Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹21.5 Cr
EMD Value
₹21.5 L
Closing Date
27 Nov 2026, 5:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Executive Officer, Sarigam Clean Initiative, Sarigam
Annual Rate Contract (ARC) for Comprehensive Operation, Maintenance & Repair (O&M&R) of 25 MLD Common Eluent Treatment Plant (CETP) and Final Pumping Station, including Civil, Mechanical, Electrical, Instrumentation, Automation, PLC-SCADA System, Online Continuous Eluent Monitoring System (OCEMS), Laboratory Operations, Security Services, Housekeeping and Allied Works at GIDC Sarigam Industrial Estate, Gujarat.
367013
01 OF 2026-27
Open
Miscellaneous Works
Works
Valsad
6 documents required · 6 mandatory
₹25,000
CHIEF EXECUTIVE OFFICER, SARIGAM CLEAN INITIATIVE
₹21.5 L
18 Nov 2026
18 Nov 2026
18 Nov 2026
27 Nov 2026
18 Nov 2026
180 days
NAME OF WORK: Annual Rate Contract (ARC) for Comprehensive Operation,
Maintenance & Repair (O&M&R) of 25 MLD Common E luent Treatment Plant (CETP)
and Final Pumping Station, including Civil, Mechanical, Electrical, Instrumentation,
Automation, PLC-SCADA System, Online Continuous E luent Monitoring System
(OCEMS), Laboratory Operations, Security Services, Housekeeping and Allied Works
at GIDC Sarigam Industrial Estate, Gujarat.
TENDER REFERENCE E-SHORT TENDER NOTICE NO. 01 OF 2026-27
CONTRACT PERIOD 24 Months
TENDER ISSUE DATE 18.11.2026
BID OPENING DATE 02.12.2026 at 11:00 AM
TENDER INVITED BY
SARIGAM CLEAN INITIATIVE
CETP, GIDC Industrial Estate, Sarigam, Gujarat
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 1 | P a g e
Sr. No. Particulars Page No.
1 Section 1: Notice Inviting E-Tender (NIT) & Bid Schedule
2 Section 2: Memorandum Of Work in brief
3 Section 3: Instructions to Bidders
4 Section 4: Eligibility Criteria & Pre-Qualification Requirements
5 Section 5: Bid Submission Requirements
6 Section 6: EVALUATION OF PRE-QUALIFICATION APPLICATIONS
7 Section 7: Special Conditions of Contract (SCC)
8 Section 8: Project Overview & Existing Facilities
9 Section 9: Scope of Work
10 Section 10: Schedule–B (Financial Bid / Price Bid)
12 12.1 Appendix–A : Eligibility Documents
12.2 Appendix–B : Machinery Deployment Undertaking
12.3 Appendix–C : Self-Evaluation & Compliance Matrix
12.4 Appendix–D : Bid Capacity Statement
12.5 Appendix–E : Current Commitments
12.6 Appendix–F : General Information of Bidder
12.7 Appendix–G : Organization Structure & Key Management
12.8 Appendix–H : Details of Manpower Deployment
12.9 Appendix–I : Litigation History
12.10 Appendix–J : Plant & Machinery Details
12.11 Appendix–K : Minimum Sampling Schedule
12.12 Appendix–L : Minimum Tools, Tackles & Testing Equipment
12.13 Appendix–M : Preventive Maintenance Schedule
12.14 Appendix–N : Reporting Formats
12.15 Appendix–O : Affidavit for Non-Blacklisting / Debarment
12.16 Appendix–P : Site Visit Certificate
12.17 Appendix–Q : Undertaking for Truthfulness of Information
12.18 Form–B1 Attached
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 2 | P a g e
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 3 | P a g e
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 4 | P a g e
SECTION 1: NOTICE INVITING E-TENDER (NIT) & BID SCHEDULE
E-SHORT TENDER NOTICE NO. 01 OF 2026-27: Sarigam Clean Initiative (SCI), Sarigam, invites
online bids through E-Tendering for the following work:
Sr. Particulars Details
1 Tender Notice No. E-SHORT TENDER NOTICE NO. 01 OF 2026-27
2 Name of Work Annual Rate Contract (ARC) for Comprehensive
Operation, Maintenance & Repair (O&M&R) of 25 MLD
Common Effluent Treatment Plant (CETP) and Final
Pumping Station, including Civil, Mechanical, Electrical,
Instrumentation, Automation, PLC-SCADA System,
Online Continuous Effluent Monitoring System (OCEMS),
Laboratory Operations, Security Services, Housekeeping
and Allied Works at GIDC Sarigam Industrial Estate,
3 Tender Inviting Chief Executive Officer, Sarigam Clean Initiative (SCI)
4 Employer Sarigam Clean Initiative (SCI)
5 Location of Work Common Effluent Treatment Plant (CETP), GIDC Sarigam
Industrial Estate, Taluka Umbergaon, District Valsad,
6 Type of Tender Open E-Tender under Two Bid System (Technical Bid &
7 Tender Category Works / Service Contract
8 Nature of Contract Annual Rate Contract (ARC)
9 Contract Period 24 (Twenty Four) Months from the date of commencement
10 Estimated Contract ₹
11 Earnest Money ₹
12 Tender Processing Fee As applicable on the E-Tender Portal
13 Tender Document Fee ₹ 25,000.00 (Non-Refundable)
14 Bid Validity 180 Days from the last date of submission of Bid
15 Performance Security As specified in the Tender Conditions
/ Performance Bank
Guarantee (PBG)
16 Security Deposit (SD) 5.00% of the Contract Value, comprising 2.50% Initial
Security Deposit before execution of the Agreement
and 2.50% recovered from Running Account (RA) Bills, as
per Tender Conditions.
17 Mode of Submission Online submission through the E-Tender Portal only.
Original documents, wherever required, shall be submitted
in physical form within the prescribed time.
18 E-Tender Portal www.nprocure.com
19 Address for Chief Executive Officer, Sarigam Clean Initiative (SCI),
Communication Common Effluent Treatment Plant (CETP), GIDC Sarigam
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 5 | P a g e
Industrial Estate, Taluka Umbergaon, District Valsad,
20 Contact Details Phone: +91-76984
E-mail: [email protected]
21 Online Tender 18.11.2026 to 28.11.2026
Document Download &
22 Physical Submission of 30.11.2026 to 01.12.2026 (09:00 AM to 05:00 PM)
Original EMD / Tender
Fee Instruments
23 Opening of Technical 02.12.2026 at 11:00 AM
SCI reserves the right to accept or reject any or all bids without assigning any reason
SCI reserves the right to verify any information, experience certificates, turnover
certificates, performance certificates, manpower details and statutory registrations
submitted by the bidder.
Submission of false information shall result in rejection of bid, forfeiture of EMD,
termination of contract and blacklisting.
Payee Name for Tender Fee and EMD:
The Demand Draft (DD) towards Tender Document Fee and Earnest Money Deposit
(EMD), wherever applicable, shall be drawn in favour of "CHIEF EXECUTIVE OFFICER,
SARIGAM CLEAN INITIATIVE", payable at Sarigam, from any Nationalized / Scheduled
Bank, as applicable under the Tender Conditions.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 6 | P a g e
SECTION 2: MEMORANDUM OF WORK IN BRIEF
Sr. Particulars Description
1 Name of Work Annual Rate Contract (ARC) for Comprehensive Operation,
Maintenance & Repair (O&M&R) of 25 MLD Common Effluent
Treatment Plant (CETP) and Final Pumping Station, including
Civil, Mechanical, Electrical, Instrumentation, Automation, PLC-
SCADA System, Online Continuous Effluent Monitoring System
(OCEMS), Laboratory Operations, Security Services,
Housekeeping and Allied Works at GIDC Sarigam Industrial
Estate, Gujarat.
2 Employer Sarigam Clean Initiative (SCI)
3 Project Location Common Effluent Treatment Plant (CETP), GIDC Sarigam
Industrial Estate, Taluka Umbergaon, District Valsad, Gujarat.
4 Nature of Annual Rate Contract (ARC).
5 Type of Agreement B-1 Agreement or such other form of agreement as prescribed by
6 Plant Capacity 25 MLD (25,000 KLD) Common Effluent Treatment Plant including
Final Pumping Station.
7 Contract Period 24 (Twenty Four) Months from the date of commencement of
8 Scope of Work Comprehensive Operation, Maintenance & Repair (O&M&R) of
the entire CETP and Final Pumping Station including all Civil,
Mechanical, Electrical, Instrumentation, Automation, PLC-
SCADA System, OCEMS, Laboratory, Utility Systems, Security
Services, Housekeeping and all allied works as detailed in the
9 Type of Bid Two Bid System comprising Technical Bid and Financial Bid.
10 Performance The Contractor shall operate and maintain the CETP to
Requirement continuously achieve treated effluent quality conforming to
GPCB/CPCB Consent Conditions and all applicable statutory
environmental standards throughout the Contract Period.
11 Applicable Environment (Protection) Act, 1986, Water (Prevention & Control
Standards of Pollution) Act, GPCB, CPCB, MoEF Guidelines and all other
applicable Acts, Rules, Regulations, Codes and Amendments in
12 Working Schedule Continuous 24 Hours × 365 Days operation including Sundays
and Public Holidays.
13 Manpower The Contractor shall deploy adequate qualified, experienced and
Deployment trained technical, supervisory, laboratory, security and
housekeeping personnel as specified in the Tender Document.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 7 | P a g e
14 Chemicals & Contractor shall arrange all chemicals, lubricants, laboratory
Consumables reagents, consumables and other materials required for
satisfactory operation and maintenance, unless otherwise
specifically stated in the Tender Document.
15 Operation Safe, reliable and uninterrupted operation of the entire CETP,
Responsibility Final Pumping Station and all associated utilities and systems.
16 Maintenance Comprehensive Preventive, Predictive, Routine and Breakdown
Responsibility Maintenance of all Civil, Mechanical, Electrical, Instrumentation,
Automation, PLC-SCADA, OCEMS and Utility Systems throughout
the Contract Period.
17 Safety & Statutory Contractor shall comply with all applicable Labour Laws, Factory
Compliance Safety Requirements, Environmental Regulations, Statutory
Approvals and Safety Practices during execution of the Contract.
18 Site Visit Bidders are advised to visit and inspect the project site before
submission of the bid. No claim arising out of lack of knowledge
of site conditions, existing facilities or scope of work shall be
entertained thereafter.
19 Estimated As specified in the Notice Inviting Tender (NIT).
20 Earnest Money As specified in the Notice Inviting Tender (NIT).
21 Tender Fee As specified in the Notice Inviting Tender (NIT).
22 Bid Validity 180 Days from the last date of submission of Bid.
23 Performance Bank The Successful Bidder shall furnish a Performance Bank
Guarantee (PBG) Guarantee equivalent to 5.00% of the Contract Value prior to
commencement of the Contract in the prescribed format.
24 Security Deposit 5.00% of the Contract Value, comprising 2.50% Initial Security
(SD) Deposit to be submitted before execution of the Agreement, and
the remaining 2.50% shall be recovered proportionately from the
Running Account (RA) Bills until the total Security Deposit
of 5.00% is achieved.
25 Liquidated As specified in the General Conditions of Contract and Special
Damages Conditions of Contract.
26 Taxes & Duties GST and all other applicable taxes, duties, levies and statutory
deductions shall be governed by the applicable laws and Tender
27 Payment Terms Monthly payment shall be released against certified Running
Account (RA) Bills subject to satisfactory performance, statutory
compliance and certification by the Engineer-in-Charge/SCI.
28 Defect Liability / Throughout the Contract Period in accordance with the Tender
Maintenance Conditions.
29 Completion Successful Operation, Maintenance & Repair of the entire CETP
Requirement and Final Pumping Station throughout the Contract Period while
ensuring uninterrupted operation, statutory compliance and
achievement of prescribed treated effluent quality.
30 Governing This Memorandum shall be read in conjunction with the Notice
Documents Inviting Tender (NIT), Instructions to Bidders, Eligibility Criteria,
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 8 | P a g e
General Conditions of Contract (GCC), Special Conditions of
Contract (SCC), Technical Specifications, Scope of Work,
Drawings, Schedule-B/BOQ and all Appendices forming part of
the Tender Document.
SECTION 3: INSTRUCTIONS TO BIDDERS
3.1 General Instructions to Bidders
1. The Bidder shall carefully read and examine the entire Tender Document, including the
Notice Inviting Tender (NIT), Memorandum of Work, Instructions to Bidders, Eligibility
Criteria, Scope of Work, Technical Specifications, Conditions of Contract, Schedules,
Appendices, Forms, Corrigenda, Addenda and all other documents forming part of the
Tender before submitting the Bid.
2. The submission of a Bid shall be deemed to constitute the Bidder's unconditional
acceptance of all terms, conditions, specifications and requirements contained in the
Tender Document.
3. The Bidder shall submit the Bid only through the prescribed e-Tender Portal in
accordance with the procedure specified in the Tender Document. No physical Bid shall
be accepted unless specifically required.
4. The Bid shall comprise all documents, certificates, declarations and information as
prescribed in the Tender Document. Failure to furnish any required document or
information may render the Bid non-responsive.
5. The Bidder shall quote rates only in the prescribed Financial Bid (Schedule-B). Rates
quoted in any other form or document shall not be considered.
6. All quoted rates shall remain firm and shall include all costs necessary for satisfactory
execution of the Contract unless otherwise specifically provided in the Tender
7. Conditional Bids, incomplete Bids, alternative Bids or Bids containing deviations from the
Tender requirements shall be liable for rejection.
8. Where the Bid is submitted by a Company, Partnership Firm, LLP or any other legal entity,
it shall be signed by a duly authorized person and supported by a valid Power of Attorney,
Board Resolution or Authorization Letter, as applicable.
9. The Bidder shall possess all statutory registrations, licences, approvals and certifications
required under the applicable laws for execution of the Contract.
10. The Bidder shall be solely responsible for verifying all Corrigenda, Addenda, Clarifications
and Amendments uploaded on the e-Tender Portal prior to submission of the Bid.
11. Sarigam Clean Initiative reserves the right to accept or reject any or all Bids, cancel the
Tender process, modify the scope of work or annul the Tender without assigning any
reason whatsoever, and no claim shall lie against the Employer on this account.
12. Unless otherwise specified in the Financial Bid, the quoted rates shall be exclusive of
Goods and Services Tax (GST). GST and other applicable statutory taxes shall be
governed by the provisions of the Tender Document and applicable laws.
3.2 Special Instructions to Bidders
1. The Contract pertains to the comprehensive Operation, Maintenance and Repair
(O&M&R) of the 25 MLD Common Effluent Treatment Plant (CETP), Sarigam, including
Civil, Mechanical, Electrical, Instrumentation, Automation, PLC-SCADA System, Online
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 9 | P a g e
Continuous Effluent Monitoring System (OCEMS), Laboratory Operations, Security
Services, Housekeeping and all allied works.
2. The Contractor shall ensure uninterrupted operation of the CETP on a continuous basis,
twenty-four (24) hours a day and three hundred sixty-five (365) days a year throughout the
Contract Period.
3. The Contractor shall operate, maintain and keep all plant equipment, machinery, utilities
and associated facilities in safe, efficient and serviceable condition.
4. The Contractor shall ensure that the treated effluent consistently complies with the
Consent Conditions issued by the Gujarat Pollution Control Board (GPCB), the Central
Pollution Control Board (CPCB) and all other applicable statutory requirements.
5. The Contractor shall ensure uninterrupted functioning and data transmission of the
Online Continuous Effluent Monitoring System (OCEMS) and PLC-SCADA System in
accordance with statutory requirements.
6. The Contractor shall deploy adequate qualified, skilled and experienced manpower in
accordance with the Tender requirements and shall maintain such deployment
throughout the Contract Period.
7. The Contractor shall maintain all statutory records, log books, laboratory records,
calibration records, operational registers and maintenance records as prescribed by the
Employer and statutory authorities.
8. The Contractor shall promptly attend to all breakdowns and emergency situations to
ensure uninterrupted operation of the CETP.
9. No deviation from the approved Scope of Work, Technical Specifications or Performance
Requirements shall be permitted without prior written approval of the Employer.
10. The Contractor shall comply with all applicable Acts, Rules, Regulations, Safety
Standards, Environmental Laws and Labour Laws during execution of the Contract.
11. Joint Venture (JV), Consortium or Association bids shall not be permitted. The Bidder shall
participate as a single legal entity and shall remain the sole contracting party fully
responsible for execution of the entire Contract. Notwithstanding the above, a limited
MOU / arrangement for deployment of plant security guards shall be permitted only as
specifically provided in the following clause, without creating a JV, Consortium or
12. A limited MOU for plant security guard services shall be permitted. The MOU agency shall
possess valid statutory registration and relevant experience for the security services
component, and all supporting documents shall be uploaded with the Bid. The MOU shall
be executed on ₹300 non-judicial stamp paper and duly notarized. The Bidder shall
remain solely responsible and liable to SCI for the performance of the security services
and all contractual obligations.
3.3 Mandatory Site Visit
1. The Bidder is strongly advised to visit and inspect the project site before submission of
the Bid to fully understand the nature and extent of the work, site conditions, existing
facilities, accessibility, utilities, operating conditions, risks and all other factors that may
affect the execution of the Contract.
2. The Bidder shall make its own assessment regarding the scope and complexity of the
work and shall not be entitled to any additional payment or extension of time on the
ground of ignorance of site conditions.
3. All costs and expenses incurred in connection with the Site Visit shall be borne solely by
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 10 | P a g e
4. A Site Visit Certificate duly signed by SCI shall be submitted along with the bid.
5. Bids submitted without Site Visit Certificate shall be summarily rejected and shall not be
considered for technical evaluation.
3.4 Clarifications, Corrigenda & Addenda
1. Any clarification sought by the prospective Bidder shall be submitted within the time
specified in the Bid Schedule through the prescribed mode.
2. The Employer may issue Clarifications, Corrigenda or Addenda at any time before the
deadline for submission of Bids.
3. All Corrigenda, Addenda and Clarifications issued by the Employer shall form an integral
part of the Tender Document and shall be binding on all Bidders.
4. It shall be the sole responsibility of every Bidder to regularly visit the e-Tender Portal and
verify whether any Corrigendum, Addendum or Clarification has been issued before
submission of the Bid.
5. No separate communication shall be made individually to the Bidders regarding
Corrigenda or Addenda, unless otherwise decided by the Employer.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 11 | P a g e
SECTION 4: ELIGIBILITY CRITERIA & PRE-QUALIFICATION
4.1 General Eligibility
1. The Bidder shall be a Company incorporated under the Companies Act, 2013 or the
Companies Act, 1956, or a Limited Liability Partnership (LLP), Partnership Firm or
Proprietorship Firm legally registered under the applicable laws of India.
2. The Bidder shall possess a valid Electrical Contractor Licence issued by the Competent
Licensing Authority under the applicable provisions of the Indian Electricity Act, 2003 and
the Central Electricity Authority (Measures relating to Safety and Electric Supply)
Regulations, or any statutory amendment thereof. A self-attested copy of the valid
licence shall be submitted along with the Bid.
3. The Bidder shall possess a valid 'A' Class Electrical Registration and ‘AA’ Class Civil
Registration issued by the Competent Government Authority of the respective State,
wherever applicable, for execution, operation and maintenance of HT/LT Electrical
Installations. Documentary evidence shall be submitted along with the Bid.
4. The Bidder shall possess a valid Permanent Account Number (PAN), Goods and Services
Tax (GST) Registration, Employees' Provident Fund (EPF) Registration, Employees' State
Insurance Corporation (ESIC) Registration, Labour Licence and such other statutory
registrations, licences and approvals as may be required for execution of the Contract.
Electrical Licence shall be mandatory wherever applicable.
5. The Bid shall be signed by a person duly authorized to act on behalf of the Bidder. A valid
Power of Attorney, Board Resolution or Authorization Letter, as applicable, shall be
submitted along with the Bid.
6. The Bidder shall comply with all applicable Central Government, State Government and
Local Authority Acts, Rules, Regulations and statutory requirements governing the
execution of the Contract.
7. The Bidder shall submit all documents, certificates, declarations, affidavits and other
supporting information prescribed under this Section in accordance with Appendix–A
(List of Documents to be Submitted) forming part of the Tender Document. Failure to
submit any document specified in Appendix–A may render the Bid non-responsive and
liable for rejection. Submission of the documents listed in Appendix–A shall not, by itself,
constitute qualification of the Bidder, and the Employer reserves the right to verify the
authenticity and adequacy of all documents submitted.
8. Renewal of Registration: Where any Registration Certificate, License or Statutory
Approval has expired prior to the Bid Due Date, the Bidder may submit documentary
evidence confirming that renewal has been applied for before the Bid Due Date. The
renewed Registration Certificate shall be produced before issuance of the Letter of
Acceptance or Work Order failing which SCI shall have the right to reject the Bid.
9. Joint Venture: Joint Venture, Consortium or Association of Firms shall not be permitted
under this Tender. The limited MOU permitted solely for plant security guard services
under Clause 3.2 shall not be treated as a JV, Consortium or Association, and the Bidder
shall remain the sole contracting party fully responsible for the Contract.
10. Conflict of Interest: The Bidder shall disclose any relationship, common ownership,
common Directors or controlling interest with any other Bidder participating in this
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 12 | P a g e
Tender. If SCI is satisfied that a Conflict of Interest exists which may affect fair
competition, SCI may reject the Bid.
11. Local Establishment / Emergency Response Capability: The bidder shall have an
established office/establishment or leased premises within a radius of 25 km from CETP
Sarigam Estate to ensure prompt mobilization and availability of its technical team at site
in case of any emergency, breakdown or operational requirement, including during day
and night hours.
12. Experience in Operation & Maintenance of Electrical Systems: The bidder shall have
successfully completed Operation & Maintenance (O&M) and Repair during the last
years of at least one 11 kV Sub-Station having a minimum total capacity of 2,500 kVA DG
Set(s) and an aggregate transformer capacity of 6,000 kVA.
4.2 Technical Eligibility (Work Experience Criteria)
The Bidder shall have successfully completed similar works during the prescribed eligibility
period and shall satisfy any one of the following criteria:
a) One (01) similar work of Comprehensive Operation, Maintenance & Repair (O&M&R) of a
Common Effluent Treatment Plant (CETP) treating heterogeneous industrial wastewater,
including Civil, Mechanical, Electrical, Instrumentation, Automation, PLC-SCADA
System, Online Continuous Effluent Monitoring System (OCEMS), Laboratory Operations
and allied systems, having an updated completion cost of not less than Eighty Percent
(80%) of the Estimated Tender Value.
b) Two (02) similar works of Comprehensive Operation, Maintenance & Repair (O&M&R) of
a Common Effluent Treatment Plant (CETP) treating heterogeneous industrial
wastewater, including Civil, Mechanical, Electrical, Instrumentation, Automation, PLC-
SCADA System, Online Continuous Effluent Monitoring System (OCEMS), Laboratory
Operations and allied systems, each having an updated completion cost of not less than
Fifty Percent (50%) of the Estimated Tender Value.
c) Three (03) similar works of Comprehensive Operation, Maintenance & Repair (O&M&R) of
a Common Effluent Treatment Plant (CETP) treating heterogeneous industrial
wastewater, including Civil, Mechanical, Electrical, Instrumentation, Automation, PLC-
SCADA System, Online Continuous Effluent Monitoring System (OCEMS), Laboratory
Operations and allied systems, each having an updated completion cost of not less than
Forty Percent (40%) of the Estimated Tender Value.
Definition of Similar work:
For the purpose of this Tender, "Similar Work" shall mean Comprehensive Operation,
Maintenance & Repair (O&M&R) of a Common Effluent Treatment Plant
(CETP) treating heterogeneous/mixed industrial (cocktail) effluent, executed under a single
contract, and comprising operation and maintenance of the complete treatment system
including, but not limited to:
1. Equalization Tank(s), Primary Treatment Units and Chemical Dosing System.
2. Biological Treatment System consisting of full-fledged Aeration Tank(s), Secondary
Clarifier(s), RAS/WAS System and Blowers.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 13 | P a g e
3. Advanced Tertiary Treatment System comprising Activated Carbon Filter (ACF), Pressure
Sand Filter (PSF)and/or Dual Media Filter (DMF).
4. Sludge Handling System including Filter Press and/or Volute Screw Press, Sludge
Transfer Pumps and associated equipment.
5. Complete Mechanical, Electrical and Instrumentation Systems including HT/LT
Electrical Network, Transformer, DG Sets, MCC/PCC Panels, Capacitor Banks and all
associated equipment.
6. Complete Automation System including PLC, SCADA, and Online Continuous Effluent
Monitoring System (OCEMS) integrated with statutory authorities.
7. In-house Laboratory Operations including routine analysis, process monitoring and
statutory compliance.
8. Marine Disposal System and/or Marine Outfall Pipeline for disposal of treated effluent.
The Similar Work must have been executed in a CETP treating mixed industrial effluent generated
from multiple member industries.
The following shall not be considered as Similar Work:
Municipal Sewage Treatment Plants (STP)
Water Treatment Plants (WTP)
Water Supply Schemes
Industrial Captive ETPs of a single industry
Domestic Sewage Pumping Stations
Any plant not treating heterogeneous (cocktail) industrial wastewater from multiple
4.3 Financial Eligibility Criteria
4.3.1 Average Annual Turnover
The Bidder shall have achieved an average annual turnover of not less than Fifty Percent (50%)
of the Estimated Tender Value during the last three (03) completed financial years immediately
preceding the Bid Due Date.
The Bidder shall submit a Turnover Certificate duly certified by a Chartered Accountant together
with copies of the audited financial statements.
4.3.2 Net Worth
The Bidder shall have a positive Net Worth as on the last day of the immediately preceding
financial year.
A Net Worth Certificate duly certified by a Chartered Accountant shall be submitted along with
4.3.3 Bank Solvency
The Bidder shall submit a valid Bank Solvency Certificate issued by a Nationalized Bank or
Scheduled Commercial Bank for an amount not less than Twenty Percent (20%) of the
Estimated Tender Value.
The Solvency Certificate shall not be older than twelve (12) months from the Bid Due Date.
4.3.4 Audited Financial Statements
The Bidder shall submit audited Balance Sheets, Profit & Loss Accounts and Auditor's Reports
for the last three (03) completed financial years.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 14 | P a g e
4.3.5 Financial Capability
The Bidder shall demonstrate adequate financial capacity, liquidity and resources to
successfully execute the Contract. Sarigam Clean Initiative reserves the right to seek additional
financial information, clarifications or supporting documents for assessment of the Bidder's
financial capability.
4.3.6 Enhancement of Past Work Value and Available Bid Capacity (ABC)
4.3.6.1 Enhancement of Past Work Value
For the purpose of calculation of Available Bid Capacity (ABC), the value of Similar Works
executed in any one financial year shall be updated to the Base Year by applying the
corresponding enhancement factor specified below.
The Base Year shall be the Financial Year in which this Tender is invited. The value of Similar
Works executed in each preceding financial year shall be multiplied by the applicable
enhancement factor to arrive at its updated value for evaluation purposes.
The following cumulative enhancement factors shall be applied:
Financial Year Enhancement Factor
2026–2027 (Base Year)
4.3.6.2 Available Bid Capacity (ABC)
The Bidder shall demonstrate that it possesses adequate Available Bid Capacity to undertake the
work. The Available Bid Capacity (ABC) shall be calculated as follows:
ABC = (A*N*2)-B
Symbol Description
A Maximum value of Similar Works executed in any one financial year during the last
five (5) financial years, updated to the Base Year by applying the prescribed
enhancement factors.
N Number of years prescribed for completion of the work under this Tender. Where
the stipulated completion period is less than one (1) year, N shall be taken as 1.00.
2 Capacity multiplier.
B Value of the Bidder's existing commitments and ongoing works to be completed
during the stipulated completion period of the present contract, duly supported by
Work Orders/Completion Certificates/Client Certificates.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 15 | P a g e
4.3.6.3 Eligibility
The Available Bid Capacity (ABC) of the Bidder shall be equal to or greater than the Estimated
Contract Value of the work for which the Bid is submitted.
If the Available Bid Capacity (ABC) is less than the Estimated Contract Value, the Bid shall be
treated as non-responsive and shall be rejected.
4.3.6.4 Documents to be Submitted
The Bidder shall submit the following documents in support of the Available Bid Capacity
1. Details of the maximum value of Similar Works executed during the last five (5) financial
2. Details of all existing commitments and ongoing works, indicating the balance value to
be executed during the stipulated completion period.
3. Copies of Work Orders, Completion Certificates and/or Client Certificates supporting the
above information.
4. A certificate duly signed by the Authorized Signatory of the Bidder and the Statutory
Auditor/Chartered Accountant certifying the correctness of the Available Bid Capacity
4.3.6.5 Disclosure of Existing Commitments
The Bidder shall disclose all ongoing contracts, awarded works, Letters of Acceptance, Letters
of Intent and contractual commitments in Appendix-E.
Suppression, concealment or misrepresentation of any existing commitment shall constitute
fraudulent practice and shall result in rejection of the Bid, forfeiture of Earnest Money Deposit
and such further action as SCI may deem appropriate.
4.3.6.6 False Declaration
If, at any stage of the tender process or during execution of the Contract, any information
furnished by the Bidder relating to the Available Bid Capacity is found to be false, misleading,
suppressed, or materially incorrect, SCI shall have the right, without prejudice to any other rights
or remedies available under the Contract or applicable law, to:
Reject the Bid as non-responsive;
Forfeit the Earnest Money Deposit (EMD) and/or Performance Security, as applicable;
Terminate the Contract, if already awarded;
Recover all consequential losses and damages suffered by SCI; and
Debar the Bidder from participating in future tenders of SCI for such period as SCI may
deem appropriate.
The decision of SCI in this regard shall be final and binding upon the Bidder.
4.3.6.7 Abnormally Low Bid (ALB)
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 16 | P a g e
If the quoted Bid Price is considered abnormally low in comparison with the Estimated Tender
Value or other substantially responsive Bids, SCI may seek written justification from the Bidder.
If the justification is found unsatisfactory, SCI reserves the right to reject such Bid. The Bidder
shall not be entitled to any additional payment on account of acceptance of such Bid.
4.4 Blacklisting / Debarment Declaration
1. The Bidder shall not have been blacklisted, debarred, suspended, banned, declared non-
performing, placed under holiday listing or otherwise prohibited from participating in
tenders by any Government Department, Government Agency, Gujarat Pollution Control
Board (GPCB), Central Pollution Control Board (CPCB), Gujarat Industrial Development
Corporation (GIDC), Municipal Corporation, Public Sector Undertaking (PSU), Common
Effluent Treatment Plant (CETP)/Special Purpose Vehicle (SPV), Statutory Authority,
Regulatory Authority or any Court of Law during the last five (05) years preceding the Bid
2. The Bidder shall submit a duly notarized Affidavit on Non-Judicial Stamp Paper of ₹300/-
confirming the above declaration.
3. In the event that any information furnished by the Bidder is found to be false, incorrect,
suppressed or misleading at any stage of the tendering process or during the Contract
Period, Sarigam Clean Initiative shall have the right to reject the Bid, terminate the
Contract, forfeit the Earnest Money Deposit (EMD) and/or Performance Security and take
such further action as deemed appropriate under the applicable laws and the provisions
of the Tender Document.
4. Bids submitted by Bidders against whom any order of blacklisting, debarment,
suspension or holiday listing is in force on the Bid Due Date shall be summarily rejected.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 17 | P a g e
SECTION – 5: BID SUBMISSION REQUIREMENTS
5.1 MANDATORY DOCUMENTS
The Bidder shall upload legible scanned copies of the following documents along with the Pre-
Qualification Application and Technical Bid. Failure to submit any of the mandatory documents,
wherever applicable, may render the bid non-responsive and liable for rejection.
A. Statutory and Registration Documents
1. Valid Contractor Registration Certificate of the appropriate class/category.
2. Valid Electrical Contractor License issued by the competent authority.
3. Permanent Account Number (PAN) Card.
4. GST Registration Certificate.
5. Employees Provident Fund (EPF) Registration Certificate along with latest challan.
6. Employees State Insurance Corporation (ESIC) Registration Certificate along with latest
7. Labour License, wherever applicable.
8. MSME/Udyam Registration Certificate, if applicable.
9. Tender Fee payment proof.
10. Earnest Money Deposit (EMD) payment proof.
B. Financial Documents
11. Audited Balance Sheets and Profit & Loss Accounts for the last three financial years.
12. Income Tax Returns (ITR) along with acknowledgement for the last three financial years.
13. Fresh and Valid Bank Solvency Certificate issued during the current financial year for the
amount specified in the Qualification Criteria.
14. CA Certificate for Average Annual Financial Turnover (last 3 financial years), if turnover is
an eligibility criterion.
C. Technical and Experience Documents
15. Similar Work Completion Certificates as required under the Qualification Criteria.
16. Work Orders/Agreements supporting the claimed experience.
17. Performance Certificates/Satisfactory Completion Certificates issued by clients.
18. Details of ongoing works, if required under the Qualification Criteria.
D. Legal and Organizational Documents
19. Power of Attorney or Authorization Letter in favour of the person signing the bid.
20. Partnership Deed (for Partnership Firms), Memorandum & Articles of Association (for
Companies), or other constitutional documents as applicable.
21. Affidavit regarding Non-Blacklisting by any Government Department, Public Sector
Undertaking, Local Authority, GIDC, SCI or any statutory body.
22. Affidavit regarding Conflict of Interest.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 18 | P a g e
23. Signed Tender Document on each page as token of acceptance of all terms and
24. Declaration regarding correctness and authenticity of information/documents
25. Undertaking that the bidder has inspected the site and understood the scope of work.
26. Undertaking that the bidder is not under liquidation, insolvency or bankruptcy
27. Any other document specifically required under this Tender Document.
The Tender Inviting Authority reserves the right to seek clarification, additional information, or
original documents for verification at any stage of the tender process. Submission of false,
misleading, forged or incomplete documents shall result in rejection of the bid and may lead to
further action as deemed appropriate by the Tender Inviting Authority.
In addition to the documents specified herein, the Bidder shall also submit all documents
required under the Eligibility Criteria and Appendix-A. Non-submission of any mandatory
document or eligibility document shall render the bid liable for rejection.
The Bidder shall upload clear, legible and complete colour scanned copies of all documents
required to be submitted under this Tender Document along with the Pre-Qualification
Application and Technical Bid. The scanned copies shall be of sufficient quality to clearly display
the original document, including the text, signatures, seals, stamps, photographs, security
features and other relevant particulars, wherever applicable. Black-and-white, monochrome or
grey-scale scanned copies shall not be accepted. Documents uploaded in an illegible,
incomplete, tampered or otherwise non-verifiable form shall be liable to be treated as non-
responsive and may result in rejection of the Bid.
Where any document, affidavit, undertaking, declaration, authorization, agreement, MOU or
other document is required to be notarized under this Tender Document, the same shall be duly
notarized and the notarial stamp/seal, name of the Notary Public, registration/serial number and
date of notarization shall be clearly visible.
SCI reserves the right to call for the original documents at any stage of the tender process or
during execution of the Contract for verification. Failure to produce the original document when
called for, or any discrepancy between the original and the submitted scanned copy, shall render
the Bid/Contract liable for appropriate action as per the Tender Conditions.
5.2 Online Submission of Bid
The Bidder shall submit the following documents through the e-tender portal only:
Pre-Qualification Application along with all supporting documents.
Technical Bid.
Financial Bid.
Scanned copy of EMD Instrument.
Scanned copy of Tender Fee Instrument.
Scanned copies of all documents required under the tender.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 19 | P a g e
The Bidder may prepare, modify and upload the bid any number of times before the prescribed
bid submission date and time. After the expiry of the bid submission deadline, no modification,
alteration or withdrawal of the submitted bid shall be permitted.
All documents shall be digitally signed by the authorized signatory of the Bidder. Bids not digitally
signed shall be liable for rejection.
Submission of Pre-Qualification Application, Technical Bid and Financial Bid in physical form
shall not be accepted under any circumstances.
The Bidder shall be solely responsible for regularly checking and considering all corrigenda,
amendments, clarifications and addenda issued on the e-tender portal up to the last date and
time of bid submission and before final submission of the bid.
Any bid or document received after the prescribed date and time shall not be accepted and such
bid shall be treated as non-responsive.
5.3 Physical Submission of Original Documents
For verification, only the following original payment instruments, wherever applicable, shall be
submitted at the office of SCI:
Chief Executive Officer
Sarigam Clean Initiative
Sarigam Manda Road, Sarigam GIDC, Sarigam
(a) Original Earnest Money Deposit (EMD) instrument, where EMD is submitted through DD / FDR
/ Bank Guarantee; and (b) original Tender Document Fee instrument, where the fee is paid
through Demand Draft. Where payment is made online, the corresponding UTR / e-payment
acknowledgement shall be uploaded and no physical original payment instrument shall be
required. These documents shall be submitted by hand delivery within the period specified in the
All other supporting documents shall be uploaded online in the prescribed manner. SCI may, at
any stage, call for any original document for verification, and the Bidder shall produce the same
within the time specified by SCI.Failure to submit the required original documents within the
stipulated time shall render the bid liable for rejection and the bid shall be considered non-
Sarigam Clean Initiative shall not be responsible for any delay, loss or non-receipt of documents
due to postal, courier or any other agency.
5.4 Rejection of Bid
Is not submitted through the prescribed e-tender portal;
Is not digitally signed;
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 20 | P a g e
Does not contain the required documents;
Fails to submit original documents for verification within the prescribed period; or is
received after the stipulated date and time, shall be rejected and treated as a non-
responsive bid.
SECTION – 6: EVALUATION OF PRE-QUALIFICATION APPLICATIONS
The Pre-Qualification Applications received against this Tender shall be examined and evaluated
by SCI to determine the eligibility and responsiveness of the Bidders in accordance with the
Eligibility Criteria, Qualification Requirements and other provisions of this Tender Document.
Only those Bidders who satisfy all the prescribed Eligibility Criteria and submit all the required
documents shall be considered technically qualified for further evaluation.
6.2 Evaluation Committee
For the purpose of evaluation of the Pre-Qualification Applications, SCI shall constitute an
Evaluation Committee comprising the following members:
Sr. No. Designation Role
1 Chief Engineer Chairman
2 Chief Executive Officer (CEO), SCI Member
3 Director of SCI Member
4 Nominee Director of SCI Member
5 Nominee Director of SCI Member
The Evaluation Committee shall scrutinize the Pre-Qualification Applications, verify the
documents submitted by the Bidders and evaluate the eligibility of the Bidders in
accordance with the provisions of this Tender Document.
SCI reserves the right to modify, reconstitute or substitute the Evaluation Committee, if
considered necessary, without assigning any reason.
6.3 Scrutiny of Applications
The Evaluation Committee shall examine the applications to verify that:
The Bid has been submitted within the prescribed time;
All mandatory documents have been submitted;
The Bid is complete in all respects;
The Bidder satisfies the prescribed Eligibility Criteria;
The information furnished by the Bidder is complete and consistent; and
There are no material deviations from the requirements of the Tender Document.
Incomplete applications or applications containing material deviations may be treated as non-
6.4 Verification of Documents
SCI may, at its discretion:
Verify the authenticity of any document submitted by the Bidder;
Seek clarification or additional supporting documents;
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 21 | P a g e
Verify work experience from the concerned Client;
Inspect completed or ongoing project sites, if considered necessary;
Verify financial credentials from the issuing authorities; and
Verify any information furnished by the bidder from any government department,
statutory authority, client or other reliable source.
Submission of clarification or additional documents shall not confer any right upon the
Bidder for qualification.
6.5 Responsiveness of Bid
A Pre-Qualification Application shall be considered Responsive only if:
It complies with all requirements of the Tender Document;
The Bidder fulfils all Eligibility and Qualification Criteria;
All mandatory documents have been submitted;
The information furnished is true, complete and verifiable; and
No material deviation, reservation or condition adversely affecting the Tender
requirements is observed.
6.6 Grounds for Disqualification
Without prejudice to any other provision of this Tender Document, SCI may reject or disqualify a
The Bidder fails to satisfy the Eligibility Criteria;
Mandatory documents are not submitted;
False, forged, misleading or fabricated information or documents are submitted;
The Bid contains material deviations from the Tender requirements;
The Bidder attempts to influence the evaluation process;
The Bidder is found to have concealed any material information affecting its eligibility;
The Bidder is declared ineligible under any provision of this Tender Document; or
Any other circumstance exists which, in the opinion of SCI, materially affects the Bidder's
eligibility or capability to execute the Contract.
6.7 Clarifications
SCI may seek clarifications from any Bidder regarding the documents submitted.
The Bidder shall furnish the required clarification within the time specified by SCI, failing
which the Bid may be evaluated on the basis of the documents already available or may
Seeking clarification shall not permit the Bidder to alter, modify or improve its original Bid.
6.8 Decision of SCI
The Evaluation Committee shall evaluate the Pre-Qualification Applications and submit
its recommendations to the Competent Authority of SCI.
The decision of SCI regarding qualification, disqualification, acceptance or rejection of
any Pre-Qualification Application shall be final and binding on all Bidders.
No correspondence, representation, explanation or claim in this regard shall be
entertained by SCI.
6.9 Powers of Evaluation Committee/Right of SCI
SCI reserves the right to verify all documents submitted by the Bidder including
experience certificates, turnover certificates, solvency certificates, work orders,
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 22 | P a g e
completion certificates, statutory registrations, client references and any other
information considered necessary.
The Evaluation Committee may seek clarifications, inspect completed projects, contact
previous Employers, Banks, Chartered Accountants or Government Authorities.
Failure to furnish clarification or cooperate during verification shall render the Bid liable
SCI reserves the right to accept or reject any or all Pre-Qualification Applications, to annul
the Tender process, or to reject all Applications at any stage without assigning any reason
whatsoever, and without thereby incurring any liability to the affected Bidder(s).
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 23 | P a g e
SECTION – 7: SPECIAL CONDITIONS OF CONTRACT (SCC)
The following Special Conditions of Contract (SCC) shall be read in conjunction with the General
Conditions of Contract (GCC), Scope of Work and other provisions of this Tender Document. In
case of any conflict or inconsistency, the provisions of these Special Conditions shall prevail to
the extent of such inconsistency.
7.1 Pre-Bid Meeting
SCI may, if considered necessary, convene a Pre-Bid Meeting. The date, time, venue or online
meeting details, if any, shall be notified through the e-Tender Portal / corrigendum. Attendance
at such meeting shall not be mandatory unless specifically stated in the relevant notice. The
mandatory Site Visit and submission of Site Visit Certificate shall be governed by Clause 3.3 of
this Tender Document.
7.2 Compliance with GPCB Consent Conditions
The Contractor shall operate, maintain and repair the CETP in such a manner that the treated
effluent consistently complies with the Consent Conditions issued by the Gujarat Pollution
Control Board (GPCB) and all other applicable environmental laws, rules, standards and
directions issued by the Competent Authorities from time to time.
7.3 Operation and Maintenance of Automation Systems
The Contractor shall be responsible for the operation, maintenance, calibration, troubleshooting
and upkeep of all PLC-SCADA Systems, Online Continuous Effluent Monitoring Systems
(OCEMS), field instrumentation, sensors, analysers, communication systems and all associated
automation equipment throughout the Contract Period.
7.4 Deployment of Qualified Manpower
The Contractor shall deploy adequate numbers of qualified, experienced and competent
technical personnel, engineers, chemists, operators, electricians, fitters, instrumentation
personnel, laboratory staff and other manpower as specified in the Scope of Work. Replacement
of key personnel shall be made only with personnel possessing equivalent or higher
qualifications and experience, subject to the approval of SCI wherever applicable.
7.5 Compliance with Statutory Requirements
The Contractor shall comply with all applicable provisions of the Labour Laws, EPF Act, ESIC Act,
Contract Labour (Regulation & Abolition) Act, Minimum Wages Act, Factories Act, Electricity Act
and Rules, Environmental Laws, Safety Regulations and all other statutory requirements in force
from time to time. The Contractor shall solely be responsible for obtaining, maintaining and
renewing all statutory registrations, licences and approvals required for execution of the
Contract. Any liability, penalty, damages or legal consequences arising out of non-compliance
shall be borne exclusively by the Contractor.
7.6 False Information and Misrepresentation
If at any stage of the tender process or during execution of the Contract any information,
declaration, certificate or document submitted by the Bidder is found to be false, forged,
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 24 | P a g e
misleading or materially incorrect, SCI shall have the right to reject the Bid, cancel the Letter of
Acceptance (LOA)/Work Order or terminate the Contract, without prejudice to any other legal or
contractual remedies available under law.
7.7 Commencement of Contract
Notwithstanding anything contained elsewhere in this Tender Document, the successful Bidder
may be selected through the tender process and may be issued the Letter of Acceptance (LOA)
and/or Work Order; however, the actual commencement of the Comprehensive Operation,
Maintenance & Repair (O&M&R) Contract for the 25 MLD Common Effluent Treatment Plant
(CETP) shall be effective from 22.04.2027 or from the date of formal handing over of the
MLD CETP by SCI, whichever is later, and only upon written instructions issued by SCI. The
Contractor shall commence the O&M&R activities strictly from the date and as per the
instructions communicated by SCI. Issuance of the LOA or Work Order alone shall not authorize
the Contractor to commence the O&M&R activities.
No payment, mobilisation advance, mobilisation charges, establishment charges, idle
manpower charges, overhead expenses, compensation, escalation, loss of profit, interest,
damages or any other financial claim whatsoever shall be admissible or payable by SCI for the
period prior to the actual commencement of the Contract.
The Bidder shall be deemed to have fully understood and accepted the above arrangement while
submitting its Bid and shall not raise any claim, dispute or demand arising out of the deferred
commencement of the Contract or delay in handing over the Plant.
The Contract Period shall be reckoned only from the actual date of commencement of the
Contract as certified in writing by SCI and shall not be calculated from the date of issue of the
Letter of Acceptance (LOA), Work Order or execution of the Agreement.
SCI reserves the right to defer the commencement of the Contract in the event of delay in
completion, commissioning, testing, trial run or formal handing over of the 25 MLD CETP or due
to any administrative, statutory, technical or operational reasons. Such deferment shall not
entitle the Contractor to any extension of financial benefits, compensation, damages or
additional claims of any nature whatsoever.
7.8 No Extra Claim
The Contractor shall be deemed to have included in the Contract Price the cost of all manpower,
tools, tackles, lifting equipment, vehicles, machinery, consumables, safety equipment and all
other resources required for proper execution of the Contract. No additional payment or
compensation shall be admissible on any such account.
7.9 Handover–Takeover
Upon expiry or termination of the Contract, the Contractor shall hand over the complete CETP,
machinery, equipment, records, tools provided by SCI and all associated facilities in good
operating condition, fair wear and tear excepted. All pending defects, deficiencies and
incomplete works shall be rectified by the Contractor before issuance of the Final Completion
Certificate by SCI.
7.10 Major Repairs and Replacement
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 25 | P a g e
The Contractor shall be responsible for carrying out all routine, preventive, predictive and
breakdown maintenance of the entire CETP and Final Pumping Station and shall provide all
labour, tools, tackles, consumables, minor spares and maintenance materials necessary for
satisfactory operation of the Plant.
Any major repair, complete replacement of equipment, major civil rehabilitation, structural
strengthening, capital repair, capacity augmentation, modernization or procurement of new
equipment, including but not limited to complete replacement of pumps, motors, blowers,
transformers, DG Sets, PLC/SCADA hardware, major electrical panels, clariflocculators, filter
presses or any other capital asset, shall be carried out by SCI at its own discretion and cost.
However, where any such major repair or replacement becomes necessary due to the
Contractor's negligence, improper operation, misuse, lack of preventive maintenance, failure to
carry out timely maintenance, non-compliance with the manufacturer's recommendations or
any breach of the Contract, the Contractor shall be fully responsible for the cost of repair or
replacement. SCI shall be entitled to recover such cost from the Contractor from any amount
due under the Contract, including Performance Security, Security Deposit or any other monies
payable to the Contractor, without prejudice to any other rights and remedies available under the
7.11 Performance Verification
SCI reserves the right to inspect any existing or completed project executed by the Bidder for
assessing actual performance before award of the Contract.
7.12 No Correspondence
No correspondence, representation or request regarding the evaluation process, qualification,
disqualification or comparative assessment shall be entertained after submission of the Bid
except where clarification is specifically sought by SCI.
7.13 Cost of Bidding
The Bidder shall bear all costs associated with preparation, submission and participation in the
Tender Process. SCI shall not be liable for reimbursement of any such costs irrespective of the
outcome of the Tender.
7.14 Fraud & Corrupt Practices
If the Bidder or Contractor is found to have submitted false documents, made misleading
statements, engaged in fraudulent, corrupt or collusive practices during the Tender Process or
Contract Period, SCI shall have the right to reject the Bid, terminate the Contract, forfeit the EMD
and/or Performance Security and initiate appropriate legal action.
7.15 Termination for Default
SCI may terminate the Contract by written notice if the Contractor fails to perform the Contract,
repeatedly defaults in its obligations, abandons the Work or commits any material breach of the
Contract. Such termination shall be without prejudice to any other rights or remedies available
7.16 Environmental Damage Liability
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 26 | P a g e
Any environmental damage, pollution, statutory penalty or liability arising due to the Contractor's
negligence, default or non-compliance with applicable laws or Consent Conditions shall be
solely borne by the Contractor and may be recovered by SCI.
7.17 Breakdown Response Time
The Contractor shall attend all equipment breakdowns immediately and restore normal
operation within the time specified by SCI depending upon the criticality of the equipment.
Failure to do so may attract appropriate action under the Contract.
7.18 Governing Law & Jurisdiction
This Tender and the Contract shall be governed by the laws of India. Subject to the Arbitration
provisions of the Contract, the Courts at Valsad, Gujarat shall have exclusive jurisdiction over all
matters arising out of or relating to this Tender and the Contract. The Sole Arbitrator shall be
appointed by mutual consent of SCI and the Contractor. In the event the parties fail to mutually
agree upon the appointment within thirty (30) days, the appointment shall be made in
accordance with the provisions of the Arbitration and Conciliation Act, 1996, as amended from
7.19 Entire Agreement
The Tender Document, Corrigenda, Letter of Acceptance, Work Order and the executed
Agreement shall constitute the entire Contract between SCI and the Contractor. No verbal
understanding or prior communication shall have any contractual effect unless made in writing
7.20 Right of Recovery / Set-off
SCI shall have the right to recover any amount payable by the Contractor under the Contract from
any payment, Running Account Bill, Security Deposit, Performance Security or any other amount
due to the Contractor without prejudice to any other legal remedy available to SCI.
7.21 Invocation of Performance Bank Guarantee
Without prejudice to any other rights or remedies available under the Contract, SCI shall have
the unconditional right to invoke and encash the Performance Bank Guarantee, either wholly or
partly, in the event of the Contractor's default, failure to perform the Contract, breach of any
contractual obligation, abandonment of work, non-compliance with statutory requirements, or
failure to remedy any defect or deficiency within the time specified by SCI. Invocation of the
Performance Bank Guarantee shall not prejudice SCI's right to recover any further loss or damage
suffered by it.
The Contractor shall indemnify, defend and keep indemnified SCI, its Directors, Officers and
Employees against all claims, demands, actions, proceedings, losses, damages, liabilities,
penalties, costs and expenses arising out of or in connection with the Contractor's negligence,
breach of the Contract, violation of any statutory provisions, injury or death of any person,
damage to property or environmental pollution caused during execution of the Contract. The
obligations under this Clause shall survive the expiry or termination of the Contract.
7.23 Risk & Cost
If the Contractor fails to perform any part of the Contract or fails to rectify any deficiency within
the time specified by SCI, SCI shall have the right to execute such work through any other agency
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 27 | P a g e
at the risk and cost of the Contractor. Any additional expenditure incurred by SCI shall be
recoverable from the Contractor from the Running Account Bills, Security Deposit, Performance
Bank Guarantee or any other amount payable to the Contractor, without prejudice to any other
rights and remedies available under the Contract. SCI may also recover such amount as arrears
of contract dues.
7.24 Dispute Resolution & Arbitration
Any dispute or difference arising out of or in connection with this Tender or the Contract shall, in
the first instance, be resolved amicably through mutual discussions between SCI and the
Contractor. Failing such settlement within thirty (30) days, the dispute shall be referred to a Sole
Arbitrator to be appointed in accordance with the provisions of the Arbitration and Conciliation
Act, 1996, as amended from time to time. The arbitration shall be conducted by a Sole Arbitrator
appointed by SCI with the consent of the Contractor. The seat and venue of arbitration shall
be Valsad, Gujarat, and the proceedings shall be conducted in the English language. The award
of the Arbitrator shall be final and binding upon both parties.
7.25 EXTENSION OF CONTRACT
1. The initial Contract Period shall be Twenty-Four (24) Months from the actual date of
commencement of the Contract.
2. Subject to satisfactory performance of the Contractor and compliance with all
contractual, statutory, environmental and performance requirements, SCI may, at its
sole discretion, extend the Contract for a further period of up to Two (02) Years.
3. Upon completion of the initial Contract Period and the above extension period, SCI may
further extend the Contract for such additional period(s) as may be considered necessary
in the interest of uninterrupted operation of the CETP, subject to satisfactory
performance of the Contractor and approval of the Board of Directors of SCI.
4. All extensions, including any further extensions beyond the initial four (04) years, shall be
on the same rates, terms and conditions as applicable under the original Contract,
without any escalation or increase in rates.
5. Any extension shall be subject to prior written approval and issuance of a formal
extension order by SCI. No extension shall be automatic, and the Contractor shall have
no vested right to claim any extension or revision in rates.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 28 | P a g e
SECTION 8: PROJECT OVERVIEW & EXISTING FACILITIES
8.1 About Sarigam Clean Initiative (SCI)
Sarigam Clean Initiative (SCI) is a Section 8 Company incorporated under the provisions of the
Companies Act, 2013, with the primary objective of planning, developing, operating, maintaining
and managing the Common Effluent Treatment Plant (CETP) and associated environmental
infrastructure for GIDC Sarigam Industrial Estate, District Valsad, Gujarat. SCI functions as the
Special Purpose Vehicle (SPV) responsible for ensuring environmentally sound collection,
treatment, monitoring and disposal of industrial wastewater generated by the member industries
of the estate in accordance with the applicable environmental laws, statutory requirements and
directions issued by the Gujarat Pollution Control Board (GPCB), Central Pollution Control Board
(CPCB) and other competent authorities.
8.2 Project Overview
The Common Effluent Treatment Plant (CETP) is located at GIDC Sarigam Industrial Estate,
Taluka Umbergaon, District Valsad, Gujarat, and has been established to provide centralized
collection, treatment and environmentally safe disposal of heterogeneous industrial wastewater
generated by the member industries of the estate. The CETP plays a vital role in ensuring
compliance with applicable environmental regulations and facilitating sustainable industrial
development within the estate.
The CETP is designed and operated to receive industrial effluent from member industries through
the common collection network, treat the wastewater to the prescribed standards and discharge
the treated effluent through the approved marine disposal system in accordance with the
prevailing Consent to Establish/Operate and Authorization granted by the Gujarat Pollution
Control Board (GPCB). The plant is also equipped with laboratory facilities, PLC-SCADA based
automation, Online Continuous Effluent Monitoring System (OCEMS), sludge handling facilities
and other supporting infrastructure required for efficient operation and regulatory compliance.
8.3 Plant Details
Particulars Details
CETP Capacity 25 MLD
Location GIDC Sarigam Industrial Estate
Disposal System Existing Marine Disposal Pipeline
Treatment Process Physico-Chemical, Biological and Tertiary Treatment
Monitoring System PLC-SCADA, Online Monitoring System and Laboratory Facilities
8.4: Existing Treatment Facilities
The CETP consists of:
Collection Sump & Pump House
Screening System
Grit Removal System
Oil & Grease Removal System
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 29 | P a g e
Equalization Tanks
Neutralization System
Clariflocculators
Aeration Tanks
Secondary Clarifiers
Sludge Thickening System
Filter Press / Screw Press
Tertiary Treatment System
Pressure Sand Filters
Activated Carbon Filters
Final Pumping Station
Marine Disposal Pipeline
PLC-SCADA System
Online Monitoring Instruments
Details of existing facilities, machinery, equipment and systems covered under scope of 25 MLD
Description of Facility / Equipment / System Qty.
1 Inlet Collection & Receiving System 2 Set
2 Screening System (Mechanical / Manual) 2 Set
3 Grit Removal System 2 Set
4 Oil & Grease Removal System including oil schemer 2 Set
5 Equalization System including Tanks, Mixers & Accessories 2 Set
6 Transfer Pumping System Complete
7 Primary Treatment System 2 Set
8 Primary Settling Tanks (PST) with Scraper Mechanism Complete
9 Aeration System including Aerators / Blowers and Accessories Complete
10 Secondary Settling Tanks (SST) with Scraper Mechanism Complete
11 Return Activated Sludge (RAS) System Complete
12 Waste Activated Sludge (WAS) System Complete
13 Sludge Thickening System Complete
14 Sludge Transfer Pumps Complete
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 30 | P a g e
Description of Facility / Equipment / System Qty.
15 Filter Press / Sludge Dewatering System Complete
16 Chemical Preparation & Dosing System Complete
17 Tertiary Treatment System Complete
18 Treated Effluent Collection & Disposal System Complete
19 Deep Sea Disposal Pipeline System Complete
20 Storage Sump & Receiving Sump Complete
21 Pumping Station System Complete
22 Non-Clog Submersible Pumps Complete
23 All Pumps, Motors, Gearboxes & Drives Complete
24 All Valves, Gates & Pipe Network Complete
25 Online Continuous Effluent Monitoring System (OCEMS) 1 Set
26 PLC Based Automation System 2 Set
27 SCADA System with Data Logging Facilities 2 Set
28 Flow Meters, Level Sensors, Pressure Sensors & Field Instruments Complete
29 Laboratory & Instrument Room 1 Set
30 Laboratory Testing Equipment & Instruments Complete
31 HT Electrical Installation 1 Set
32 HT Switchgear / VCB System 1 Set
33 Transformers Complete
34 DG Sets with AMF Panels Complete
35 PCC Panels Complete
36 MCC Panels Complete
37 APFC Panels Complete
38 Instrumentation Control Panels Complete
39 Battery Charger & Battery System Complete
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 31 | P a g e
Description of Facility / Equipment / System Qty.
40 LT Power Distribution System Complete
41 Internal & External Lighting System Complete
42 Earthing & Lightning Protection System Complete
43 Electrical Cables, Cable Trays & Accessories Complete
44 Administrative Building Complete
45 Laboratory Building Complete
46 Security Cabin & Security Infrastructure Complete
47 Internal Roads, Drains & Storm Water System Complete
48 Compound Wall, Gates & Ancillary Structures Complete
49 Green Belt, Landscaping & Garden Area Complete
50 Fire Fighting & Safety Systems Complete
51 Sewage / Effluent Pumping Stations (SPS/EPS) connected with CETP Complete
Any Other Existing Civil, Mechanical, Electrical, Instrumentation, Automation
or Utility Facilities forming part of the 25 MLD CETP System
1. The above list is indicative and not exhaustive. The Contractor shall be responsible for
Operation, Maintenance, Repair, Preventive Maintenance, Breakdown Maintenance and
upkeep of all facilities, machinery, equipment and systems associated with the 25 MLD
CETP and connected SPS/EPS facilities.
2. The Contractor shall be deemed to have inspected and verified all existing facilities,
equipment, capacities, ratings, quantities and operational conditions before submission
3. The mandatory site visit and submission of the Site Visit Certificate shall be governed by
Clause 3.3 of this Tender Document.
4. No claim whatsoever regarding quantity, capacity, rating, condition, accessibility,
operation, maintenance requirement or scope of work shall be entertained after
submission of the bid.
5. Any existing or future facility commissioned during the contract period and forming part
of the CETP system shall also be covered under the scope of Operation, Maintenance &
Repair without any additional claim unless otherwise approved by SCI-CETP.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 32 | P a g e
SECTION – 9: SCOPE OF WORK
9.1 General Scope
The Contractor shall be responsible for the comprehensive Operation, Maintenance & Repair
(O&M&R) of the 25 MLD Common Effluent Treatment Plant (CETP), Sarigam, including all Civil,
Mechanical, Electrical, Instrumentation, Automation, PLC-SCADA Systems, Online Continuous
Effluent Monitoring System (OCEMS), Laboratory, Sludge Handling & Management Facilities,
Pumping Stations, Utilities, Buildings and all associated infrastructure necessary for the
efficient, safe and uninterrupted operation of the CETP.
The scope of work shall include operation, preventive, predictive, routine and breakdown
maintenance, process optimization, laboratory operations, environmental monitoring, statutory
compliance, housekeeping, asset management, documentation, reporting and all allied
activities necessary for achieving the performance standards specified under this Tender
9.2 Operation of Treatment Facilities
The Contractor shall operate, maintain and repair all treatment facilities, including but not
Inlet Receiving Chamber and Screening System;
Equalization Tanks;
Primary Treatment Units;
Aeration System;
Secondary Clarifiers;
Tertiary Treatment Units;
Sludge Thickening and Dewatering Systems;
Filter Press / Volute Screw Press;
Chemical Preparation and Dosing Systems;
Pumping Stations;
Treated Effluent Disposal System;
PLC-SCADA System;
Online Continuous Effluent Monitoring System (OCEMS);
HT/LT Electrical Distribution System;
Electrical Substation;
Buildings, Roads, Drains, Greenbelt and all allied infrastructure.
9.3 Plant Operation & Process Control
The Contractor shall operate the CETP on a continuous 24 Hours × 365 Days basis and shall
optimize the treatment process to ensure efficient treatment of heterogeneous industrial
wastewater and continuous compliance with the Consent Conditions issued by the Gujarat
Pollution Control Board (GPCB) and other applicable statutory requirements.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 33 | P a g e
The Contractor shall continuously monitor hydraulic loading, organic loading, process
parameters, biological treatment performance, sludge characteristics, chemical dosing and all
operational parameters necessary for stable plant performance.
9.4 Operation, Maintenance & Repair of Plant and Equipment
The Contractor shall carry out preventive, predictive, routine, emergency and breakdown
maintenance of all Civil, Mechanical, Electrical, Instrumentation, Automation and Utility
Systems to ensure reliable, safe and uninterrupted operation of the CETP.
All equipment shall be maintained in healthy operating condition throughout the Contract Period
and any defect, failure or breakdown shall be attended promptly.
9.5 PLC-SCADA System, Instrumentation & OCEMS
The Contractor shall operate, maintain, calibrate, troubleshoot and keep functional all PLC-
SCADA Systems, Online Continuous Effluent Monitoring Systems (OCEMS), analyzers, sensors,
field instruments, communication systems and associated automation equipment.
The Contractor shall ensure uninterrupted connectivity and transmission of monitoring data to
the GPCB/CPCB servers in accordance with applicable statutory requirements.
9.6 Laboratory Operations
The Contractor shall operate and maintain the laboratory and carry out sampling, testing,
analysis, process monitoring and laboratory quality control in accordance with the requirements
of GPCB, CPCB and SCI.
All laboratory records, calibration records, analytical reports and process monitoring data shall
be maintained properly and submitted to SCI as prescribed.
9.7 Chemical Handling, Process Chemicals & Sludge Management
The Contractor shall arrange, procure, transport, store and use all treatment chemicals required
for the efficient operation of the CETP, including but not limited to Hydrated Lime, Poly
Aluminium Chloride (PAC), Polyelectrolyte, Sodium Hypochlorite, Activated Sand and Carbon,
Nutrients, Microbial Culture/MLSS Booster and any other chemicals as may be required to
achieve the prescribed treated effluent quality.
Actual consumption shall depend upon influent characteristics, hydraulic loading, pollutant
load, process performance and shall be as per the actual treatment requirement. No additional
payment shall be made of variation in consumption.
The Contractor shall be responsible for the collection, dewatering, handling, loading,
transportation and unloading of sludge, screenings, grit and other waste generated from the
CETP at the designated TSDF facility.
The TSDF disposal charges shall be borne by SCI. Transportation charges from CETP-Sarigam to
the designated TSDF facility shall be borne by the Contractor if the TSDF facility is located within
a distance of 25 km from CETP-Sarigam. If the designated TSDF facility is located beyond 25 km,
the transportation charges shall be borne by SCI, as applicable.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 34 | P a g e
9.8 Manpower Deployment
The Contractor shall deploy qualified, experienced and competent engineers, chemists,
supervisors, operators, electricians, fitters, instrumentation personnel, laboratory staff,
monitoring teams, security personnel (where applicable) and other manpower as specified in
The Contractor shall maintain the prescribed minimum manpower throughout the Contract
9.9 Housekeeping, Asset Maintenance & Plant Upkeep
The Contractor shall maintain all treatment units, buildings, roads, drains, laboratories, offices,
stores, electrical rooms, greenbelt and plant premises in neat, clean, safe and hygienic
Routine upkeep, cleaning and preservation of all assets shall form part of the Contractor's
9.10 Environmental Compliance, Monitoring & Reporting
The Contractor shall continuously monitor the performance of the CETP and undertake
sampling, testing, analysis, documentation and reporting in accordance with the minimum
sampling schedule specified in Appendix-K and the reporting formats specified in Appendix-N.
The Contractor shall maintain all operational records, statutory registers and submit Daily,
Weekly, Monthly, Half-Yearly and Annual Reports as prescribed by SCI.
9.11 Statutory Compliance
The Contractor shall comply with all applicable provisions of:
Gujarat Pollution Control Board (GPCB)
Central Pollution Control Board (CPCB)
Ministry of Environment, Forest & Climate Change (MoEF&CC)
Water (Prevention & Control of Pollution) Act
Air (Prevention & Control of Pollution) Act
Environment (Protection) Act
Hazardous and Other Wastes Rules
Factories Act
Contract Labour Act
Electricity Act and Rules
Applicable Safety Regulations
Any other statutory requirements issued by the Competent Authorities from time to time.
9.12 Performance Requirements
The Contractor shall ensure continuous and efficient operation of the CETP and shall maintain
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 35 | P a g e
treated effluent quality strictly within the discharge standards prescribed under the prevailing
GPCB Consent Conditions and other applicable statutory requirements.
The Contractor shall be responsible for achieving the performance standards specified under
this Tender Document.
9.13 Allied Works
The term "Allied Works" shall include all incidental, ancillary and support activities, whether
specifically mentioned in this Tender Document or reasonably implied, necessary for the safe,
efficient and uninterrupted operation, maintenance and repair of the 25 MLD CETP and its
associated facilities.
9.14 Annual Painting Work
The Contractor shall carry out painting of all plant structures, equipment, pipelines, handrails,
valves, supports and other exposed steel components once every year after completion of the
monsoon season, using approved primer and paint of standard quality. The cost of labour, tools,
scaffolding, consumables and all incidental expenses shall be deemed to be included in the
contract price, and no separate payment shall be made by SCI.
9.15 Dedicated Vehicle for Monitoring
The Contractor shall provide and maintain one dedicated Maruti EECO (or equivalent four-
wheeler utility vehicle) exclusively for monitoring, field inspections, sample collection,
emergency response, pipeline inspection and other official duties related to operation and
maintenance of the CETP. The vehicle shall be available 24 hours a day, 7 days a week (24×7)
throughout the contract period, complete with a driver, valid registration, insurance, PUC, fuel
and routine maintenance. All costs shall be borne by the Contractor, and no separate payment
shall be made by SCI.
9.16 Drinking Water Arrangement
The Contractor shall provide safe and hygienic potable drinking water for all personnel deployed
at the CETP, including SCI officials, contractor's staff and other authorized personnel, throughout
the contract period. The Contractor shall ensure uninterrupted availability of drinking water at all
designated locations. No separate payment shall be made by SCI.
9.17 Housekeeping of Administrative & Office Buildings
The Contractor shall carry out comprehensive housekeeping, cleaning and sanitation of the
Administrative Building, Office Building, Laboratory, Control Room, Meeting Room, Toilets,
Pantry, Staircases, Corridors and surrounding premises on a daily basis. The Contractor shall
deploy adequate housekeeping staff and provide all cleaning materials, consumables,
equipment and tools required for maintaining proper cleanliness and hygiene. No separate
payment shall be made by SCI.
9.18 Emergency Breakdown Team
The Contractor shall maintain a dedicated 24×7 emergency breakdown team to attend any
mechanical, electrical, instrumentation or process-related breakdown. The Contractor shall
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 36 | P a g e
ensure immediate mobilization of manpower, tools, equipment and consumables to restore the
plant to normal operation within the minimum possible time.
9.19 Critical Spare Inventory
The Contractor shall maintain adequate stock of critical spares, consumables and maintenance
materials required for uninterrupted operation and maintenance of the CETP. Shortage of spares
shall not be accepted as a reason for interruption of plant operation.
9.20 Monthly Joint Inspection
A joint inspection of the entire CETP, disposal pipeline, machinery, electrical systems, laboratory
and associated facilities shall be carried out every month by representatives of SCI and the
Contractor. The observations shall be recorded, and the Contractor shall rectify the deficiencies
within the time specified by SCI.
9.21 Electrical Systems Maintenance: The Contractor shall be responsible for the operation,
preventive maintenance, breakdown maintenance and minor repairs of all electrical systems
and accessories within the CETP premises, including but not limited to street lights, flood lights,
high mast lighting, office lighting, administrative building lighting, laboratory lighting, ceiling fans,
exhaust fans, air conditioners (ACs), power sockets, switches, MCC panels, distribution boards,
cabling and other electrical installations. The Contractor shall ensure uninterrupted functioning
of the above systems and promptly attend all electrical complaints. No separate payment shall
be made for such maintenance.
Routine maintenance, servicing and minor repairs shall be carried out by the Contractor. Major
replacement of equipment/components shall be undertaken by SCI only after prior written
approval; however, installation, commissioning and associated labour shall be the responsibility
of the Contractor unless otherwise directed by SCI.
9.22 CCTV Surveillance System
The Contractor shall be responsible for the operation, routine inspection, preventive
maintenance, troubleshooting and minor repairs of the complete CCTV surveillance system
installed at the CETP, including cameras, Network Video Recorder (NVR/DVR), monitors, power
supplies, switches, networking accessories, cables and associated equipment. The Contractor
shall ensure uninterrupted functioning of the CCTV system on a 24×7 basis and immediately
rectify any fault noticed. No separate payment shall be made for such operation and
9.23 Final Pumping Station
Operation, Maintenance & Repair (O&M&R) of the Final Pumping Station (FPS), including all Civil,
Mechanical, Electrical, Instrumentation and Automation systems, pumps, valves, pipelines,
sluice gates, level sensors, flow measuring instruments, MCC panels, DG synchronization
(where applicable), lighting, housekeeping, routine inspection, preventive maintenance,
breakdown maintenance, lubrication, replacement of consumables, testing, record keeping and
ensuring uninterrupted pumping of treated effluent to the disposal system/outfall.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 37 | P a g e
SECTION – 10: SCHEDULE – B (FINANCIAL BID/PRICE BID)
NAME OF WORK: Annual Rate Contract (ARC) for Comprehensive Operation, Maintenance &
Repair (O&M&R) of 25 MLD Common Effluent Treatment Plant (CETP) and Final Pumping Station,
including Civil, Mechanical, Electrical, Instrumentation, Automation, PLC-SCADA System,
Online Continuous Effluent Monitoring System (OCEMS), Laboratory Operations, Security
Services, Housekeeping and Allied Works at GIDC Sarigam Industrial Estate, Gujarat.
Sr. Rate Annual Amount
Description Quantity Unit
No. (₹/Month) (₹)
Comprehensive O&M including
Manpower(Including all
statutory Benefits), Laboratory
Operation, Security,
Housekeeping, Drinking Water,
Gardening, P.P.E., Safety,
EECO Vehicle (24×7),
Monitoring, Sampling, CCTV,
Street Lighting, Flood Lighting,
Office Electrical Maintenance,
Administrative Building
Maintenance and all allied
Supply, storage, handling,
dosing and monitoring of all
treatment chemicals required
for treatment of industrial
MAINTENANCE COST
Preventive & Breakdown
Maintenance of Civil,
Mechanical, Electrical,
Instrumentation, PLC-SCADA,
OCEMS, DG Set, HT/LT
System, Buildings and all allied
TOTAL ESTIMATED COST (A+B+C)
Percentage Quoted by the Bidder
The Bidder shall quote only one percentage rate over the Estimated Cost Put to Tender.
Quoted Percentage: ________ % Above / Below / At Par (Strike out whichever is not applicable)
Net Contract Value:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 38 | P a g e
I/We hereby agree to execute the entire work covered under this Tender at the above quoted
percentage rate over the Estimated Cost Put to Tender, in accordance with the Tender
Document, Technical Specifications, Scope of Work, General & Special Conditions of Contract,
and all other terms and conditions contained therein.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 39 | P a g e
quoted rates shall be firm, complete and unconditional and shall remain valid throughout the
Contract Period, unless otherwise specifically provided in the Contract.
The rates quoted by the Bidder shall be deemed to include all obligations, responsibilities, risks,
overheads, profit and incidental expenses necessary for satisfactory execution of the Contract.
11.2 Basis of Payment
Payment shall be made on the basis of the actual quantity of treated effluent discharged from
the CETP Outlet, as recorded by the calibrated Outlet Flow Meter installed at the CETP and duly
certified by SCI, at the applicable rate derived from the rate quoted by the Bidder in Schedule–B.
The estimated quantity specified in Schedule–B shall be used only for the purpose of evaluation
and comparison of bids and shall not constitute any minimum quantity guaranteed by SCI.
11.3 Estimated Quantity
solely for the purpose of bid evaluation.
The actual quantity of effluent received and treated may increase or decrease depending upon
operational requirements, influent characteristics and flow received at the CETP.
SCI does not guarantee any minimum quantity of effluent during the Contract Period.
No claim whatsoever shall be entertained on account of variation in the quantity of effluent
11.4 Items Included in the Quoted Rates
Unless specifically stated otherwise in this Tender Document, the quoted rates shall be deemed
to include the cost of:
Complete Operation, Maintenance & Repair (O&M&R);
Deployment of manpower and supervision;
Treatment chemicals and laboratory reagents;
Monitoring of member industries;
Vehicles, fuel and transportation;
Lubricants, grease and routine consumables;
Tools, tackles and testing instruments;
Safety equipment (PPE);
Housekeeping materials;
Routine maintenance materials;
Calibration of instruments;
Communication expenses;
Documentation and reporting;
Statutory compliances;
Taxes, duties, levies and all incidental expenses;
Contractor's overheads and profit.
11.5 Items Payable by SCI
Unless otherwise specifically provided in this Tender Document, the following expenses shall be
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 40 | P a g e
Electricity Charges;
Diesel Fuel Charges for DG Sets (where applicable);
TSDF Disposal Charges;
Transportation charges from CETP-Sarigam to the designated TSDF facility shall be borne
by the Contractor if the TSDF facility is located within a distance of 25 km from CETP-
Sarigam. If the designated TSDF facility is located beyond 25 km, the additional
transportation charges shall be borne by SCI, as applicable.
11.6 Taxes & Duties
The Bidder shall quote the rates inclusive of all applicable taxes, duties, cess and statutory
levies, except GST, which shall be payable separately at the applicable rate as per Government
rules, subject to submission of valid tax invoices.
Any change in GST during the Contract Period shall be regulated in accordance with the
applicable statutory provisions.
11.7 Measurement & Certification
Measurement of treated effluent shall be based on the readings recorded by the calibrated
Outlet Flow Meter installed at the CETP.
The quantity certified by SCI shall be final for the purpose of payment.
SCI may verify the flow meter records, calibration reports and operational data before
11.8 Monthly Bills
The Contractor shall submit Monthly Running Bills in the prescribed format along with all
supporting documents, including:
Monthly flow statement;
Outlet Flow Meter readings;
Laboratory reports;
Monthly performance reports;
Statutory compliance documents;
GPCB/CPCB analysis report
Any other document required by SCI.
Incomplete bills shall not be processed until all required documents are submitted.
11.9 Payment Terms
Subject to satisfactory performance and certification by SCI, payment shall normally be released
within 45 days from the date of receipt of complete and correct bills along with all required
supporting documents.
SCI shall have the right to withhold payment for any disputed, defective or non-compliant work
until such deficiencies are rectified.
11.10 Deductions & Recoveries
SCI shall be entitled to recover from the Contractor any amount payable by the Contractor under
the Contract, including but not limited to:
Environmental Compensation;
Statutory dues;
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 41 | P a g e
Cost of rectification;
Cost of alternative arrangements;
Excess payments, if any;
Any other recoveries permissible under the Contract.
Such recoveries may be made from any bill, Security Deposit or Performance Bank Guarantee.
11.11 No Additional Payment
The Contractor shall be deemed to have fully examined the Tender Documents, Scope of Work,
Site Conditions and operational requirements before submitting the Bid.
No additional payment, compensation, escalation, idle manpower charges, establishment
charges, overheads, loss of profit or extra rates shall be admissible on account of:
Increase or decrease in effluent quantity;
Variation in influent characteristics;
Operational difficulties;
Misunderstanding of the scope of work;
Omission by the contractor;
Site conditions;
Delay in execution attributable to the contractor; or
Any other reason not specifically provided in the contract.
11.12 – Performance Evaluation, Liquidated Damages & Recovery
The Contractor shall ensure continuous, efficient and satisfactory operation, maintenance and
repair of the CETP, Final Pumping Station and all associated facilities in accordance with the
Tender Specifications, Contract Conditions, GPCB/CPCB Consent Conditions and applicable
statutory requirements.
Failure to meet any of the Performance Standards specified below, where attributable to the
negligence, default, omission or non-performance of the Contractor, shall attract Liquidated
Damages (LD) in addition to recovery of actual loss, statutory penalty, environmental
compensation or any other expenditure incurred by SCI.
Performance Evaluation & Liquidated Damages Matrix
Sr. Event Triggering Liquidated Liquidated Damages Frequency
1 Non-conformance with any ₹0.50 per KL of treated Every day of
parameter standards as per GPCB effluent per day non-
CC&A-CETP Sarigam compliance
2 Avoidable shutdown of CETP or Final ₹10,000 per hour (Maximum Per occurrence
Pumping Station ₹1,00,000 per incident)
3 Failure to restore any Critical ₹10,000 per equipment per Per day
Equipment (Pump, Blower, day
Transformer, DG, MCC, PLC, SCADA,
etc.) within prescribed time
4 OCEMS / PLC / SCADA System not ₹5,000 per day Per day
operational due to Contractor's
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 42 | P a g e
5 Short deployment of approved ₹2,000 per person per day Per day
manpower plus proportionate salary
6 Failure to conduct prescribed ₹3,000 per occurrence Per occurrence
laboratory testing, sampling or
maintain laboratory records
7 Delay in submission of Daily, Weekly ₹1,000 per day Per day
or Monthly Reports
8 Failure to attend emergency ₹10,000 per occurrence Per occurrence
breakdown within stipulated
9 Failure to comply with written ₹5,000 per occurrence Per occurrence
instructions issued by SCI
10 Damage to Plant, Equipment or Civil Actual repair/replacement Per occurrence
Structures due to Contractor's cost + ₹10,000 per
negligence occurrence
11 Failure to maintain minimum stock of ₹5,000 per occurrence Per occurrence
critical spares and consumables
12 Any other breach of Contract not Up to ₹25,000 per Per occurrence
specifically covered above occurrence, depending
11.12.1 Additional Recovery:
The above Liquidated Damages shall be without prejudice to SCI's right to recover:
Actual financial loss suffered by SCI.
Any statutory penalty imposed by GPCB, CPCB, MoEF&CC or any Government Authority.
Environmental Compensation imposed by any Competent Authority.
Actual repair or replacement cost of any damaged Civil, Mechanical, Electrical,
Instrumentation, Automation, PLC-SCADA or Utility System.
Additional expenditure incurred by SCI for engaging any third party for emergency
operation, maintenance or rectification.
Any third-party claim, compensation, legal expenses or liabilities arising due to the
Contractor's negligence or default.
11.12.2 Recovery Mechanism:
SCI shall have the right to recover the above Liquidated Damages and all other recoverable
Running Account (RA) Bills;
Security Deposit;
Performance Bank Guarantee;
Any other amount payable to the Contractor under the Contract,
without prejudice to any other legal rights and remedies available to SCI.
11.12.3 Maximum Monthly Liquidated Damages:
The total Liquidated Damages under this Clause shall ordinarily not exceed 10% of the Monthly
Contract Valueduring any billing month. However, this limitation shall not apply to:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 43 | P a g e
Recovery of actual loss or damage;
Statutory penalties;
Environmental Compensation;
Risk & Cost recovery;
Fraud, wilful misconduct or gross negligence;
Cost of repair or replacement of damaged assets.
11.12.4 Exception
No Liquidated Damages shall be levied where the non-performance is solely attributable to:
Force Majeure events;
Written instructions issued by SCI;
Proven failure of facilities not handed over to the Contractor;
Hydraulic overloading due to extraordinary rainfall, flooding or storm water ingress,
provided the Contractor has operated and maintained the plant diligently and in
accordance with the Contract.
11.13 Final Payment
Final payment shall be released only after:
Satisfactory completion of the Contract;
Submission of all records and documents;
Handing over of the CETP and associated facilities in satisfactory operating condition;
Settlement of all recoveries and statutory obligations; and
Issuance of the Final Completion Certificate by SCI.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 44 | P a g e
APPENDIX – A: ELIGIBILITY DOCUMENTS CHECKLIST
The Bidder shall submit the following documents in support of the Eligibility & Pre-Qualification
Requirements specified in this Tender Document. Non-submission of any applicable document
may render the Bid liable for rejection.
Sr. Eligibility Requirement Documents to be Submitted
1 Legal Status of Bidder Certificate of Incorporation / Registration
Certificate of Company / LLP / Partnership Firm,
2 Contractor Registration Valid Contractor Registration Certificate of
appropriate class/category
3 Electrical Contractor Licence Valid Electrical Contractor Licence issued by the
Competent Authority
4 Similar Work Experience Details of qualifying Similar Work(s) in the
prescribed format
5 Work Orders Copy of Work Orders supporting the Similar Work
6 Completion / Performance Completion Certificates and/or Performance
Certificates Certificates issued by the Client
7 Average Annual Financial Chartered Accountant's Certificate for the
Turnover financial years specified in the Tender
8 Audited Financial Statements Audited Balance Sheet and Profit & Loss Account
for the financial years specified in the Tender
9 Income Tax Returns (ITR) Copies of Income Tax Returns with
acknowledgement for the financial years
specified in the Tender
10 Bank Solvency Certificate Fresh and valid Solvency Certificate issued by a
Scheduled Bank for the amount specified in the
11 Bid Capacity Duly filled Appendix–D together with supporting
documents, wherever applicable
12 Current Commitments Duly filled Appendix–E
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 45 | P a g e
13 Litigation History Duly filled Appendix–I along with supporting
documents, if any
14 Plant & Machinery Duly filled Appendix–J indicating availability of
Plant & Machinery
15 Manpower Deployment Duly filled Appendix–H indicating availability of
key technical personnel
16 Machinery Deployment Duly signed Appendix–B
17 Organization Structure Duly filled Appendix–G
18 General Information Duly filled Appendix–F
19 Laboratory Facilities Details of laboratory facilities, testing equipment
and analytical capabilities proposed for execution
of the Contract
20 Monitoring Vehicles Details of vehicles proposed for monitoring and
field activities
21 O&M Methodology Method Statement / Work Execution Plan / O&M
22 Preventive Maintenance Proposed Preventive Maintenance Schedule in
Programme accordance with Appendix–M
23 Tools, Tackles & Testing Details of tools, tackles and testing equipment
Equipment proposed for execution of the Contract as per
1. SCI reserves the right to verify any information or document submitted by the Bidder from
the issuing authority or any other reliable source.
2. SCI may call for original documents for verification at any stage of the Tender process.
3. Submission of false, forged, misleading or incomplete documents shall render the Bid
liable for rejection, without prejudice to any other action available to SCI under the
Tender Conditions or applicable law.
4. Submission of the above documents shall not relieve the Bidder from furnishing any
additional information or document that SCI may reasonably require for verification of
the Bidder's eligibility.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 46 | P a g e
APPENDIX – B: UNDERTAKING FOR DEPLOYMENT OF PLANT, MACHINERY, TOOLS &
(To be submitted on the Bidder's Letterhead)
The Chief Executive Officer
Sarigam Clean Initiative (SCI)
GIDC Sarigam, Dist. Valsad, Gujarat
Subject: Undertaking for Deployment of Plant, Machinery, Tools, Tackles & Testing
I/We, ____________________________, the undersigned, hereby solemnly affirm and undertake as
1. We have carefully examined the Tender Document, Scope of Work, Technical
Specifications and all Contract requirements.
2. We undertake that, in the event of award of the Contract, we shall deploy and maintain,
throughout the Contract Period, all Plant, Machinery, Tools, Tackles, Testing
Instruments, Safety Equipment and other resources required for proper execution of the
3. We further undertake that the Plant, Machinery and Equipment deployed shall be
adequate in quantity, suitable for the intended purpose, maintained in good working
condition and shall comply with the requirements specified in the Tender Document.
4. We agree that any Plant, Machinery or Equipment becoming defective, damaged or
unserviceable during the Contract Period shall be repaired or replaced immediately at
our own cost without affecting the operation of the CETP.
5. We confirm that all machinery, tools, tackles and testing equipment proposed for
deployment are either available with us or shall be arranged before commencement of
6. We further undertake to provide any additional machinery, tools, testing instruments or
equipment as may reasonably be required by SCI for satisfactory execution of the
Contract without any additional financial implication to SCI, unless otherwise
specifically provided in the Contract.
7. We understand that failure to deploy or maintain the required Plant, Machinery, Tools,
Tackles and Testing Equipment shall constitute a breach of the Contract and SCI shall be
entitled to take action in accordance with the provisions of the Tender Document.
8. We certify that the information furnished by us in Appendix–J (Plant & Machinery
Details) is true and correct.
We hereby declare that the above undertaking is true and binding upon us.
1. This Undertaking shall be signed by the Authorized Signatory of the Bidder.
2. SCI reserves the right to verify the availability of the declared machinery and equipment
at any stage of the Tender or Contract.
3. The detailed list of Plant, Machinery, Tools, Tackles and Testing Equipment shall be
furnished separately in Appendix–J and Appendix–L, as applicable.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 47 | P a g e
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 48 | P a g e
APPENDIX – C: Self-Evaluation & Compliance Matrix
Sr. Reference Particulars / Details to be Page Compliance
No. Requirement Furnished by No. (Yes/No)
1 Notice Inviting E- Tender Fee DD/UTR No., Date &
Tender (NIT) Amount
2 Notice Inviting E- Earnest Money DD/FDR/BG/UTR
Tender (NIT) Deposit (EMD) No., Date & Amount
3 Eligibility Criteria Registration Registration Details
& Pre- Certificate & Validity
4 Eligibility Criteria Electrical Licence Details &
& Pre- Contractor Validity
Qualification Licence
5 Eligibility Criteria Similar Work Details of qualifying
& Pre- Experience CETP O&M&R
Qualification work(s)
6 Eligibility Criteria Work Orders Copies of Work
7 Eligibility Criteria Completion / Copies of
& Pre- Performance Completion /
Qualification Certificates Performance
Requirements Certificates
8 Eligibility Criteria Average Annual CA Certified
& Pre- Turnover Certificate
9 Eligibility Criteria Audited Financial As prescribed in
& Pre- Statements Tender
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 49 | P a g e
10 Eligibility Criteria Income Tax As prescribed in
& Pre- Returns (ITR) Tender
11 Eligibility Criteria Bank Solvency Valid Solvency
& Pre- Certificate Certificate
12 Bid Submission PAN Card Copy of PAN
13 Bid Submission GST Registration GST Registration
Requirements Certificate
14 Bid Submission EPF Registration Registration
Requirements Certificate & Latest
15 Bid Submission ESIC Registration Registration
Requirements Certificate & Latest
16 Bid Submission Labour Licence Copy, wherever
Requirements applicable
17 Appendix–A Eligibility Complete Checklist
Documents Submitted
18 Appendix–B Machinery Duly Signed
Deployment Undertaking
19 Appendix–D Bid Capacity Duly Filled
Statement Appendix-D
20 Appendix–E Current Duly Filled
Commitments Appendix-E
21 Appendix–F General Duly Filled
Information of Appendix-F
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 50 | P a g e
22 Appendix–G Organization Duly Filled
Structure & Key Appendix-G
23 Appendix–H Details of Duly Filled
Manpower Appendix-H
24 Appendix–I Litigation History Details / NIL
25 Appendix–J Plant & Machinery Details of Machinery
Details & Equipment
26 Appendix–K Minimum Acceptance /
Sampling Compliance
27 Appendix–L Minimum Tools, Details of Available
Tackles & Testing Equipment
28 Appendix–M Preventive Proposed PM
Maintenance Schedule
29 Appendix–N Reporting Acceptance /
Formats Compliance
30 Bid Submission Laboratory Details of
Requirements Facilities Laboratory &
31 Bid Submission Monitoring Details of Vehicles
Requirements Vehicles Proposed
32 Bid Submission O&M Method Statement /
Requirements Methodology Execution Plan
33 Affidavit Non-Blacklisting / Duly Notarized
Debarment Affidavit
34 Site Visit Site Visit Certificate Issued by
Certificate SCI
35 Undertaking Truthfulness of Duly Signed
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 51 | P a g e
Information Undertaking
36 Form–B1 Form–B1 Duly Filled & Signed
37 Bid Submission Additional Any Other
Requirements Information Supporting
Certification by the Bidder :
We hereby certify that all the information and documents furnished in this Self-Evaluation Sheet
are true, complete and correct. We further certify that all supporting documents have been
enclosed with the Bid. We understand that submission of false, misleading or incomplete
information shall render our Bid liable for rejection and may attract further action as per the
provisions of the Tender Document.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 52 | P a g e
Bid Capacity Statement
(To be submitted on the Bidder's Letter Head)
I/We hereby certify that the information furnished below is true and correct and that our firm
possesses adequate financial, technical, organizational and execution capacity to undertake the
Sr.No. Particulars Details
1 Name Of Bidder
2 Registered Office Address
3 Total Annual Turnover (Last 3 Financial Years)
4 Average Annual Turnover
5 Similar O&M Works Currently In Progress
6 Total Value Of Ongoing Contracts
7 Available Technical Staff
8 Available Plant & Machinery
9 Financial Resources Available For This Work
10 Any Other Relevant Information
I/We certify that:
1. We have sufficient financial, technical and managerial resources to execute the work.
2. The execution of this contract shall not adversely affect our existing commitments.
3. We possess adequate manpower, machinery and infrastructure required for successful
execution of the work.
4. The information furnished above is true and correct.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 53 | P a g e
Details of Current Commitments
(To be submitted on the Bidder's Letter Head)
The bidder shall furnish details of all ongoing Operation & Maintenance Contracts and other
major works presently under execution.
Sr. Name Name Nature Contract Date of Scheduled % Present
No of of of Work Value (₹) Commen Completion Comp Status
. Client Work cement Date leted
I/We certify that:
1. The above information regarding ongoing commitments is complete and correct.
2. None of the above commitments will affect timely execution of the present contract.
3. SCI reserves the right to verify the above information from any client.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 54 | P a g e
GENERAL INFORMATION
The Applicants are requested to provide the following information:
Sr. Particulars Details
1 Name of Firm / Company
2 Registered Office Address
3 Head Office Address
4 Telephone No.
5 Mobile No. of Authorized Contact Person
6 E-mail Address
7 Website Address (if any)
8 Place of Incorporation / Registration
9 Year of Incorporation / Registration
10 Constitution of Firm (Proprietorship / Partnership / LLP / Private
Limited / Public Limited)
11 Name(s) of Proprietor / Partners / Directors
12 GST Registration No.
14 EPF Registration No. (if applicable)
15 ESIC Registration No. (if applicable)
16 ISO Certifications, if any
17 Name and Designation of Authorized Signatory
I/We certify that:
1. The above information is complete and correct.
2. SCI reserves the right to verify the above information.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 55 | P a g e
STRUCTURE AND ORGANIZATION
The Applicants are requested to provide the following information:
Sr. Particulars Details
1 Details of Directors / Partners / Proprietor / Key Management
2 Organization Structure showing Reporting Hierarchy and Key Attach
Personnel proposed for this Contract Organization Chart
3 Details of Associated Companies / Holding Company /
Subsidiaries / Group Companies / Consortium Members (if
4 Details of Key Technical Personnel proposed for this Contract
5 Details of Major Plant, Machinery, Tools, Testing Instruments
and Maintenance Equipment available for execution of the
6 Details of Similar CETP O&M&R Contracts successfully
completed during the last Five (05) Years
7 Details of Ongoing Operation & Maintenance Contracts
8 Details of Regional / Site Offices, Workshops or Service Support
Facilities available in Gujarat (if any)
9 Details of Laboratory Facilities (In-house / NABL Tie-up / Third
I/We certify that:
1. The above information is complete and correct.
2. SCI reserves the right to verify the above information.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 56 | P a g e
DETAILS OF MANPOWER DEPLOYMENT
The bidder shall furnish an undertaking for deployment of the minimum manpower as listed
below for this project.
Sr. Name of Post Minimum Qualification Minimum
1 General Manager B.E./B.Tech. in Environmental / Chemical
(O&M) Engineering with relevant experience
2 Plant Manager B.E./B.Tech. in Environmental / Chemical
Engineering with relevant experience
3 Plant In-charge B.E./B.Tech. in Environmental / Chemical
Engineering with relevant experience
4 Monitoring In- B.E./B.Tech. in Environmental / Chemical
charge Engineering with relevant experience
5 Laboratory In- M.Sc. Chemistry / Environmental Science with
charge relevant laboratory experience
6 Plant Chemist B.E. (Chemical) / B.Sc. / M.Sc. Chemistry /
Environmental Science with relevant
7 Monitoring Chemist B.Sc. / M.Sc. Chemistry / Environmental
Science with relevant experience
8 Laboratory Chemist B.Sc. / M.Sc. Chemistry / Environmental
Science with relevant laboratory experience
9 Electrical Engineer B.E./Diploma in Electrical Engineering with
minimum 2 years' experience
10 Mechanical B.E./Diploma in Mechanical Engineering with
Engineer minimum 2 years' experience
11 Electrician ITI Electrician with valid licence (where
applicable) and minimum 2 years' experience
12 Foreman / Fitter ITI Fitter / Mechanical with minimum 2 years'
13 Plant Operator Diploma / ITI in Mechanical / Electrical /
Chemical Engineering or any Graduate with
minimum 2 years' experience in operation of
14 Plant Helper Physically Fit with experience in industrial
plant operations
15 Monitoring Helper Physically Fit with experience in sampling /
field monitoring
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 57 | P a g e
16 Disposal Pipeline Physically Fit with experience in pipeline
Operator cum inspection / field operations
17 Sweeper / Physically Fit
18 Security Personnel Physically Fit
Total Minimum Manpower: 85 Persons
1. The prospective bidder shall submit an undertaking for deployment of the above
manpower for this project.
2. The contractor shall ensure round-the-clock operation of all treatment units, pumping
stations, laboratories and allied facilities.
3. The manpower indicated above is the minimum requirement. The contractor shall deploy
additional manpower as required for efficient operation and maintenance of the plant
and associated facilities without any additional cost to the Employer.
4. All personnel shall possess the required qualifications and experience and shall be
available during the contract period.
5. SCI reserves the right to verify qualifications, experience certificates and deployment
records of all personnel proposed by the bidder.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 58 | P a g e
LITIGATION HISTORY
1. The Applicant shall provide accurate information regarding any litigation, arbitration,
dispute, claim, blacklisting, contract termination or court proceedings arising out of
contracts completed or under execution during the last five (5) financial years.
2. A consistent history of arbitration awards, adverse judgments, blacklisting, contract
termination due to default, or litigation against the Applicant may result in
disqualification from the bidding process.
3. If any information relating to litigation history is found to have been concealed,
suppressed or misrepresented, the Employer reserves the right to reject the bid,
terminate the contract (if awarded), forfeit Security Deposit / Performance Security and
take any other action deemed appropriate.
4. The Applicant shall submit the following statement. In case there is no litigation history,
the Applicant shall submit a declaration stating "NIL" or "NOT APPLICABLE".
Sr Name Employe Work Finan Brief Amou Prese Result Decisi
. of r/ Comple cial Details nt nt of on in
N Contr Departm ted or Year of Involv Status Arbitrat Favour
o. act / ent Under Arbitrat ed (₹) (Pendi ion / /
Projec Executi ion / ng / Judgme Agains
t on Litigati Decid nt t
on / ed) Applic
I/We hereby declare that the information furnished above regarding litigation, arbitration,
disputes, claims, blacklisting, contract termination and court proceedings is true, complete and
correct. I/We confirm that no material information has been concealed or suppressed. Where no
such matter exists, the same has been stated as NIL / NOT APPLICABLE.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 59 | P a g e
Plant & Machinery Details
(To be submitted on Bidder's Letter Head)
The Bidder shall furnish details of the plant, machinery, tools and equipment available for
execution of the work.
Sr. Name of Plant / Make Capacity Quantity Owned / Present
No. Machinery / Available Hired Condition
I/We certify that:
1. The above information is complete and correct.
2. SCI reserves the right to verify the above information from any client.
Name of Bidder:
Authorized Signatory:
Signature & Seal:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 60 | P a g e
Minimum Sampling Schedule
The Contractor shall carry out sampling and analysis as per CPCB/GPCB guidelines or as
directed by SCI.
Sr. No. Sampling Location Minimum Parameters
1 CETP Inlet Daily As per GPCB Consent
2 Equalization Tank Daily As per GPCB Consent
3 Aeration Tank Daily As per GPCB Consent
Extra: DO, MLSS, MLVSS
4 Primary Clarifier Daily As per GPCB Consent
5 Secondary Clarifier Daily As per GPCB Consent
6 Treated Effluent Outlet Daily As per GPCB Consent
7 Disposal Pipeline As directed by SCI Visual Inspection & Sampling
8 Member Industries As directed by SCI Grab Sampling
Note: SCI may increase the frequency whenever required.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 61 | P a g e
Minimum Tools, Tackles & Testing Equipment
The Contractor shall deploy and maintain the following minimum equipment.
Sr. No. Description Minimum Quantity
1 Portable pH Meter
2 Portable TDS Meter
4 Digital Multimeter
5 Insulation Tester (Megger)
7 Portable Dewatering Pump
8 Welding Machine
9 Grass Cutting Machine
10 Hand Tools (Complete Set) As Required
11 Safety PPE Kit Sufficient Quantity
12 JCB/Hydra/Crane When ever required
Note: The Contractor shall arrange, at his own cost and risk, all additional tools, tackles, lifting
equipment and machinery, including but not limited to JCB, Hydra Crane, Mobile Crane,
Excavator, Tipper, Forklift, Dewatering Pumps, Welding Machines or any other equipment
required for execution of operation, maintenance, repair, replacement, emergency breakdown
works, sludge handling, pipeline maintenance or any other activities under the scope of this
contract. No separate payment or reimbursement shall be made by SCI for such deployment.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 62 | P a g e
Preventive Maintenance Schedule
The Contractor shall carry out preventive maintenance at the following minimum frequency.
Equipment Daily Weekly Monthly Quarterly Half-Yearly Yearly
Motors ✓ ✓ ✓ ✓ ✓ ✓
Blowers ✓ ✓ ✓ ✓ ✓ ✓
Mixers ✓ ✓ ✓ ✓ ✓ ✓
Air Compressors ✓ ✓ ✓ ✓ ✓ ✓
Electrical Panels ✓ ✓ ✓ ✓ ✓ ✓
Flow Meters ✓ ✓ ✓ Calibration
Online Instruments ✓ ✓ ✓ ✓ Calibration
Filter Press ✓ ✓ ✓ ✓ ✓ ✓
Screw Press / Volute ✓ ✓ ✓ ✓ ✓ ✓
Mechanical Screens ✓ ✓ ✓ ✓ ✓ ✓
Gates & Valves ✓ ✓ ✓ ✓ ✓ ✓
Preventive maintenance records shall be maintained and produced before SCI whenever
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 63 | P a g e
Reporting Formats
The Contractor shall submit the following reports.
Sr. No. Report Frequency
1 Daily Operation Report Daily
2 Flow Report Daily
3 Laboratory Analysis Report Daily
4 Chemical Consumption Report Daily
5 Power Consumption Report Daily
6 Sludge Generation & Disposal Report Daily
7 Preventive Maintenance Report Weekly
8 Breakdown Report Immediate
9 Spare Consumption Report Monthly
10 Manpower Attendance Report Monthly
11 Chemical Stock Report Monthly
12 Consumables Stock Report Monthly
13 Instrument Calibration Report Monthly / As Applicable
14 Safety & Incident Report Monthly
15 Disposal Pipeline Inspection Report Weekly
16 Member Industry Sampling Report As Directed
17 OCEMS / Flow Meter Status Report Daily
18 Monthly Performance Report Monthly
All reports shall be submitted in both hard copy and soft copy (MS Excel/PDF).
The Contractor shall maintain all registers and logbooks in formats approved by SCI.
SCI may prescribe additional reporting formats during the contract period, and the
Contractor shall comply without any additional cost.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 64 | P a g e
AFFIDAVIT FOR NON-BLACKLISTING / DEBARMENT
(To be submitted on appropriate Non-Judicial Stamp Paper and duly notarized)
I/We, the undersigned, being the authorized signatory of the Bidder, do hereby solemnly affirm
and declare as under:
1. That the Bidder, its Proprietor / Partners / Directors, as applicable, has not been blacklisted,
debarred or banned by any Central Government Department, State Government Department,
Government Undertaking, Public Sector Undertaking, Statutory Authority, Local Authority or any
other Government Agency as on the date of submission of this Bid.
2. That no order of blacklisting, debarment or banning is presently in force against the Bidder
which would render the Bidder ineligible to participate in this Tender.
3. That the Bidder has not concealed any material fact relating to blacklisting, debarment or
banning. If any such order or proceeding exists or arises, complete details have been disclosed
separately along with this Affidavit.
4. That the Bidder understands that if any declaration made herein is found to be false,
misleading or incorrect, SCI shall be entitled to reject the Bid, cancel the Letter of Acceptance /
Work Order, terminate the Contract, forfeit the EMD / Security Deposit / Performance Security,
as applicable, and take such further action as permissible under the Tender Conditions and
applicable law.
5. That I/We am/are duly authorized to make this declaration and execute this Affidavit on
behalf of the Bidder.
Name of Authorized Signatory ____________________________________________
Signature of Authorized Signatory: ______________________________
I/We hereby verify that the contents of this Affidavit are true and correct to the best of my/our
knowledge and belief and that nothing material has been concealed therefrom.
Seal & Signature: ____________________
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 65 | P a g e
SITE VISIT CERTIFICATE
(To be completed and signed by the authorized representative of SCI)
This is to certify that the following representative of the Bidder has visited and inspected the
Common Effluent Treatment Plant (CETP), Final Pumping Station and associated facilities at
GIDC Sarigam Industrial Estate, Gujarat, in connection with E-SHORT TENDER NOTICE NO.
Name of Person Visiting the Site ____________________________________________
The Bidder's representative has been provided an opportunity to inspect the relevant site
facilities and obtain a general understanding of the existing plant, equipment, access,
operational conditions and nature of the work.
This certificate is issued only as evidence of the site visit. It shall not relieve the Bidder of its
responsibility to independently assess the site conditions, scope of work, risks, resources and
obligations under the Tender Document.
The Bidder shall remain bound by all provisions of the Tender Document, including the
requirements relating to site inspection and submission of the Bid.
For SARIGAM CLEAN INITIATIVE (SCI)
Official Seal of SCI
Acknowledgement by Bidder's Representative:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 66 | P a g e
UNDERTAKING FOR TRUTHFULNESS OF INFORMATION
(To be submitted on the Bidder's Letterhead)
I/We, the undersigned, being the authorized signatory of the Bidder, hereby solemnly affirm and
undertake as follows:
1. All information, statements, declarations, certificates, records and documents submitted by
us in connection with E-SHORT TENDER NOTICE NO. 01 OF 2026-27 are true, complete, correct
and genuine to the best of our knowledge and belief.
2. The documents and information furnished in support of our legal status, eligibility, technical
qualifications, work experience, financial capacity, turnover, manpower, machinery, statutory
registrations, licences and other requirements are valid and capable of independent
3. No material information relevant to our eligibility, qualification or capacity to execute the
Contract has been concealed, suppressed, misrepresented or withheld.
4. We authorize Sarigam Clean Initiative (SCI) to verify the information and documents
submitted by us with the concerned clients, employers, government departments, statutory
authorities, banks, financial institutions, Chartered Accountants or other relevant agencies,
wherever considered necessary.
5. We undertake to promptly inform SCI in writing if any material information or circumstance
affecting our eligibility, qualification or declarations changes during the tender process or, if the
Contract is awarded, during the Contract Period.
6. We understand that submission of any false, forged, misleading, incomplete or materially
incorrect information or document may result in rejection of our Bid, cancellation of the Letter
of Acceptance / Work Order, termination of the Contract, forfeiture of EMD / Security Deposit /
Performance Security, as applicable, and any other action permissible under the Tender
Conditions and applicable law.
7. We accept responsibility for the authenticity and correctness of all documents and
information submitted by us and confirm that this Undertaking is binding upon the Bidder.
Name of Authorized Signatory ____________________________________________
Signature of Authorized Signatory: ______________________________
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 01 OF 2026-27 67 | P a g e
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-Short Tender Notice No. 01 of 2026-27.pdf
Form B1.pdf
boq1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .