Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance | ₹3.9 L | L1 | Accepted-Finance Eligible |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance In Eligible |
| 3 | L3₹4.1 LRejected-Finance | ₹4.1 L | L3 | Rejected-Finance In Eligible |
| Sl No | Description | Qty | Unit | M.V.Associates L1 | Shiwani L3 | DHANANJAY SINGH SLATHIA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Rewinding of 100HP , 3-Phase , 415volts , 50hz induction motor with "F" Class Insulation including varnish and testing complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 100 | Per HP | 1,150 ₹1.1 L | 1,190 ₹1.2 L | 1,180 ₹1.2 L |
| 2.00 | Repair of 3-Phase star delta oil immersed starter, i.e. cleaning of contact points ,aligmnemt of points and replacement of 2 nos stem carreris complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 2 | Each | 9,700 ₹19,400 | 10,500 ₹21,000 | 10,000 ₹20,000 |
| 3.00 | Carraige of Motor and Starter from from site to workshope and back to site complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 1 | Job | 9,500 ₹9,500 | 10,000 ₹10,000 | 11,000 ₹11,000 |
| 4.00 | Fixing of coupling bushes and pins into 3 phoase star delta starter. For pump motor complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 18 | Nos | 135 ₹2,430 | 150 ₹2,700 | 140 ₹2,520 |
| 5.00 | Providing and instaling of single core copper flexible cable 50mm sq.HRFR of havells/KEI make confirming to IS694:2010/IS 17048 from Pannel box to MCCB complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 45 | Rmt | 1,780 ₹80,100 | 1,840 ₹82,800 | 1,800 ₹81,000 |
| 6.00 | Providing and instaling of single core copper flexible cable 70mm sq. HRFR of havells/KEI make confirming to IS694:2010/IS 17048 from Pannel box to moter set 1 at Talogi complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 25 | Rmt | 2,380 ₹59,500 | 2,500 ₹62,500 | 2,450 ₹61,250 |
| 7.00 | Providing and instaling of 3 Phase capacitor 20KVR for the induction motor set 1 at Talogi complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 2 | Nos | 6,850 ₹13,700 | 7,250 ₹14,500 | 7,100 ₹14,200 |
| 8.00 | Providing and instaling of 3 Phase 3pin changeover Switch of 320A rating confirming to IS/IEC:60947-3 complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 1 | No | 11,900 ₹11,900 | 13,000 ₹13,000 | 12,200 ₹12,200 |
| 9.00 | Providing and instaling Main Switch fuse disconnector 200Amp. confirming to IS/IEC:60947-1& 3 complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 2 | Nos | 23,500 ₹47,000 | 25,000 ₹50,000 | 24,000 ₹48,000 |
| 10.00 | Providing and instaling MCCB 200A confirming to IS/IEC 60947-2 confirming to IS/IEC:60947-2 complete with in all respect within all leads & lifts as per the direction & to the entire satisfaction of the Engineer-in-charge. | 1 | No | 32,400 ₹32,400 | 33,200 ₹33,200 | 32,700 ₹32,700 |
Tender Value
₹3.8 L
EMD Value
₹7,600
Closing Date
9 Oct 2025, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Kullu
SH Rewinding of 100 HP motor repair of starter and panel board at Talogi pump house
2025_HPIPH_116347_1
6179-81 Talogi Pump
Open Tender
Civil Works
60 days
Talogi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Executive Engineer
₹7,600
12 Mar 2026
30 Sept 2025
10 Oct 2025
30 Sept 2025
9 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid