Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
5 Aug 2026, 6:00 pm
Executive Engineer Unit-1 kherva
Supply of Spares for Vertical turbine pump (2nos) capacity of 5100 M/Hr, 6.6 KVHT Panel Spares and DPCV etc. for Khorsam-Matpur pipeline project
324228
08/2026-2027
Open
Machineries/ Mechanical Equipment
Works
Mehsana
9 documents required · 9 mandatory
₹4,248
Executive Engineer, Unit No-1 kherava (Mehsana)
₹1.2 L
15 Jul 2026
15 Jul 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
Name of work :- Supply of Spares For Vertical Turbine Pump 2 Nos (Capacity 5100 m3/Hr),
6.6KVHT Panel Spares and DPCV etc For Khorsam- Matpur Pipeline Project.
Rate Total Amount
Rate Total Amount
Item No. Item of work Unit estimated
but may be In Figures Rs. quantities
1 2 Supplying Bottom Bearing 115,425.75 No.
2 8 Supplying Bowl Bearing Top OR Bottom 161,349.15 No.
3 4 Supplying line Shaft Bearing 146,288.25 No.
4 4 Supplying impeller shaft sleeve 129,499.05 No.
5 4 Supplying impeller shaft sleeve flange type 105,673.20 No.
6 4 Supplying INT Guide Sleeve( line Sleeve) 77,773.50 No.
7 2 Supplying Gland Sleeve( Top Sleeve) 77,773.50 No.
8 2 Supplying Top shaft 258,010.50 No.
9 2 Supplying Pump shaft 333,561.90 No.
10 4 Supplying Intermediate Shafts 192,458.55 No.
11 8 Supplying Impeller wear ring(NDE) or (DE) 117,154.05 No.
12 0 Supplying Bowl wearing(DE) or (NDE) 123,265.33 No.
13 3 Supplying of Throdon Bush Carriage 56,540.10 No.
14 8 Supplying Muff Coupling/ sleeve Coupling 129,622.50 No.
15 2 Reparing of Coloum Pipe 104,932.50 No.
16 3 Supplying of 1000 mm DPCV PN 1.6 527,131.50 No.
Supplying of 7.2 KV Vaccum Contractor for
Motor Feeder (3 pole)
Supplying of 7.2 KV KV Vaccum
Contractor for Soft Feeder (2 pole)
19 3 Supplying of Lighting Arrestor 66 KV 80,242.50 No.
Say Total Cost.
Rupees One Crore Sixty Four Lakh Eleven Thousand Seven Hundred Eighty Only.
I/We am/are willing to carry out the work at………………………...…% above/below.
Percent (Should be written in figures and words.) of the estimated rates mentioned above. Amount of my/our
Estimate Amount Put to Estimate
tender.Rs: 12070696.00 Amount Put to
%below Rs: Add……… %above.Rs:
Net……………… Rs: Total Rs:
In words.. In words
Note:1: All works shall be carried out as per public works Department Handbook and other specification of
Division or As directed for which no extra payment shall be made
All the columns is schedule should be filled in ink and the total of the entries in the last column should
be struck by the contractor under his signature. The labour cess will be deducted as per prevailing
Note:3: Rates quoted include clearance of site (prior commencement of work and at its close) in all respects
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.
Note:4: NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. there fore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been deducted
Signature of the contractor:
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD spair parts vt pump final 14.7.26.pdf
SCHEDULE B TURBINE PUMP.pdf
Download all tender documents and submit your bid