475 ₹20,361.25 | 4,385.93 ₹19,955.98 | 6,265 ₹28,505.75 | 4,215 ₹19,178.25 Lowest | 6,500 ₹29,575 |
| 2.03 | Dismantling of Module Cleaning System and accessories including dismantling of pipes,cleaning motor and all accessories complete stacking the same at maximum of 50m away from the place of dismantling taking all safety precautions as per direction of departmental officers | 75 | metre | 25 ₹1,875 | 25 ₹1,875 | 24.92 ₹1,869 | 33 ₹2,475 | 18 ₹1,350 Lowest | 34 ₹2,550 |
| 2.04 | Dismantling of Lightning Arrestor spike set and its connections including disconnecting strips, dismantling of pipes and all accessories complete stacking the same at maximum of 50m away from the place of dismantling taking all safety precautions as per direction of departmental officers | 1 | Nos | 765 ₹765 | 765 ₹765 | 749.97 ₹749.97 Lowest | 945 ₹945 | 765 ₹765 | 950 ₹950 |
| 2.05 | Dismantling DC Cable after removing connectors taking all safety precautions stacking the same at maximum of 50m away at place of storage as per direction of departmental officers | 850 | metre | 4 ₹3,400 | 4 ₹3,400 | 4.35 ₹3,697.5 | 5.32 ₹4,522 | 3.8 ₹3,230 Lowest | 6 ₹5,100 |
| 2.06 | Dismantling AC Cable/earth cable(16mm2-70 mm2) after removing connectors taking all safety precautions stacking the same at maximum of 50m away at place of storage as per directin of departmental officers | 130 | metre | 14 ₹1,820 | 15 ₹1,950 | 15.43 ₹2,005.9 | 19 ₹2,470 | 12.75 ₹1,657.5 Lowest | 20 ₹2,600 |
| 2.07 | Dismantling of ACDB or DCDB or Compiler box (Above 30KW) after removing all connections taking all safety precautions and stacking the same at maximum of 50m away as per direction of departmental officers | 4 | Nos | 803 ₹3,212 | 803 ₹3,212 | 787.27 ₹3,149.08 | 1,003 ₹4,012 | 695 ₹2,780 Lowest | 1,050 ₹4,200 |
Tender Value
₹17.2 L
EMD Value
₹43,100
Closing Date
31 Jul 2026, 5:00 pmClosed
Assistant Executive Engineer
Office of Assistant Executive Engineer Maintenance Sub Division Madakkathara
Dismantling of 150 kWp rooftop solar plant from the office main control room and DG room building and installing as ground mounted solar plant including the installation of already dismantled 45 kWp solar plant at 400 kV Substation Madakkathara.
2026_KSEB_861169_1
02/2026-27/AEE/MSD/MDKA
Open Tender
Electrical Works
Item Wise
60 days
400kV Substation Madakkathara
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
₹43,100
22 Sept 2026
17 Jul 2026
3 Aug 2026
18 Jul 2026
31 Jul 2026
18 Jul 2026
18 Jul 2026 - 31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material | |||||
| 1.01 | Cable 1.1kV XLPE AL UG 3.5c x 300 sq mm (armoured) | 450 | metre | 2,157.4 | ₹9,70,830 |
| 2Labour | |||||
| 2.01 | Dismantling of solar panels of standard size carefully and stacking the same at maximum of 50m away from the place of dismantling taking all safety precautions as per direction of departmental officers | 600 | Nos | 29.94 | ₹17,964.6 |
| 2.02 | Dismantling of solar panel mounting structures by loosening bolt and nut and cutting the base structure. | 4.55 | MT | 4,475.44 | ₹20,363.25 |
| 2.03 | Dismantling of Module Cleaning System and accessories including dismantling of pipes,cleaning motor and all accessories complete stacking the same at maximum of 50m away from the place of dismantling taking all safety precautions as per direction of departmental officers | 75 | metre | 25.42 | ₹1,906.77 |
| 2.04 | Dismantling of Lightning Arrestor spike set and its connections including disconnecting strips, dismantling of pipes and all accessories complete stacking the same at maximum of 50m away from the place of dismantling taking all safety precautions as per direction of departmental officers | 1 | Nos | 765.28 | ₹765.28 |
| 2.05 | Dismantling DC Cable after removing connectors taking all safety precautions stacking the same at maximum of 50m away at place of storage as per direction of departmental officers | 850 | metre | 4.44 | ₹3,772.81 |
| 2.06 | Dismantling AC Cable/earth cable(16mm2-70 mm2) after removing connectors taking all safety precautions stacking the same at maximum of 50m away at place of storage as per directin of departmental officers | 130 | metre | 15.75 | ₹2,046.89 |
| 2.07 | Dismantling of ACDB or DCDB or Compiler box (Above 30KW) after removing all connections taking all safety precautions and stacking the same at maximum of 50m away as per direction of departmental officers | 4 | Nos | 803.34 | ₹3,213.35 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 1.30 MB
Tendernotice_3.pdf
PDF • 1.44 MB
BOQ_1456379.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .