| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-AOC | ₹44.5 L Quoted ₹46.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹48.7 LRejected-AOC CHEMBISSERY PUTHIYAKAVU TRIPUNITHURA P O KOCHI 682301 | ERNAKULAM | KERALA | 682301 | ₹48.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹48.8 LRejected-AOC | ₹48.8 L | L3 | Rejected-AOC L3 |
| 4 | L4₹49.0 LRejected-AOC | ₹49.0 L | L4 | Rejected-AOC L4 |
| 5 | L5₹49.4 LRejected-AOC THEERTHAM NADUVILEMURI PADANILAM POST NOORANAD ALAPPUZHA DIST KERALA 690529 | ALAPPUZHA | KERALA | 690529 | ₹49.4 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Super Constructions L1 | ZOOM ENTERPRISES L7 | M/s.Rejoy Constructions L2 | M/S AARJAY ASSOCIATES L6 | CREATIVE BUILDERS L3 | Green Ray Enterprises L5 | Bell Builders L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Attending any type of leakage/shortage/overflow in water supply distribution lines laid at various locations inside Naval Base area for detection of nature of defect including carry out minor repairs to make the distribution line functional complete all as specified and directed by the Engr-in-Charge. | 300 | Each Job | 300 ₹90,000 | 520 ₹1.6 L | 420 ₹1.3 L | 500 ₹1.5 L | 420 ₹1.3 L | 418 ₹1.3 L | 500 ₹1.5 L |
| 1.01Notes :- (a) The unit rate quoted shall be deemed to be included the elements of labour only for arresting the leakage and making the supply line functional for minor repair such as releasing air locks, clearing float valve blockages and checking any closed valves along with the supply, putting an end cap, etc. If replacements of pipe/items is required to make the supply line functional, the cost of labour and material for the same shall be measured and paid as "Supply & fix/Material & labour in repairs" under relevant items of this schedule here in after. (b) If leakage/shortage shall not be attended & rectified in the same day as received by the contractor except major break down, the recovery will be made @ Rs 500/- per breakdown per day and after 15 days of non functional of any distribution line, as specified for any reason, the recovery will be made @ 2000/- per day till the distribution line functional | ||||||||||
| 2.00 | Excavation in trenches not exe. 1.5 M in depth and not exe 1.5 M in width including getting out for laying pipes etc including forming bottom surface to required level in soft/loose soil complete all as specified and directed | 220 | Cum | 300 ₹66,000 | 300 ₹66,000 | 380 ₹83,600 | 350 ₹77,000 | 300 ₹66,000 | 300 ₹66,000 | 400 ₹88,000 |
| 3.00 | Returning, refilling including spreading levelling watering and well ramming in layers not exce. 25 cm thick complete all as specified and directed | 188 | Cum | 100 ₹18,800 | 130 ₹24,440 | 120 ₹22,560 | 130 ₹24,440 | 90 ₹16,920 | 80 ₹15,040 | 80 ₹15,040 |
| 4.00 | Removing the surplus soil to a distance not exe. 50 M and depositing where directed at a level not exe. 1.5 M from the starting point complete all as specified and directed | 32 | Cum | 150 ₹4,800 | 130 ₹4,160 | 120 ₹3,840 | 140 ₹4,480 | 110 ₹3,520 | 120 ₹3,840 | 110 ₹3,520 |
| 5.00 | Supply and laying in repairs in trenches 100 mm inner dia of CPVC pipes with CPVC Sch 40 pipes & plain Sch 80 fittings and jointed with CPVC primer & solvent cement including taking down old unserviceable PVC/PP-R/ GI Tubing, complete all as specified and directed. | 250 | RM | 1,550 ₹3.9 L | 2,050 ₹5.1 L | 1,950 ₹4.9 L | 1,920 ₹4.8 L | 1,800 ₹4.5 L | 1,750 ₹4.4 L | 2,100 ₹5.3 L |
| 6.00 | All as per item No 5 here-in-before but of size 80 mm inner dia complete all as specified and directed | 350 | RM | 1,100 ₹3.9 L | 550 ₹1.9 L | 600 ₹2.1 L | 830 ₹2.9 L | 510 ₹1.8 L | 850 ₹3.0 L | 550 ₹1.9 L |
| 7.00 | Supply and fix in repairs in trenches high pressure CPVC pipes SDR-13.5 & plain CPVC SDR 11 fittings including all necessary fittings, solvents of size 50 mm dia including taking down old unserviceable PVC/PP-R/ GI tubing complete all as specified and directed. | 450 | RM | 490 ₹2.2 L | 520 ₹2.3 L | 540 ₹2.4 L | 450 ₹2.0 L | 500 ₹2.3 L | 500 ₹2.3 L | 500 ₹2.3 L |
| 8.00 | All as per item No 7 here-in-before but of size 40 mm dia complete all as specified and directed. | 450 | RM | 350 ₹1.6 L | 500 ₹2.3 L | 520 ₹2.3 L | 400 ₹1.8 L | 490 ₹2.2 L | 450 ₹2.0 L | 450 ₹2.0 L |
| 9.00 | All as per item No 7 here-in-before but of size 25 mm dia complete all as specified and directed. | 550 | RM | 210 ₹1.2 L | 300 ₹1.6 L | 220 ₹1.2 L | 320 ₹1.8 L | 250 ₹1.4 L | 280 ₹1.5 L | 275 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹94,540
Closing Date
12 Jul 2025, 6:00 pmClosed
GE NS KOCHI
Military Engineer Services Garrison Engineer (Naval Services) Kataribagh, Naval Base Post Kochi 682004.
REPAIR AND MAINTENANCE OF EXTERNAL WATER SUPPLY DISTRIBUTION LINES AT INS GARUDA AND NAVAL BASE EXCEPT NAY KOCHI
2025_MES_715512_1
8515/E8
Open Tender
Civil Works - Water Works
330 days
KOCHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE NS KOCHI
₹94,540
Yes
12 Feb 2026
19 Jun 2025
14 Jul 2025
19 Jun 2025
12 Jul 2025
4 Jul 2025
19 Jun 2025 - 20 Jun 2025
Amount
Attending any type of leakage/shortage/overflow in water supply distribution lines laid at various locations inside Naval Base area for detection of nature of defect including carry out minor repairs to make the distribution line functional complete all as specified and directed by the Engr-in-Charge.
Notes :- (a) The unit rate quoted shall be deemed to be included the elements of labour only for arresting the leakage and making the supply line functional for minor repair such as releasing air locks, clearing float valve blockages and checking any closed valves along with the supply, putting an end cap, etc. If replacements of pipe/items is required to make the supply line functional, the cost of labour and material for the same shall be measured and paid as "Supply & fix/Material & labour in repairs" under relevant items of this schedule here in after. (b) If leakage/shortage shall not be attended & rectified in the same day as received by the contractor except major break down, the recovery will be made @ Rs 500/- per breakdown per day and after 15 days of non functional of any distribution line, as specified for any reason, the recovery will be made @ 2000/- per day till the distribution line functional
Excavation in trenches not exe. 1.5 M in depth and not exe 1.5 M in width including getting out for laying pipes etc including forming bottom surface to required level in soft/loose soil complete all as specified and directed
Returning, refilling including spreading levelling watering and well ramming in layers not exce. 25 cm thick complete all as specified and directed
Removing the surplus soil to a distance not exe. 50 M and depositing where directed at a level not exe. 1.5 M from the starting point complete all as specified and directed
Supply and laying in repairs in trenches 100 mm inner dia of CPVC pipes with CPVC Sch 40 pipes & plain Sch 80 fittings and jointed with CPVC primer & solvent cement including taking down old unserviceable PVC/PP-R/ GI Tubing, complete all as specified and directed.
All as per item No 5 here-in-before but of size 80 mm inner dia complete all as specified and directed
Supply and fix in repairs in trenches high pressure CPVC pipes SDR-13.5 & plain CPVC SDR 11 fittings including all necessary fittings, solvents of size 50 mm dia including taking down old unserviceable PVC/PP-R/ GI tubing complete all as specified and directed.
All as per item No 7 here-in-before but of size 40 mm dia complete all as specified and directed.
All as per item No 7 here-in-before but of size 25 mm dia complete all as specified and directed.
Supply and laying in repairs walls/ceiling or laying in floors 100 mm inner dia of CPVC pipes with CPVC Sch 40 pipes & plain Sch 80 fittings and jointed with CPVC primer & solvent cement including taking down old unserviceable PVC/PP-R/ GI Tubing, complete all as specified and directed.
All as per item No 10 here-in-before but of size 80 mm inner dia complete all as specified and directed
Supply and fix in repairs on wall/concealed on wall high pressure CPVC pipes SDR-13.5 & plain CPVC SDR 11 fittings including all necessary fittings, solvents of size 50 mm dia including taking down old unserviceable PVC/PP-R/ GI tubing complete all as specified and directed.
All as per item No 12 here-in-before but of size 40 mm dia complete all as specified and directed
All as per item No 12 here-in-before but of size 25 mm dia complete all as specified and directed
All as per item No 12 here-in-before but of size 20 mm dia complete all as specified and directed
Supply and fix in repairs CPVC Ball Valve of size 50 mm dia suitable for CPVC pipe incl necessary fittings and taking down old one complete all specified and directed.
All as per item No. 16 here-in-before but of size 40 mm dia complete all specified and directed.
All as per item No. 16 here-in-before but of size 25 mm dia complete all specified and directed.
All as per item No.16 here-in-before but of size 20 mm dia complete all specified and directed.
Demolition of cement concrete in ground floors and paving n exc 15cm thickness, above ground level in the foundation complete all specified and directed.
Material and labour for cement concrete in foundations, filling and mass concrete type 1:3:6(40mm graded stone aggregate) complete all specified and directed.
Supply and fix in repairs Gun metal Gate/Globe valve with iron wheel head, screwed both ends suitable for fixing with CPVC pipe of outer dia 50mm, complete all as specified and as directed by the Engineer-in-charge.
All as per Item No 22 here-in-before but 40mm complete all specified and directed.
All as per Item No 22 here-in-before but 25mm complete all specified and directed.
Material and labour for Construction of brick masonry valve pit of size 1.2 x1.2 x 0.9 Mtrs (internal dimensions) including excavation and earth work in any type of soil, PCC 1:2:4 type B-2 in foundation brick work in CM 1:4, 15mm thick plastering in CM 1:4 internally and flush pointing externally in same mortar as the work process angle iron frame work 40X40X6mm, with 6mm thick MS sheet cover with 12 mm dia handle and locking arrangement (including lock and two Keys) and two coats of synthetic enamel paint over a coat of red oxide primer complete all specified and directed by Engr-in-Charge including demolition of old valve pits
Supply and fix in repairs in replacement of 2000 litre capacity Rotational moulded polyethylene water storage tanks( ISI marked) (cylindrical vertical with closed top) hoisted & fixed in position including taking down old one complete all as specified and directed
All as per item No 26 here-in-before but 1000 litre capacity complete all specified and directed.
All as per item No 26 here-in-before but 500 litre capacity complete all specified and directed.
Supply and fix in repairs 40 mm bore float valve synthetic (PVC) high pressure with polythene ball of suitable size and flynut including taking out old one complete all as specified and directed.
All as per item No 29 here-in-before but 25 mm bore complete all specified and directed.
All as per item No 29 here-in-before but 20 mm bore complete all specified and directed.
Cutting existing road/hardstand/concrete blocks/slabs/brick work or stone masonry of any type by using crow bar chisel up to a depth of 30 cm for laying GI pipe including making good the surface by returning filling watering ramming in layers cold mix bitumen over 200 mm thick hard core of broken bricks/stones over returning filling watering ramming in layers not exceeding 25 cm thick complete all as specified and directed by Engineer-in-Charge
Material and labour for GI tubing medium grade (ISI marked) with all fitting/accessories for protection of CPVC Pipe under road crossing including necessary fittings etc including taking down old U/S items complete all specified and directed of size 50 mm dia
All as per item No 33 here-in-before but GI pipe of size 80 mm dia complete all specified and directed.
All as per item No 33 here-in-before but GI pipe of size 100 mm dia complete all specified and directed.
Supply and fixing Butterfly valve 80 mm with necessary fittings complete including taking down old u/s valve 80 mm complete all specified and directed.
All as per item No 36 here-in-before but of size 100 mm dia complete all specified and directed.
M/s.Rejoy Constructions (BID ID -3356240)
CREATIVE BUILDERS (BID ID -3356682)
Bell Builders (BID ID -3356718)
Green Ray Enterprises (BID ID -3356387)
M/S AARJAY ASSOCIATES (BID ID -3356522)
ZOOM ENTERPRISES (BID ID -3356160)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid