Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.3 Cr
EMD Value
₹4.3 L
Closing Date
20 Mar 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Anand Irrigation Division Anand.
Modernization of Petlad Branch by Providing C.C Lining Between Ch.26844 Mt to 30162 Mt Under jurisdiction of Anand Irrigation Sub Division,Anand (P-4)
276784
16 of 2025-2026
Open
Miscellaneous Works
Works
Anand
9 documents required · 8 mandatory · 1 optional
₹6,000
Yes
Executive Engineer Anand Irrigation Division Anand
₹4.3 L
Yes
18 Feb 2026
18 Feb 2026
18 Feb 2026
20 Mar 2026
18 Feb 2026
Bill Of Quantities
Name of work :- Modernization of Petlad Branch by Providing C.C
Lining Between Ch.26844 Mt to 30162 Mt Under
jurisdiction of Anand Irrigation Sub Division, Anand
Estimated Rate Total Amount Without
Estimated Rate Total Amount Without
Sr.No Item Quntity Unit
without GST GST Rs.
Clearing the shrubs, like akadas, weeds
and other vegetables including depositing
the same outside and burning etc.
complete from canal beds and both slopes
of the banks, for canal with discharge. For
Canals Above - 250 Cusecs.
Clearing the silt from the CANAL BED /
SLOPE by digging the same to the required
bed level and gradient including depositing
the excavated earth regularly in spoil bank
2 for utilizing the same preparing the banks 13189.00 Cum 57.10
after breaking clods as and where directed
for lead upto 50 m. and all lifts. (BY
Scrapping out the old Plaster and Cleaning
3 the surface including racking out the 10321.00 Sqm 86.60
joints 20mm deep etc.
Dismentalling the brick pitching including
sorting out and stacking of the usefull
materials on site including removing the
rubbish etc. complete as directed. - 12 cm
Earth work in embankment using selected
soil, soft & hard murrum excavated from
approved borrow area / village tanks etc.
Including conveying, spreading in uniform
layers, breaking clods and dressing to the
designed canal section etc. with lead upto
500 m and all lift .(For canals having
capacity beyond 300 Cusec) ( By
Machinery ) Considering Lead upto 2 km .
(0.5km to 2 km- Lead charges)
Estimated Rate Total Amount Without
Estimated Rate Total Amount Without
Sr.No Item Quntity Unit
without GST GST Rs.
Compaction for making embankment for
canal by laying in regular layers of 15 cm
in thickness including breaking clods to
25 mm size incl. light rolling by suitable
6 rollers with slight watering to facilate 1955.00 Cum 27.70
rolling and dressing the side slopes etc.
Providing and laying plain/reinforced
cement concrete lining of M 15 (MSA
mm) in bed, side slopes and curvature
including batching, mixing, transporting,
placing, vibrating, smooth finishing, curing
including dewatering where required.
((MACHINERY BASED By Batchmix Plant
& Transit Mixer - WITH PAVER
MEMBRANE CURING) 7.5 cm thick lining
in Bed/slope - with membrane curing,
Machinery based with Paver
Providing groove and filling expansion joint
of size 12 mm wide and 25 mm deep in
canal lining during construction with two
coats of primer and filled with bituminious
and fine sand in proportion of 2:1, as
directed etc. complete.
Excavation for foundation in all sorts of
soil including yellow sandy gravelly soils
,soft & hard murrum etc. in dry condition
including depositing the excavated stuff in
uniform layers in banks or as and where
9 directed etc. complete for lead upto 500 m 757.80 Cum 102.40
and all lift. (BY MACHINERY)Excluding
Providing & Laying in position with Batch Mix
Plant & Transit Mixer "DESIGN MIX" cement
concrete using cement sand and crushed
aggregate for C.C./ R.C.C work including
necessary formwork, centering, scaffolding,
compaction by vibrator, curing as directed with
all lead & lift etc complete without dewatering
and excluding the cost of steel
reinforcement.(B) For Pier and Abutments /
Wing wall / Head wall / Return wall / Dowel
wall etc. (g) Concrete grade M-15 and MSA-20
Providing videography on the ocassion of
function or for ongoing construction work
including dubbing, titeling etc.complete
including cost of cassette/CD (a) For
Estimated Rate Total Amount Without
Estimated Rate Total Amount Without
Sr.No Item Quntity Unit
without GST GST Rs.
Providing & Laying in position "NOMINAL
MIX" cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for C.C./R.C.C work incl.
necessary formworks centering,
scaffolding, compaction by vibrator, curing
as directed with all lead & lift etc complete
12 Without Dewatering and excluding cost of 22.70 Cum 3935.00
steel reinforcement. (A) For Foundation
concrete / General purpose (a) C. C.
Nominal Mix, M-15 and MSA-20 mm
Providing and laying burnt brick masonary
in foundation ordinary portland cement
mortar 1:5 proportion including, curing
etc. complete for all leads and lifts.
Providing cement plaster in thickness and
proportion as under including, smooth
finishing, curing, scaffolding etc. complete
14 for all leads and lifts. 210.10 Sqmt 193.20
Providing and fixing in position ( different
diameter ) NP2 R.C.C. pipe with collar
including filling and caulking the joints
with cement mortar 1:1 proportion,
15 finishing to design grade and level curing 88.00 Meter 535.80
etc. complete for all leads and lifts.225
mm dia NP-2 Pipe
New/Reparing of steel gate including
providing basic stell materia; M.S. Shaft
plate, angles, channels etc. incl. fabriction
16 transporting to site & Erection and 671.00 Kg 127.20
painting etc. complete.
Estimated Rate Total Amount Without
Estimated Rate Total Amount Without
Sr.No Item Quntity Unit
without GST GST Rs.
Providing and fixing the iron rod for steel
gates including providing big size thread
17 and finishing as required etc comp.(a) - dia 13.20 Meter 1268.50
of bar 38 mm rod for 1 Rmt length.
Providing and fixing heavy duty CI nut for
steel gates as directed etc complete.
(a)- for 38 mm dia rod and height of nut is
Providing and fixing heavy duty thrust
beareing for 38mm dia rod length. Height
19 of Nut is 120x120x100 cutting 11.00 No. 800.00
Total Rs…(Without GST)
Rs. Four Crore Twenty Eight Lac Sixty Two Thousand Four Hundred Two & Sixty Three Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 -The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-
10/2017CementConsumption/16/CDate:11/05/2017asstated in
S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Deputy Executive Engineer
Anand Irrigation Sub Division
Executive Engineer
Anand Irrigation Division
Percentage Breakup Calculation
Name of work :- Modernization of Petlad Branch by Providing C.C Lining Between Ch.26844 Mt to 30162 Mt Under jurisdiction of Anand Irrigation Sub Division, Anand
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost Labour % Cement Total Cement Cost Cement Steel per Total Steel Steel % Bitumen Total Bitumen Bitume PoL Per Total PoL cost PoL % Machiner Total Machinery Machiner Other Total Other Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost Labour % Cement Total Cement Cost Cement Steel per Total Steel Steel % Bitumen Total Bitumen Bitume PoL Per Total PoL cost PoL % Machiner Total Machinery Machiner Other Total Other Other TOTAL cost Total Item Cost Total %
Estimated according to Per Unit Per Unit % Unit Cost Per Unit Cost n% Unit y Per Cost y% Comodity Comodity Cost Comodity % per Unit
but may be estimated Rs. Unit Per Unit
Clearing the shrubs, like akadas, weeds and other vegetables
including depositing the same outside and burning etc.
canal with discharge. For Canals Above - 250 Cusecs.
Clearing the silt from the CANAL BED / SLOPE by digging the
same to the required bed level and gradient including
depositing the excavated earth regularly in spoil bank for
utilizing the same preparing the banks after breaking clods as
and where directed for lead upto 50 m. and all lifts. (BY
Scrapping out the old Plaster and Cleaning the surface
Dismentalling the brick pitching including sorting out and
stacking of the usefull materials on site including removing
Earth work in embankment using selected soil, soft & hard
murrum excavated from approved borrow area / village tanks
etc. Including conveying, spreading in uniform layers,
breaking clods and dressing to the designed canal section etc.
beyond 300 Cusec) ( By Machinery ) Considering Lead upto
2 km . (0.5km to 2 km- Lead charges)
Compaction for making embankment for canal by laying in
regular layers of 15 cm in thickness including breaking clods
watering to facilate rolling and dressing the side slopes etc.
Providing and laying plain/reinforced cement concrete lining
of M 15 (MSA 20 mm) in bed, side slopes and curvature
including batching, mixing, transporting, placing, vibrating,
smooth finishing, curing including dewatering where required.
((MACHINERY BASED By Batchmix Plant & Transit Mixer -
WITH PAVER MEMBRANE CURING) 7.5 cm thick lining in
Bed/slope - with membrane curing, Machinery based with
Providing groove and filling expansion joint of size 12 mm
wide and 25 mm deep in canal lining during construction
sand in proportion of 2:1, as directed etc. complete.
Excavation for foundation in all sorts of soil including yellow
sandy gravelly soils ,soft & hard murrum etc. in dry
condition including depositing the excavated stuff in uniform
lead upto 500 m and all lift. (BY MACHINERY)Excluding
Providing & Laying in position with Batch Mix Plant & Transit
Mixer "DESIGN MIX" cement concrete using cement sand and
crushed aggregate for C.C./ R.C.C work including necessary
formwork, centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc complete without
dewatering and excluding the cost of steel reinforcement.(B)
wall / Dowel wall etc. (g) Concrete grade M-15 and MSA-20
Percentage Breakup Calculation
Name of work :- Modernization of Petlad Branch by Providing C.C Lining Between Ch.26844 Mt to 30162 Mt Under jurisdiction of Anand Irrigation Sub Division, Anand
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost Labour % Cement Total Cement Cost Cement Steel per Total Steel Steel % Bitumen Total Bitumen Bitume PoL Per Total PoL cost PoL % Machiner Total Machinery Machiner Other Total Other Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost Labour % Cement Total Cement Cost Cement Steel per Total Steel Steel % Bitumen Total Bitumen Bitume PoL Per Total PoL cost PoL % Machiner Total Machinery Machiner Other Total Other Other TOTAL cost Total Item Cost Total %
Estimated according to Per Unit Per Unit % Unit Cost Per Unit Cost n% Unit y Per Cost y% Comodity Comodity Cost Comodity % per Unit
but may be estimated Rs. Unit Per Unit
Providing videography on the ocassion of function or for
ongoing construction work including dubbing, titeling
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by mass
and machine mix for C.C./R.C.C work incl. necessary
formworks centering, scaffolding, compaction by vibrator,
Dewatering and excluding cost of steel reinforcement. (A) For
Foundation concrete / General purpose (a) C. C. Nominal
Mix, M-15 and MSA-20 mm
Providing and laying burnt brick masonary in foundation
ordinary portland cement mortar 1:5 proportion including,
Providing cement plaster in thickness and proportion as
complete for all leads and lifts.
Providing and fixing in position ( different diameter ) NP2
R.C.C. pipe with collar including filling and caulking the
joints with cement mortar 1:1 proportion, finishing to design
mm dia NP-2 Pipe
New/Reparing of steel gate including providing basic stell
materia; M.S. Shaft plate, angles, channels etc. incl.
Providing and fixing the iron rod for steel gates including
providing big size thread and finishing as required etc
Providing and fixing heavy duty CI nut for steel gates as
directed etc complete.
Providing and fixing heavy duty thrust beareing for 38mm dia
42862402.63 Rs. Four Crore Twenty Eight Lac Sixty Two Thousand Four Hundred Two & Sixty Three Paise Only
Deputy Executive Engineer Executive Engineer
Anand Irrigation Sub Division Anand Irrigation Division
Cement Requirement Statement
Name of Work :-
Modernization of Petlad Branch by Providing C.C Lining Between Ch.26844 Mt to 30162 Mt Under jurisdiction of Anand
Irrigation Sub Division, Anand
Rate of Total cement
Sr No. Item No. Description of Item Qty. Unit consumption in requirement
bags per unit (in bags)
Providing and laying plain/reinforced cement concrete lining of M 15 (MSA 20 mm)
in bed, side slopes and curvature including batching, mixing, transporting, placing,
vibrating, smooth finishing, curing including dewatering where required.
1 7 ((MACHINERY BASED By Batchmix Plant & Transit Mixer - WITH PAVER 78358.00 Sqmt 0.45
MEMBRANE CURING) 7.5 cm thick lining in Bed/slope - with membrane curing,
Machinery based with Paver
Providing & Laying in position with Batch Mix Plant & Transit Mixer "DESIGN MIX"
cement concrete using cement sand and crushed aggregate for C.C./ R.C.C work
including necessary formwork, centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc complete without dewatering and
excluding the cost of steel reinforcement.(B) For Pier and Abutments / Wing wall /
Head wall / Return wall / Dowel wall etc. (g) Concrete grade M-15 and MSA-20 mm
Providing & Laying in position "NOMINAL MIX" cement concrete using cement,
sand and crushed aggregate by mass and machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding, compaction by vibrator, curing as
3 12 directed with all lead & lift etc complete Without Dewatering and excluding cost of 22.70 Cum 6.00
steel reinforcement. (A) For Foundation concrete / General purpose (a) C. C.
Nominal Mix, M-15 and MSA-20 mm
Providing and laying burnt brick masonary in foundation ordinary portland cement
mortar 1:5 proportion including, curing etc. complete for all leads and lifts.
Rate of Total cement
Sr No. Item No. Description of Item Qty. Unit consumption in requirement
bags per unit (in bags)
Providing cement plaster in thickness and proportion as under including, smooth
finishing, curing, scaffolding etc. complete for all leads and lifts.
Deputy Exectutive Engineer Exectutive Engineer
Anand irrigation subdivision Anand Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice-16 of 2025-26 Online.pdf
1 Front Page.- PB 26844-30162 m.pdf
2.1 Certificate PB 26844-30162 m.pdf
2.2 Certificate PB 26844-30162 m.pdf
3 Notice Inviting online Tender PB 26844-30162 m.pdf
4.BOQ-PB 26844-30162 m.pdf
5.SBD BOOK 26844-30162.pdf
6.SBD Volume -II Work and Site Condition PB 26844-30162 m.pdf
7.SBD Volume -II General Technical Specification PB 26844-30162 m.pdf
8.SBD Volume -II ITemwise Technical Specification PB 26844-30162 m.pdf
9. Testing Norms PB 26844-30162 m.pdf
10 SPECIAL CONDITION new PB 26844-30162 m.pdf
11 Drawing PB 26844-30162 m.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .