| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.6 CrAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹27.5 Cr+₹2.0 Cr (7.70%)Rejected-Finance 9 PPCL COLONY UDAY VIHAR HARIDWAR BYPASS DEHRADUN UTTARAKHAND | DEHRADUN | DEHRADUN | UTTARAKHAND | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹29.1 Cr+₹3.5 Cr (13.7%)Rejected-Finance VILL AND P O JAHU NEAR SHIV MANDIR TEHSIL BHORANJ DISTT HAMIRPUR HP | JAHU | HAMIRPUR | HIMACHAL PRADESH | L-3 | Rejected-Finance L-3 Bidder | |
| 4 | L-4₹31.7 Cr+₹6.1 Cr (24.0%)Rejected-Finance H NO 66 SECTOR 27A CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | 160019 | L-4 | Rejected-Finance L-4Bidder | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-The bid is non responsive and will not be opened in persuance to Para 8 of e procurement notice and ITB clause 22.1 read with Bid data sheet. |
Tender Value
₹29.5 Cr
Closing Date
21 Oct 2021, 3:00 pmClosed
Chief Engineer-cum-Project Director
Chief Engineer-cum-Project Director, State Roads Project, HPRIDC, Nirman Bhawan, Nigam Vihar, Shimla-171002
Please Refer Tender Document
2021_HPRID_52223_1
IN-HPRIDC-144270-CW-RFB DATED 13.09.2021
Open Tender
Civil Works - Roads
Item Rate
540 days
Billaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,900
The Chief Engineer Cum Project Director, HPRIDC
Exempted
Shimla
21 Feb 2022
13 Sept 2021
21 Oct 2021
13 Sept 2021
21 Oct 2021
1 Oct 2021
28 Sept 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BILL NO. 1 : SITE CLEARANCE AND DISMANTLING | |||||
| 1.01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness complete as per drawing and Technical Specification No. 201 and in accordance to the MISP and C-ESMP | 3 | Hectare | - | - |
| 1.02 | Dismantling of flexible pavements of Bituminous courses and disposal of dismantled materials upto a lead of 1000 meters, stacking serviceable and unserviceable materials separately including all labour, hire charges of all machineries complete as per drawing and Technical Specification No. 202 and in accordance to the MISP and C-ESMP | 635 | Cum | - | - |
| 1.03 | Dismantling of flexible pavements of Granular courses and disposal of dismantled materials upto a lead of 1000 meters, stacking serviceable and unserviceable materials separately including all labour, hire charges of all machineries, the recovery of dismantled stone aggregates shall be made @ rate Rs. 600/- per cum for a minimum quantity of 747 cum from total dismantled granular layer on pro rata basis as per increase of decrease in the quantity of actual work carried out. the recovery shall be done on pro-rata basis from contractor each running bill along with this item. Rate of Stone Recovery is Exclusive of Royalty as applicable, complete as per drawing and Technical Specification No. 202 and in accordance to the MISP and C-ESMP | 1,867.5 | Cum | - | - |
| 1.04 | Dismantling of Plain cement concrete in existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per drawing and Technical Specification No.. 202 and Section 2800 and in accordance to the MISP and C-ESMP | 132 | Cum | - | - |
| 1.05 | Dismantling of Stone / brick structures in existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per drawing and Technical Specification No.. 202 and Section 2800 and in accordance to the MISP and C-ESMP | 93 | Cum | - | - |
| 1.06 | Dismantling of Reinforced concrete in existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per drawing and Technical Specification No.. 202 and Section 2800 and in accordance to the MISP and C-ESMP | 410 | Cum | - | - |
| 1.07 | Dismantling of Guide Rails / Fencing / Kerb / Gutters / Pipes in existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per drawing and Technical Specification No.. 202 and Section 2800 and in accordance to the MISP and C-ESMP | 16 | Lm | - | - |
| 2BILL NO. 2 : EARTHWORK | |||||
| 2.01 | Roadway excavation and drainage in all kinds of soil in all heights and depths in all kinds of soil by manual /mechanical means including saturated soil comprising of ordinary soil , soft rocks, hard rocks, chiseling/wedging out of rock (where blasting is prohibited ) and other intermediate classification of soil, setting out true to the required line, grade width cutting and trimming of side slopes and level as shown on the drawings including dressing trimming and compacting the cut formation in accordance with requirement of lines grades and cross fall, cross sections and cut material transportation to the embankment location within all lifts and leads complete as per drawing and Technical Specification No. 301 and all cut material except stone (which can be recovered) will be the property of contractor and disposal of excess material & un-usable material shall be disposed with lead upto 1000m in accordance to the MISP and C-ESMP. The recovery of stone shall be made @ rate Rs. 548/- per cum for a minimum quantity of 796 cum from total excavated quantity on prorata basis as per increase of decrease in the quantity of actual earthwork carried out. the recovery shall be done on pro-rata basis from contractor each running bill along with this item. Rate of Stone Recovery is Exclusive of Royalty as applicable. | 15,921.1 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_78046.xls
BOQ Document • 0.41 MB
83492709.pdf
Tender Document • 0.42 MB
VOL-I-BID-DOCUMENT.pdf
Tender Document • 2.67 MB
VOL-III-TECH-SPECS.pdf
Tender Document • 1.41 MB
VOL-III-ESMP.pdf
Tender Document • 7.83 MB
VOL-IV-TENDER-DRAWING-1-50.pdf
Tender Document • 10.67 MB
VOL-IV-TENDER-DRAWING-51-100.pdf
Tender Document • 14.94 MB
VOL-IV-TENDER-DRAWING-101-143.pdf
Tender Document • 9.82 MB
VOL-II-FINANCIAL.pdf
Tender Document • 0.29 MB
83492711.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .