Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.7 LAccepted-AOC ARJUN DROPATI COMPLEX H NO 1312 A AUCHIT WADO TIVIM BARDEZ GOA | NORTH GOA | GOA | 403001 | L1 | Accepted-AOC L1 bidder has given letter non
extension of tender validity and requested to cancel the tender to
release emd | |
| 2 | L2₹41.5 L+₹1.9 L (4.66%)Rejected-Finance | L2 | Rejected-Finance Second Lowest bidder | |
| 3 | L3₹45.6 L+₹5.9 L (15.0%)Rejected-Finance | L3 | Rejected-Finance Third Lowest bidder | |
| 4 | Rejected-Technical H NO 815 16 1 B WARD NO 06 MAHAKHAJAN DHARGAL PERNEM GOA | PERNEM | NORTH GOA | GOA | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Ibrahim Construction L2 | abdul khadar L3 | P A ABOOBAKER L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt clay, gravel, moorum of all verieties shingles, pebbles, all types of conglomarets, laterite rock, soft rock, disintegrated or weathered rock, fissured shattered, decomposed rock, and such materials either in full or parts,as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/ dewatering including setting out constructed of shoring and bracing, removel of stump and other deleterious matter, dressing of sides and bottom back filling the excavated earth to the extend required and dispesing of the surplus excavated earth/rock including all leads and lifts etc as per specification and drawing and directed by Engineer -in-Charge | 216 | cum | 100 ₹21,600 Lowest | 150 ₹32,400 | 100 ₹21,600 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 54 | cum | 1,100 ₹59,400 | 1,300 ₹70,200 | 300 ₹16,200 Lowest |
| 3.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:A) All works upto plinth level | 632 | cum | 5,000 ₹31,60,000 | 5,600 ₹35,39,200 | 4,750 ₹30,02,000 Lowest |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete. | 981 | sq.m | 240 ₹2,35,440 | 200 ₹1,96,200 Lowest | 300 ₹2,94,300 |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall earth and earth retaining structure complete as directed by the Engineer in Charge B) 75 mm dia | 290 | metre | 150 ₹43,500 | 100 ₹29,000 Lowest | 100 ₹29,000 Lowest |
Tender Value
₹53.6 L
EMD Value
₹1.1 L
Closing Date
23 Mar 2023, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Development of nallah in Survey No. 18 5 A, 18 5 B, 18 5 C, 18 5 D, 18 5 E and 18 5 F at Punola ward No.3, Ucassaim, V.P. Ucassaim Bardez in Aldona Constituency
2023_WRD_7297_1
No.6-9/WDI/WRD/ASW/2022-23/e -21/Sr1
Open Tender
Miscellaneous Works
Item Rate
180 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹1.1 L
14 Nov 2025
21 Feb 2023
24 Mar 2023
21 Feb 2023
23 Mar 2023
21 Feb 2023
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .