Loading…
Loading…
Tender Value
₹90,000
EMD Value
₹1,800
Closing Date
12 Sept 2026, 4:00 pm
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
PLEASE REFER NIT
2026_RDPR_322421_66
e-NIT No. 77 REW Rajouri of 2026 Dated 24-08-2026
Open Tender
Civil Works
Percentage
30 days
REW OFFICE RAJOURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
REVENUE HEAD
₹1,800
Yes
28 Aug 2026
28 Aug 2026
14 Sept 2026
28 Aug 2026
12 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Trench excavation by manual means in trenches for all kind of soil 80%b & O/R 20% | 5.54 | Cum | 612 | ₹3,390.48 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.79 | Cum | 4,826.5 | ₹3,812.94 |
| 3 | Providing and laying in positionReinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10graded stone aggregate 40 mm nominal size) | 8.36 | Cum | 5,673.4 | ₹47,429.62 |
| 4 | Providing and laying in positionReinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 40 mm nominal size) | 0.59 | Cum | 9,821.85 | ₹5,794.89 |
| 5 | Reinforcement required for RCC work | 59.04 | Qtl | 123.4 | ₹7,285.54 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columnsCentering and shuttering including strutting, propping etc. and removal of form work. | 2.1 | sqm | 286.35 | ₹601.34 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columnsCentering and shuttering including strutting, propping etc. and removal of form work. | 1.43 | sqm | 718.2 | ₹1,027.03 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columnsCentering and shuttering including strutting, propping etc. and removal of form work. | 12.6 | sqm | 628.5 | ₹7,919.1 |
| 9 | Carriage of sand/bagri for 40 km by MT and 100 m by HL | 11.19 | Cum | 918.79 | ₹10,281.26 |
| 10 | Add C/O of CIB | 1 | no | 1,500 | ₹1,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_1081932.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].