| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.8 L+₹18,620.52 (11.7%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.8 L+₹20,352.71 (12.8%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹2.3 L
EMD Value
₹5,750
Closing Date
2 Nov 2024, 5:00 pmClosed
ASSI. ENGINEER
LIDEW KUMILY
BRIDGE
2024_LSGD_699629_35
2/ETENDER/AE/KLY/2024-25
Open Tender
Civil Works - Others
Item Rate
90 days
KUMILY
Please refer Tender documents.
7 documents required · 7 mandatory
₹590
₹5,750
16 Jan 2025
26 Oct 2024
4 Nov 2024
26 Oct 2024
2 Nov 2024
26 Oct 2024
Amount
CONSTRUCTION OF IRON BRIDGE
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
Thanveer hussain
Nalukandathil
Bidder Name
SPR CONSTRUCTION
Nalukandathil
Thanveer hussain
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1093377.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .