| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | L1 | Accepted-AOC LOWEST AND APPROVED BY PANCHAYATH BOARD | |
| 2 | L2₹16.1 L+₹16,079 (1.01%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST |
| Sl No | Description | Qty | Unit | M.P. KRISHNAN L1 | M P RAVEENDRAN L2 |
|---|---|---|---|---|---|
| 1.00RETARRING | |||||
| 1.00 | 2.14.2.A:Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 (II) By Mechanical Means (A) Bituminous Courses | 10.92 | cum | 419.96 ₹4,585.96 Lowest | 424.2 ₹4,632.26 |
| 1.00 | 2.15:Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 3.23 | cum | 1,720.4 ₹5,556.89 Lowest | 1,737.78 ₹5,613.03 |
| 1.00 | 4.1.A.2:Granular Sub-base with Well Graded Material (Table 400.1)(A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material | 3 | cum | 3,138.43 ₹9,415.29 Lowest | 3,170.13 ₹9,510.39 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 70.44 | cum | 3,469.55 ₹2,44,395.1 Lowest | 3,504.6 ₹2,46,864.02 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 565.6 | sqm | 79.41 ₹44,914.3 Lowest | 80.21 ₹45,366.78 |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 565.6 | sqm | 18.57 ₹10,503.19 Lowest | 18.76 ₹10,610.66 |
| 1.01 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 30.81 | sqm | 395.28 ₹12,178.58 Lowest | 399.27 ₹12,301.51 |
| 1.01 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 99.5 | sqm | 306.67 ₹30,513.67 Lowest | 309.77 ₹30,822.12 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,945 | sqm | 15.49 ₹30,128.05 Lowest | 15.65 ₹30,439.25 |
Tender Value
₹16.1 L
EMD Value
₹40,170
Closing Date
20 Sept 2025, 6:00 pmClosed
ASSISTANT ENGINEER
LID AND EW SECTION KANNAPURAM
LRRP 2024 25 Kalliasseri LAC Sl No 2098 Boys School Karshaka Vayanashala Road Kannapuram GP Kalliassery BP
2025_LSGD_796338_1
ET01/2025/AE/LSGD/KNPM/2025-26
Open Tender
Civil Works - Roads
Item Rate
120 days
KANNAPURAM GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹40,170
Yes
11 Nov 2025
12 Sept 2025
22 Sept 2025
12 Sept 2025
20 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1317741.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .