Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹33.8 L+₹33,798.35 (1.01%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical 0 GHAIR SALAWAT KHAN RAMPUR RAMPUR RAMPUR RAMPUR UTTAR PRADESH 244901 | RAMPUR | UTTAR PRADESH | 244901 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹33.8 L
EMD Value
₹34,000
Closing Date
8 May 2024, 11:00 amClosed
SE EDC RAMPUR
office of the SE EDC RAMPUR
69/2023-24/EDCRIncreasing load capacity of overloaded Transformer and Construction of line etc. under Business Plan 2024-25, EDD-I, Rampur
2024_PVVNL_923782_1
69/2023-24 (EDCR)
Open Tender
Electrical Works
Lump-sum
45 days
office of the SE EDC RAMPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
SE EDC RAMPUR
₹34,000
5 Jul 2024
1 May 2024
8 May 2024
1 May 2024
8 May 2024
1 May 2024
Amount
Carriage of the following material from Store Centre, Rampur to work site including loading & unloading.
MS Channal (Dropper)
MS Channal (Top)
T-off Chennal
Sub Station Angle
ST Pole 11 Mtr Long
11/0.4 KVA T/F 100 KVA
11/0.4 KVA T/F 250 KVA
LT AB Cable3*240sqmm
ABC Cable 3*120+1*95+1*16 sqmm
ABC Cable 3*95 sqmm
LT AB Cable3.5*240 sq mm
LT XLPE Cable 3.5*150 sq mm
LT XLPE Cable 3.5*240 sq mm
LT XLPE Cable 3.5*400 sq mm
LT XLPE Cable 1*240 sq mm
LT XLPE Cable 1*400 sq mm
ACSR Weasal Conductor
Fuse Set
single-Phase Distribution Box
3-Phase Distribution Box
Earthing Complete
Stay set Complete
Polymeric 11 KV Pin Insulator
Polymeric 11 KV Disc Insulator with fitting
other line material
11/0.4 KV 100 KVA T/F(Recived Back Site to Store)
11/0.4 KV 160 KVA T/F(Recived Back Site to Store)
Dismantling of HT & LT connection & replace of follwoing capacity T/F from substation double poles/plinth by Healthy transformer(including connection) and loading and unloading with associated work at both ends within 70 kms.
100 KVA trasnformer
160 KVA trasnformer
Installing of Healty Transformer, connection HT & LT of follwoing capacity T/F at substation Single Pole/ double poles/plinth by Healthy transformer(including connection) and loading and unloading with associated work at both ends within 70 kms.
Increasing load capacity of overloaded TF by 100 KVA trasnformer
Increasing load capacity of overloaded TF by 250 KVA trasnformer
a) Double pole structure Excavation of foundation pit in size of 75x45cm having depth of 1/6th of the full length of the support(pole)Erection of support(pole) complete with providing and fixing of all clamps made of MS flat of size 75x8 mm. an other accessories . The work includes fabrication work and fixing of cross bracing sets 3.5 Mtr from MS Angle 65x65x6 mm/50x50x6 mm. The work includes cutting holes and providing MS Bolts of 16x40 mm size in the middle of the cross bracing with 1 No. sparing washer of proper size.
STP 11 Mtr long
Grouting of support in CC 1:4:8(cement, sand & 40 mm. brick ballast) Grouting will be done in the block of size 45x45cmx1/6th of full length of the support upto ground level, 30 cm plinth above the ground level with CC 1:3:6 (cement, course sand and stone grit) with muffing. The work includes back filling and proper ramming etc. a) Double support
STP 11 Mtr long
Grouting of Stay Rods(20x1800)mm including all work of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:8(cement, sand, 40mm brick ballast) including back filling of soil and proper ramming etc.
Fixing, tightening and nozelling of stay wire with stay rod with the pole of required tension by providing stay clamps.
Earthing of support with MS Earth Rod of (20x2500)mm long including excavation of pit and driving MS Rod 3.0 M apart from support and 0.5 M below the ground level and connecting below the earth electrodes with the help of GI wire No. 8SWG and earthing lugs.
fixing of Sub Station Angle as per RESPO Norms and as per direction of Supervising Engineer.
fixing of 11 KV Pin Insulator with Pin as per RESPO Norms and as per direction of Supervising Engineer.
fixing of 11 KV Disc Insulator with Fitting as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of ACSR Weasal Conductor as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of LT AB Cable3*240sqmm as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of ABC Cable 3*120+1*95+1*16 as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of ABC Cable 3*95 as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of LT AB Cable3.5*240 sq mm per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of LT XLPE Cable 3.5*150 sq mm as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of LT XLPE Cable 3.5*240 sq mm as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of LT XLPE Cable 3.5*400 sq mm as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of LT XLPE Cable 1*240 sq mm as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding ofLT XLPE Cable 1*400 sq mm sq mm per RESPO Norms and as per direction of Supervising Engineer.
Installing/Fixing of Fuse Set as per RESPO Norms and as per direction of Supervising Engineer.
Installing of TPMO as per RESPO Norms and as per direction of Supervising Engineer.
Installing of Single-Phase Distribution Box as per RESPO Norms and as per direction of Supervising Engineer.
Installing of 3-Phase Distribution Box as per RESPO Norms and as per direction of Supervising Engineer.
Construction of plinth for 250 KVA Transformer 2x2x1.5 M with fencing as per RESPO Norms and as per direction of Supervising Engineer (Material for plint and fencing will be provide by the Contractor)
Providing and fixing Clamp with Nut and Bolts as per direction of Supervising Engineer.
Providing and fixingClamp with Nut and Bolt for DP as per direction of Supervising Engineer.
Providing and fixing Clamp for T-off Channel as per direction of Supervising Engineer.
Providing and fixing Clamp I Hooks as per direction of Supervising Engineer.
Providing and fixing Lugs as per direction of Supervising Engineer.
Providing and fixing GM Connector 300 amp as per direction of Supervising Engineer.
Providing and fixing Stone Pad as per direction of Supervising Engineer.
Providing and fixing Danger Board with Clamp as per direction of Supervising Engineer.
Providing and fixing Barbed Wire as per direction of Supervising Engineer.
SAFDAR HUSAIN CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .