Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.6 LAccepted-Finance R O VILL AIMA P O TEHSIL PALAMPUR DISTT KANGRA H P | L-1 | Accepted-Finance Found Lowest One | |
| 2 | L-2₹11.6 L+₹262.71 (0.02%)Rejected-Finance HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 176093 | L-2 | Rejected-Finance High rate quoted | |
| 3 | L-3₹11.8 L+₹17,035.82 (1.46%)Rejected-Finance | L-3 | Rejected-Finance High rate quoted | |
| 4 | L-4₹12.3 L+₹67,502.55 (5.80%)Rejected-Finance | L-4 | Rejected-Finance High rate quoted | |
| 5 | L-5₹12.5 L+₹90,071.26 (7.74%)Rejected-Finance | L-5 | Rejected-Finance High rate quoted |
Tender Value
₹15.0 L
EMD Value
₹29,968
Closing Date
14 Mar 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION BAIJNTH
Construction of pump house cum attendant room intake chamber desilting chamber
2022_HPIPH_57572_1
HPIPH 1577-1641 DT. 06.03.2022
Open Tender
Civil Works
Item Rate
180 days
BAIJNATH
Please refer Tender documents.
9 documents required · 9 mandatory
₹400
EXECUTIVE ENGINEER
₹29,968
Yes
30 Jun 2022
7 Mar 2022
14 Mar 2022
7 Mar 2022
14 Mar 2022
7 Mar 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in all kinds of soil such as pick jumper work blasting soft or hard rock or by chiselling where blasting is prohibited soft/hard rock in all lifts stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge in all leads and lifts. | 100.02 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 8.81 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 0.36 | Cum | - | - |
| 4 | Providing and laying cement concrete 1:3:6(1cement:3sand:6 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 2.05 | Cum | - | - |
| 5 | Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | - | - | - | - |
| 6 | Suspended floors, roofs, landings and shelves and their supports, balconies,beams, girders, bressumers and cantilevers upto all floor level complete involving acomplete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 12.74 | Cum | - | - |
| 7 | Providing and laying cement concrete 1:1.5:3(1cement:1.5sand:3 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | - | - | - | - |
| 8 | In foundation, footings, basis of columns and the like and mass concrete in all leads and lifts as per direction and to the entire satisfaction of the Engineer-in-charge. | 3.07 | Cum | - | - |
| 9 | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 11.9 | Cum | - | - |
| 10 | Suspended floors, roofs, landings and shelves and their supports, balconies,beams, girders, bressumers and cantilevers upto all floor level complete involving acomplete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 0.24 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Form8.pdf
Tender Document • 0.51 MB
Termsandconditions.pdf
Tender Document • 0.01 MB
Tendernotice_1.pdf
Tender Document • 0.07 MB
form6.pdf
Tender Document • 0.03 MB
BOQ_86870.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .