Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC NEW GENERAL STORE PERINJANAM P O THRISSUR 680686 | THRISSUR | THRISSUR | KERALA | 680686 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.2 L+₹67,504 (26.3%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.4 L+₹80,172 (31.2%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹3.8 L+₹1.3 L (49.8%)Rejected-AOC NIL | L4 | Rejected-AOC L4 |
Tender Value
₹3.7 L
EMD Value
₹5,490
Closing Date
13 Aug 2021, 5:00 pmClosed
Divisional Forest Officer
North Wayanad Forest Division, Mananthavady
Estimate for the cost of supply installation and commissioning of solar power fencing line around Akamcholamala Colony at Varayal Forest Station in Peria Range during 2021-22.
2021_FD_433530_1
D-2959/21
Open Tender
Civil Works - Others
Item Wise
60 days
Varayal
Please refer Tender documents.
5 documents required · 5 mandatory
₹864
Yes
₹5,490
Yes
12 Oct 2021
5 Aug 2021
18 Aug 2021
5 Aug 2021
13 Aug 2021
5 Aug 2021
Amount
MATERIAL
od81330/2021_2022 : ENERGIZER<br>Should be Battery Operated switch to high, medium and low power settings. Solar panel option to recharge 12-Vol Battery. Auxiliary supply provision for 23 V ac should be there.Should operate at one / different fences independently Should be capable to energize the length of fence up to 5 km. (5 stands) should be suitable for other requirements of the work.Each are shall have is own Energizer and alarming system. Any intrusion/ unwanted activation of the fence should be suitable annunciation with audio alarm system.Operating voltage at 590 k load 10 KV Maximum. Other parametres with 1 K Load,Operating voltage- 6.0 - 8.0 Kv - At High setting O/P energy - 3.5 to 5.1<br>Peak current - 7.0 - 8.0 Amps at high setting<br>RMS Current 2.4 - 2.8 Amps at high setting <br>Output charge - 1.0 - 1.4 million Col - at high setting <br>Fib Energy - 3.5 - 4.5 MCA - at high setting <br>pulse duration - 0.01 - 3 million - sec. <br>Pulse interval - 1.1 - 1.4 sec
od81333/2021_2022 : Supply of Charge Controller Unit 12 V 12AMP
od81340/2021_2022 : LIGHTNING DIVERTING KIT<br>Must be capable of diverting stray lightening. The diverter assembly must be adjustable for spark gaps.<br>Lightning diverter kit should be as close as possible to the Energizer<br>Adequate earthing to be provided.
od81346/2021_2022 : TOOL KIT<br>Should contain: Wire tightner handle, Twisting tool, Pliers, Double ended spanner for clamp tightning
od86038/2021_2022 : 12 V BATTERY CHARGER 10 Amp
od86059/2021_2022 : Supplying Digital Volt meter
od86060/2021_2022 : Supplying multi meter
od81375/2021_2022 : LEAD OUT CABLE<br>Must be double insulated with standing 15 kv voltagages. Inner core wiremust be hot dip galvanized. For under gate and base unit connection.
od81376/2021_2022 : Joint clamp
od81377/2021_2022 : SUPER STRAIN INSULATOR
od81379/2021_2022 : Winding 14 G WIRE SWG galvanized
od81381/2021_2022 : SUPER EARTH KIT <br>Earthing system <br>Must contain earth mixture capable of retaining moisture. 8 mm Diametre stainless steel rod, non rusting quality of at least 4 feet length Should be capable of providing proper earthing to the system.
od81382/2021_2022 : WIRE TIGHTNER In suit tighteners for proper tensioning of wires should be made from A1-alloy non rusting quality
od81383/2021_2022 : T ANGLE POST 8 FEET LENGTH
od81384/2021_2022 : ACSR 12 G WIRE high tensile wire galvanized 230-300 GSM
od81385/2021_2022 : REEL INSULATOR made of Polypropylene 15 KV UV stabilized
od81386/2021_2022 : 12 V tubular battery, 100 AH
od81387/2021_2022 : ONE inch G.I Support post (7 feet)
od81388/2021_2022 : GI CORNER POST 2 INCH 8.50 FEET LONG
od81389/2021_2022 : Solar panel 150 Watt 12 V
od81390/2021_2022 : "C" CLAMP 50 mm HOT DIPPING GALVANIZED for fixing corner and supporting posts
od86111/2021_2022 : Warning sign<br>Warming sign boards, polyethylene plastic with statutory color and signsYellow with black lettering in local language
od86093/2021_2022 : Knife weeding heavy growth for clearing through the line 2 meter width. As per FSR Sl no.100 (a)1
od86096/2021_2022 : V.D.A for Knife weeding heavy growth F.S.R rate
POST FOOTING and INSTALLATION charges
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
od49100/2021_2022 : Installation charges. Fencing line should install as per std specification and from the direction of Officer in charge
Solaris Energy System
ASIATECH ELECTRONICS
Bidder Name
Solaris Energy System
New General Store
ASIATECH ELECTRONICS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_615808.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .