Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.4 L
EMD Value
₹3,411
Closing Date
7 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, P. H. Works Division, GWSSB, Mehsana
Providing ,Supplying and Laying of Pipe Line From Proposed Tube well to Existing U/G Sump at Dedana Village Under Rejuvination programme 2026-27.
368161
02/2026-27
Open
Water Supply/ Sanitation Works
Works
Mehsana
8 documents required · 6 mandatory · 2 optional
₹600
Executive Engineer, P. H. Works Division, GWSSB Mehsana
₹3,411
23 Nov 2026
23 Nov 2026
23 Nov 2026
7 Dec 2026
23 Nov 2026
90 days
Estimated Cost: Rs. 3,41,181=00
Executive Engineer
Gujarat Water Supply & Sewerage Board
P.H. Works Division, MEHSANA
Volume-III, PRICE BID
(1) Name of Work:- “Providing ,Supplying and Laying of Pipe Line From Proposed
Tube well to Existing U/G Sump at Dedana Village Under Rejuvination
programme 2026-27”
(2) The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
(3) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(4) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder
shall not be permitted to withdraw his bid on this account.
be free supplied from the by client.
(6) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
quoted in Schedule-B only will be considered for price evaluation & shall
form a part of the Contract Agreement.
and evaluation.
(9) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1
to Schedule-C/5 separately for Schedule-C. The total shall be inline to the
price quoted in Schedule-C. The total shall be carried forward to Schedule-B
for comparison and evaluation.
(10) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with
pro rata basis.
(11) Each item is to be individually priced online and the amounts shall be added
Schedules of prices shall be left blank except where the item description
requires the item to be priced on "as applicable” basis. The item shall not be
priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item
description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The
prices shall allow for all the works covered under the bid and all liabilities
and contractual obligations whether separately specified or not. Items
against which no prices are quoted shall not be separately paid for and the
Volume-III, PRICE BID
bidder shall be deemed to have covered the cost of execution of such items
(according to the requirements of the bid document) in the prices quoted
for other items.
executed for satisfactory working/safety of the system as specified, will not
be separately paid for by the Employer when executed and shall be deemed
to be already covered by other items and rates listed in the price sheets No
extra payment shall be given for any item which is required to complete and
perform the project.
the pendency of the Contract. In case of any discrepancy noted in the
arithmetic corrections if any will be considered for financial evaluation of
(14) Schedule ‘D gives the basis of interim payment for construction of civil
(15) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates shall
also be deemed to include any works and setting out that may be required
to be carried out for laying out of all the works involved.
(16) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(18) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(19) The prices quoted shall also include the cost of materials utilized for
(20) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
only and the prices shall include all the equipments / materials / accessories
and services required as per the specifications. The bidder shall fill in the
(22) The amount to be quoted for O & M / year shall be as per Volume-II,
General Conditions of Contract, Clause No. 1, and Security Deposit.
(23) 1% of the value of work will be deducted from the Running bill against
labour cess which is non refundable.
(24) Third Party Inspection / CSC agency will be deployed by GWSSB and charges
of the same will be borne by GWSSB.
Volume-III, PRICE BID
(25) Any expenditure incurred by inspection/ CSC agency for the work
misinformed by the contractor and charges of inspection/ CSC agency
without any work due to misinformation shall be recovered from the
(26) The rates quoted shall be exclusive of GST, but inclusive of all other taxes,
duties which shall not be paid extra. While GST will be paid for admissible
part of actual work done at the approved tender rates and tender conditions
of price variations. GST shall be paid as per prevailing rates at the time of
payment. The TDS shall be deducted at source as per provision of IT rules
and GWSSB Policy.
(27) The rates should be quoted exclusive of GST but inclusive of all other taxes
as per Volume-1 (B), General Conditions of Contract, Clause No.
(28) The process requires that the bidder shall quote his price for the work
prices shall remain firm and fix during the entire period of performance of
the contract except price variation allowed for supply of MS/DI/PVC/GI pipe
as per Volume-II Clause No. 59, General Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on
the basis of work done of individual items and rates quoted against those
particular items only.
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified
in the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution
No. GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from
time to time and remaining amount if any shall be recovered from the final
bill before releasing the security deposit of the work. The contractor shall
furnish the statement showing the quantity of quarried materials / minerals
from whom purchased ( with full address of the seller) and copies of the bills
for purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty
payment to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along
with the evidence within time limit. In case of non compliance entire
responsibility shall be rest with the agency and required amount shall be
recovered from any due amount of the agency.
(32) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(33) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the
state of Gujarat. For arriving at the difference in procurement prices due to
introduction of GST it will be open for the Board to ask for original invoices,
lorry receipt, weigh bridge slips, payment details and such other documents
as may be required for the purpose.
Volume-III, PRICE BID
(34) The claim of contractor regarding GST shall have to be backed by
documentary evidence substantiating the actual payment of tax duly
certified by the competent tax authority. The final decision regarding the
quantum of claim amount to be recovered or reimbursed shall be of the
competent authority of the GWSSB and shall be binding on the contractor.
Signature of contractor Deputy Executive Engineer
Public Health Sanitary Unit
Executive Engineer
Public Health Works Division
Volume-III, PRICE BID
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “Providing ,Supplying and Laying ofPipe Line From Proposed Tube well to
Existing U/G Sump at Dedana Village Under Rejuvination programme 2026-27 ”The
bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 2 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed
price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within 15 months, inclusive of monsoons, from the
date or receipt of Letter of Acceptance issued to us by you.
Volume-III, PRICE BID
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-II, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID
NAME OF SCHEME – NMC Based Modhera Group RWSS Ta. Becharaji/Chanasma Di:
Name of Work:- “Providing ,Supplying and Laying of Pipe Line From Proposed Tube
well to Existing U/G Sump at Dedana Village Under Rejuvination programme 2026-27 ”
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are to
Rate at which the material
Place of Delivery
Sr. will be charged to the
Particular Qty. (Transportation
given separately)
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled
in by the Engineer in Charge at the time of issue tender.
2. The transportation cost of the materials supplied by the Department shall be
paid as shown in Schedule B.
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but
available with the dept. will be issued on request to the contractor. (for use in this
contract only) at prevailing market rates or departmental issue rates whichever is
5. All the surplus materials supplied by the deptt. As mentioned in schedule-A should
be handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their
correctness and soundness by the contractor before taking the delivery of the
materials from the Government.
7. Necessary cement will be purchased by the agency at their own cost from open
market as per specification.
8. The persons of firm submitting the Tender should see that rates in the above
schedule are filled up by the Executive Engineer, on the issue of form prior to the
submission of the Tender.
Volume-III, PRICE BID
9. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Deputy Executive Engineer
Public Health Sanitary Unit
Executive Engineer
Public Health Works Division
Volume-III, PRICE BID
SUMMARY (SCHEDULE-B)
Name of Work:- “Providing ,Supplying and Laying of Pipe Line From Proposed Tube
well to Existing U/G Sump at Dedana Village Under Rejuvination programme 2026-27”
Sr. No. Name of Work Amount Rs.
I / We am / are willing to carry out the work at______________________________% above / Below
percent (should be written in figure and words) of the estimated rates mentioned above amount of my /
our tender works out as under.
Estimated amount put to tender : Estimated amount put to Tender
Deduct________% Below Add________% above
Signature of contractor Deputy Executive Engineer
Public Health Sanitary Unit
Executive Engineer
Public Health Works Division
Volume-III, PRICE BID
Name of Work:- Providing ,Supplying and Laying of Pipe Line From Proposed Tube well to
Existing U/G Sump at Dedana Village Under Rejuvination programme 2026-27
Taluka :- Becharaji District :- Mehsana
Qty. Unit Item Rate Per Amount
Providing and supplying in standard length ISI mark rigid
unplasticised PVC pipes suitable for potable water with
ring fit joint including cost of rings, as per IS
specification no. 4985/1988 including all local and
central taxes, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to the
departmental stores and including cost of jointing
meterial etc. complete.
1.One coupler / ring shall be provided with each full
length pipe cost of which is included in rates below.
2. 3% (Three) Discounted rate to be consider for Coupler
3. Rate for PVC Resin as Rs. 91739/MT (Price Without
(B) Test pressure 6 kg per sq.mt
1145 Rmt 110 mm Dia 199.00 Rmt
Providing and supplying ISI mark G.I PIPES with
couplings of following class and diameter including all
taxes,insurance,transportation, freight charges. Octroi,
inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS-1239)
10 Rmt 100 mm Dia G.I. Pipe (M.D) 864.00 Rmt
Providing and supplying at Store or site of work
including Freight, Loading, Unloading, Stacking,
Insurance and all taxes etc. complete.
(i) P.V.C. F.T.A.(moulded) 110 x 90 mm Dia (Market
(ii) P.V.C.Elbo (moulded) 110 mm Dia. (GWSSB SOR
Volume-III, PRICE BID
4 No. (iii) M.S. Flange 80 mm Dia (Market rate) 100.00 No.
4 No. (iv) G.I. Bend 90 Degree 80 mm Dia (Market rate) 200.00 No.
Providing and supplying ISI mark CI D/F Sluice
Valvesas per IS-14846 ( Latest Edition ) Of Following
class and Diameter including all taxes, insurance,
transportation,freight charges, octroi, inspection charge,
loading, unloading, conveyance to departmental store,
stacking etc. complete.
PN-1 With hand wheel /cap operated (PD type short
1 No. (i) Sluice Valve 100 mm Dia. 3563.00 No.
Excavation for pipe line trenches incl. all safety
provisions using site rails and stacking excavated stuff up
to a lead of 90 mts. cleaning the site etc. complete for
lifts and strata as specified.
a) In all sorts of soil and soft murrum Up to 1.5 mt.
687.00 Cum (1) Up to 1.50mt depth 89.00 Cum
Lowering, laying and jointing PVC pipes and specials of
following class and diameter including cost of
conveyance from stores to site of works including cost of
labour, material, except cement solvent, giving
satisfactory hydraulic testing as per ISI code.
1145 Rmt 110 mm Dia 19.00 Rmt
Lowering laying & jointing of G.I.pipe with G.I. specials
of following diameter in proper position, grade and
alignment as directed by Engineer in charge, including
cost of conveyance from store to site of work incl.cost of
labour, giving hydraulic testing etc. complete.
10 Rmt 100 mm Dia G.I. Pipe (M.D) 34.00 Rmt
Lowaring Laying & jointing in position following C.I./
D/F Reflux valve, Butterfly valves, Sluice valves and Air
valves including cost of all Labour, Jointing material
including nut bolts and giving satisfactory hydraulic
testing, etc. Complete.
Sluice valves, Butterfly Valves, Reflux Valves
Volume-III, PRICE BID
1 No. (i) Sluice Valve 100 mm Dia. 439.00 No.
Refilling the pipeline trenches incl. ramming, watering,
676.00 Cmt consolidating desposal of surplus stuff as directed within 22.00 Cmt
a radius of 3 km.
Rupees Three Lac Forty One Thousand One Hundred Eighty One only
I / We am / are willing to carry out the work at ___ % above / Below percent ( should be written in figure and words ) of the
estimated rates mentioned above amount of my / our tender works out as under.
Estimated amount Put to tender: Rs. ____________________ Estimated amount Put to tender: Rs. ______________________
In words Ruppes In words Ruppes ______________________________________
Signature of Deputy Executive Engineer
contractor P.H.Sanitary Unit
Volume-III, PRICE BID
Name of Work:- Providing ,Supplying and Laying of Pipe Line From Proposed Tube well
to Existing U/G Sump at Dedana Village Under Rejuvination programme 2026-27”
DETAILED SPECIFICATION
Providing and supplying in standard length ISI mark rigid unplasticised PVC pipes suitable for potable
water with ring fit joint including cost of rings, as per IS specification no. 4985/1988 including all local and
central taxes, transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to
the departmental stores and including cost of jointing meterial etc. complete. Note:-
1.One coupler / ring shall be provided with each full length pipe cost of which is included in rates below.
2. 3% (Three) Discounted rate to be consider for Coupler jointed pipe
3. Rate for PVC Resin as Rs. 91739/MT (Price Without GST)
(B) Test pressure 6 kg per sq.mt 110 mm dia
1. The contract shall be covering manufacturing, supplying and delivering of;
"Unplasticized PVC pipes along with elastomeric sealing ring (EPDM Rubber) Joint
bearing ISI Mark as per relevant Indian Standards with conforming to relevant
Indian Standard and sufficient quantity of Solvent Cement Solution"
2.1 UPVC PIPE WITH ELASTOMARIC SEALING RING:
The UPVC Pipes and UPVC Couplers to be manufactured supplied and delivered under
the scope of this contract shall be manufactured in accordance and conforming to
IS:4985-2000 or its latest revision or amendments with ISI certification mark.
Elastomeric sealing ring shall be in accordance with one of the types as per IS 5382 & it
shall be EPDM rubber ring with ISI mark.
2.2 UPVC COUPLERS AND SOLVENT CEMENT SOLUTION:
UPVC Couplers shall be conforming to IS:4985-2000 OR its latest revision/amendment.
Solvent Cement Solution shall be of a laboratory grade.
Volume-III, PRICE BID
3. TEMPERATURE VARIATIONS:
All the pipes and couplers to be manufactured, supplied and delivered shall be
subjected to weather conditions like sun, dust, rain, wind as available in State of
Gujarat. They shall be also subjected to carry and convey drinking water under variable
temperature conditions ranging from 4 C0 to 45 C0.
4. TENDER PRICE:
The tender price shall include all labour, material and machinery cost necessitated to
be utilized for;
a) Proper manufacturing of the Ring fit PVC Pipes/Couplers/Elastomeric sealing ring
manufacturing facility preferably certified with ISO: 9001:2000.
b) All tests required to be undertaken at manufacturers premises.
c) Transportation of the pipes/couplers either by Rail and/or Road services with all the
covers duly and appropriately insured.
d) Delivery of pipes/couplers with proper loading, unloading, stacking at GWSSB store
as indicated by Engineer-in-charge.
e) Further towards proper maintenance and discharged and all contractual obligations.
5. DELIVERY SCHEDULE:
The delivery schedule shall be as under,
Material shall be offered for inspection within 30 days from the date of R.P.A.D./ Fax /
Courier/Speed Post/ e-mail of order whichever is earlier. The total delivery time
shall be considered as 30 days + time for inspection (i. e. from the date of
inspection offered to the date of issue of inspection release note) by Third party
inspection agency (Normally within one week but maximum within two-week time)
+ 12 days transportation time. Extension of time limit on account of materials
rejected during the inspection will not be permitted. In case of emergency the delivery
period can be less with mutual consent.
Volume-III, PRICE BID
The methods of marking all the pipes to be delivered under scope of contract shall
ensure that all the information will remain legible even after transportation, storage in
open space etc. In general, the legible and indelible marking upon the goods shall
indicate the followings;
a. Manufacturer’s name or trade mark.
b. Outside diameter.
c. Class of pipe and pressure rating.
d. Batch or lot number.
e. ISI certification mark on each pipe.
f. Purchasers mark as “GWSSB” be inscribed.
g. Any other important matter that the manufacturer or purchaser deems fit to be
7. PACKING AND HANDLING:
When the materials are transported at Railway Risk special packing as per IRCA rules
are absolutely necessary for which the extra cost, if any, shall be borne in total by
The supplier shall have proper handling instruments/equipment’s and shall follow to a
suitable method of handling of pipes as may be approved by Engineer, while unloading
and stacking material in the stores.
8. MATERIAL & WORKMANSHIP:
8.1 General requirements of materials and workmanship shall mean any material or
article either raw or finished one required to be used in the manufacturing process of
8.2 All the material shall be new and of high quality.
8.3 In case, if material is not specified by relevant ISS for manufacturing part or the
whole as item, the supplier shall prepare specification in concurrence with
manufacturer and shall seek approval of Engineer prior to its use in the manufacture.
Volume-III, PRICE BID
B TECHNICAL SPECIFICATION FOR UPVC PIPES
1. SUPPLY OF MATERIAL
The general requirement relating to supply of material and manufacture of UPVC Pipes
and shall be conforming to the relevant Indian Standard Specification No 4985-2000 or
its latest revision. The pipe shall be with ISI mark.
1.1 UPVC Pipes and couplers shall be conforming to and manufactured as per IS:4985-
2000 OR with its latest revision or amendments.
1.2 The dimensions, material compositions, tests etc. shall be as per IS:4985-2000 or
with its latest revision or amendments. Each pipe shall be marked with ISI certification
1.3 The minimum & maximum wall thickness of the pipe shall be as specified IS:4985-
1.4 The colour of pipes & couplers to be supplied under the scope of this tender shall be
light grey as per Clause No. 10.1 i. e. Visual Appearance of IS 4985-2000.
1.5 PVC pipes with elastomeric sealing ring joint pipe it shall be as per IS specification
1.6 PVC Pipe should be purchase only as per attached Vender list herewith.
2. UPVC COUPLERS
2.1 The material composition for UPVC Coupler shall be as per the material composition
of UPVC Pipes as per IS:4985/2000.
2.2 The size, pressure & manufactures name shall be mark on couplers also to identify
the class of coupler either class and size should be marked on couplers too or colour
bends shall be as per the colour shown in IS:4985/2000 Clause No.10.1
3. SOLVENT CEMENT SOLUTION
The quality of solvent cement solution shall be of a good quality. For each size of pipes
offered for inspection sample coupler with two pieces from two pipes shall be coupled
with solvent cement offered for inspection (as these are supposed to be coupled in field)
Volume-III, PRICE BID
and this coupled unit shall be kept for hydraulic test at requisite pressure for the
stipulated time and observed for confirmation to IS:4985-2000.
4. Elastomeric sealing ring
It shall be in accordance with one of the types (Type - 1 to Type – 6) as per ISS
The sealing ring shall be EPDM rubber ring. The sealing ring shall be with ISI mark. The
lubricant applied for jointing of elastomeric rubber ring shall be of good quality and
comply the following specifications.
a. Must have paste like consistency and be ready for use, preferably soap jelly.
b. Has to adhere wet and dry surfaces of UPVC pipes and rubber ring.
c. Must be non-toxic.
d. Must be water soluble
e. Must non affecting physio-chemical and organoleptic properties of drinking water
carried on the pipe.
f. Must not have an objectionable odour.
g. Must not harmful to the skin.
5. The Tests as per ISS 4985-2000 will be carried out by Third Party Inspecting
agency fixed by GWSSB as follows.
5.1 Sampling: Sampling should be done as per Clause No. 12 of IS 4985-2000.
5.2 Visual Appearance: The visual appearance of pipes shall be as per Clause No.
5.3 Opacity: The opacity tests for pipes shall be carried out as per Clause No. 10.2 of IS
5.4 Reversion Test: The Reversion Test shall be carried out as per Clause No. 10.4 of
5.5 Vicat Softning Temperature Test: The Vicat Softning Temp. Test shall be carried
out as per Clause No. 10.5 of IS 4985-2000.
Volume-III, PRICE BID
5.6 Density: This test shall be carried out as per Clause No. 10.6 of IS 4985-2000. The
value shall be between 1.40 & 1.46.
5.7 Sulphated Ash Content Test: This test shall be carried out as per Clause No.
of IS 4985-2000. The Sulphated Ash Content in PVC Pipe shall not exceed 11%.
5.8 Resistence to External Blows at 00 C: This test shall be carried out as per Clause
6. LONG TERM TEST:
a) (1) Type test and internal hydrostatic pressure test (as per clause No.11.1 of IS-
4985-2000) and (2) Test for effect on Water (as per clause No. 10.3 of IS- 4985/2000)
shall be carried out as prescribed in IS-4985-2000 or its latest revision or amendments
at fixed intervals as specified by BIS.
However, GWSSB or Third party inspection / CSC agency fixed by GWSSB can verify
the certificates for these tests and representative of GWSSB or TPI can also remain
present during the tests if required and agency shall not have any objection for the
(b) Deposit for type test:
As per the clause No. 10(b) 1% of the value of the order quantity (excluding S.T.) is to be
kept in the deposit for type test till agency produces certificate based on samples
collected & tested as per BIS standards read with "SCHEME OF TESTING AND
INSPECTION - (STI)".
The rates quoted shall be inclusive of insurance, freight / carting charges, loading,
unloading & stacking at store or site of works with excise duty exemption in 110 mm
Dia. 6kg/Sq.cm PVC Pipe but exclusive of CST/GST (VAT). The CST/ GST (VAT) & entry
tax if any will be paid extra as actual on production of documentary proof of payment.
Inspection of materials at factory site shall be carried out jointly by the third party
Inspecting Agency as fixed by GWSSB & Concerned Executive Engineer of GWSSB when
pipe Length is more than 1000 Mtr.)
Volume-III, PRICE BID
The supplier on receipt of supply order from GWSSB shall intimate the third party
inspection agency & concerned Executive Engineer to carry out inspection as soon as
material is ready.
The inspection calls for PVC Pipes, Couplers, Solvent Cement and elastomeric sealing
ring shall be given. If the sealing rings are not offered for inspection, the inspection note
only for pipes will not be issued by third party inspection agency. Inspection will be
carried out normally within one weeks time and on receipt of such intimation the
inspecting agency will inspect the materials as per the specification and on satisfying
itself, will mark the inspection marks on all pipes and issue inspection note to supplier
and concerned consignee.
During third party inspection if the material offered for inspection is rejected by third
party Inspection agency in that case the third party inspection agency will mark the
rejection marking and will take other precautionary measures so that the rejected
material cannot be used in GWSSB in future.
Sample coupler and two pieces from two pipes shall be coupled with Solvent Cement
offered for inspection (as these are supposed to be coupled in field). This coupled unit
shall be kept for Hydraulic Test at requisite test pressure for the stipulated time and
shall be observed for conformation to IS:4985. Sample of pipes shall also be coupled
with elastomeric sealing ring and this test shall be carried out accordingly.
As regards post-delivery quality inspection of pipes, samples shall be collected by
Concerned officer/ Quality Control & Vigilance Unit of GWSSB & will be tested at
CIPET/GIRDA or any other agency as decided by GWSSB. Counter Reference Sample
shall also be collected at the time of joint Pre-delivery inspection in presence of the third
party inspection agency, the concerned Executive Engineer and the manufacturer with
their signatures on the sample and shall remain in custody of the concerned consignee
and will be tested at CIPET/GIRDA or any other agency as decided by GWSSB in case of
doubt. For inspection purpose the manufacture has to go in for line stencilling for
identifying size and class for proper separation. The stock of offered material shall be in
manageable batches with adequate space lie spreading the pieces etc. to permit proper
inspection and inspection authority to be present during stamping so as to ensure that
only actually cleared material is stencilled. The inspected material should not be loaded
after sunset to avoid inadvertent dispatch of wrong material.
Volume-III, PRICE BID
The payment shall be made as per Rmt basis.
Providing and supplying ISI mark G.I PIPES with couplings of following class and diameter including all
taxes, insurance, transportation, freight charges. Octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc. complete. (IS-1239)
100 mm Dia G.I. Pipe (M.D)
1. Galvanized M.S. Tubes with Coupling Medium duty (ISS-1239/1990
mm dia to 15 mm dia shall be ISI marked.
2. The G.I. Pipe shall be medium duty as per ISS 1239/1990 Specification.
3. Rate includes cost of loading, unloading, carting, insurance all taxes,
stacking at store or site of work as directed by Engineer in charge of work.
4. Payment shall be made in RMT basis for pipes as per dia. of pipes and for
Necessary bend, tee, elbows, nipple, reducers, flange, nut bolts, rubber packing
grease etc. shall be provided by contractor without any extra cost except if
specified in Schedule-B.
5. Rates includes supply, laying jointing, loading, unloading, stacking, octroi
all taxes breaking masonry and C.C. wall, making holes and repairing after
completion of work including carting of pipes, threading as per requirement
providing and laying all specials and jointing materials etc. complete. the whole
work of pipe line shall be tested for water tightness as per standard practice or
by pumping the water in pipe line.
6. Payment shall be made on Rmt. basis as per Schedule-B. 30% payment
shall be with held for want of hydraulic testing it will be released after
satisfactory testing of pipe line.
Labour charge for lowering, laying & jointing GI pipes with specials incl. testing
of pipes etc. comp. The PVC pipes shall be supplied by the department including
joints solution etc as per schedule “ A “ and same shall be carted by the
contractor at his own cost from the department store to the site white G.I.
Should be procured by contractor at his own cost. Every care shall be taken in
Volume-III, PRICE BID
carting all material to site. contractor shall have to pay for any damage done to
the pipes either in carting, loading, unloading.
Mode of Measurement and payment:
1.1 The rate shall be for one meter of pipe laid including all specials and
fittings, Cutting and waste shall not be paid separately. The running length shall
be measured on the trench and curves along the center line over the pipes and
special correct up to one Cms.
1.2 Payment of untested section shall be made at 70% of the tendered
rate. Remaining 30% payment shall be made on giving satisfactory hydraulic test
by the contractor.
2 UNIT OF RATE: The unit of rate shall be per Rmt.
Providing and supplying at Store or site of work including Freight, Loading, Unloading, Stacking, Insurance
and all taxes etc. complete.:-
(i) P.V.C. F.T.A.(moulded) 110 x 90 mm Dia
(ii) P.V.C.Elbo (moulded) 110 mm Dia.
(iii) M.S. Flange 80 mm Dia
(iv) G.I. Bend 90 Degree 80 mm Dia
Specials as per site requirement shall be supplied by the contractor. The specials
should be as per standard and shall be got approved by the Engineer in charge before
being used. The specials should be perfectly in working condition and having necessary
threads holes etc. as per standard.
PVC specials should be as per IS standard specification and should be price make. All
the specials should be suitable for PVC pipes for which it is being used.
The payment shall be made on No. basis as per Payment schedule.
Item No.4 and 8:
Providing and supplying ISI mark CI D/F Sluice Valvesas per IS-14846 ( Latest Edition ) Of
Following class and Diameter including all taxes, insurance, transportation,freight charges,
octroi, inspection charge, loading, unloading, conveyance to departmental store, stacking etc.
Volume-III, PRICE BID
Lowaring Laying & jointing in position following C.I./ D/F Reflux valve, Butterfly
valves, Sluice valves and Air valves including cost of all Labour, Jointing material
including nut bolts and giving satisfactory hydraulic testing, etc. Complete.
Sluice valves, Butterfly Valves, Reflux Valves
PN-1 With hand wheel /cap operated (PD type short body)
(i) Sluice Valve 100 mm Dia.
1. The work shall be carryout as per the description of the item and as per
specification laid down in PWD Hand book vol. I & II and instruction of Engineer
2. The sluice valve shall be of approved quality and as per ISS 780 OR latest
revision with ISI mark with hand wheel. Rate including necessary freight loading
unloading, carting, insurance & all taxes etc. complete.
3. Sluice valve and should be procured from the approved and ISI marked.
4. For sluice valve necessary jointing materials such as nuts bolts rubber
packing shall have to be supplied by the contractor without extra cost. It shall
be fixed as per the instruction of Engineer in charge.
5. No leakage shall be observed if observed shall be rectified by the
contractor without any extra cost.
6. The payment shall be made on number basis.
Excavation for pipe line trenches incl. all safety provisions using site rails and stacking
excavated stuff up to a lead of 90 mts. cleaning the site etc. complete for lifts and strata as
a) In all sorts of soil and soft murrum Up to 1.5 mt. Depth.
(1) Up to 1.50mt depth
1.1 The excavation for trenches will generally, refer to open excavation for trenches in
wet / dry conditions for pipe laying work.
2.0 CLEARING OF SITES:
2.1 The site on which the pipelines are to be laid and shown on plan and the area
required for setting out and other operations shall be cleared and all obstruction loose
Volume-III, PRICE BID
stones and materials, rubbish of all kinds, stumps, brushwood as trees shall be
removed as directed the roots shall be entirely grubbed up.
2.2 The products of the clearing to restocked in such a place and in such a manner,
as directed by the engineer in charge.
2.3 In jungle clearings, all trees not specially marked for preservation, bamboo’s
jungle wood and brushwood shall be cut down their roots grubbed up. All wood and
materials from the clearing shall be the property of the Board shall be arranged as
directed by the Board Engineer or his authorized agent, the material pronounced as
useful by the Engineer will be conveyed and properly stacked as directed within the
specified limit. Unless materials will be burnt or otherwise disposed of as directed.
2.4 All holes or hollows whether originally existing or produced by digging up roots,
shall be carefully filled up with earth, well earth, well rammed levelled off, as may be
3.0 SETTING OUT:
The center lines of all pipe trenches etc. shall be given by the Engineer-in-charge and it
will be the responsibility of the contractor to install substantial reference marks, bench
marks, etc. and maintain then as long as required true to line, level curve and slopes.
The contractor shall assure full responsibility for alignment, and dimension of trench.
The labour materials etc. required for setting out and establishing benchmarks and
other reference marks shall be arranged by the contractor at his own cost.
4.0 EXCAVATION:
4.1 The excavation incl. Bailing out of water for the pipe trenches shall also incl.
Removal of all materials of whatever nature and whether wet or dry condition necessary
for laying of pipelines exactly in accordance with alignment, levels grades and curves
shown on the plans or as directed by the Engineer-in-charge. Trenches shall be
excavated to the exact width and depth according to the size of pipe and the sides shall
be left vertical as for as possible or according to the angle of repose various soils. Unless
there is a specific extra provision in the contract for shoring and strutting or for cutting
side slopes the contractor shall at his own cost do the necessary shoring and strutting
or cutting of slopes to a safe of repose or both approved by the Engineer-in-charge. The
Volume-III, PRICE BID
contractor shall notify the Engineer before starting excavation to enable him to take
cross sectional levels for purpose of measurements before the ground is disturbed. The
bottom of the trenches shall be levelled both longitudinally and transversely or slopped
as directed by the Engineer. The contractor shall at his own cost to remove such
portions of boulders or rocks, as are rectified to make the bottom of the trench level. No
filling shall be allowed to bring the trench to level. If by contractor’s mistake excavation
is made deeper than shown on the plans and if ordered by the Engineer the extra depth
shall have to be made with selected excavated stuff only with watering, remedying etc.
as directed, by the Engineer and at the cost of the contractor. Other hard excavation
shall be cleared of all sorts and loose materials and cut to firm surface, either level,
stepped as directed by the Engineer. The Engineer may order such charges in the
dimensions and alignment of pipe trench as may be deemed necessary to secure
satisfactory cover over pipeline. The contractor shall, at his own expense, make
provision for bailing out of draining water and the trenches shall be kept free of water,
during laying work.
After each excavation is completed, the contractor shall notify the Engineer to that effect
and no laying of pipeline will be allowed to laid until Engineer has approved the depth
and dimensions of trenches level and measurements.
5.0 SHORING AND STRUTTING:
Shoring & strutting and dewatering if required shall have to be carried out by the
contractor, for which any extra charge will not be paid
During excavation if water connections, sewage connections, telephone lines khalkuwa
(soak pits) etc. are damaged by the contractor, the same shall have to be restored by the
contractor without any extra payment.
6.1 The trenches shall be strongly fenced and red light signal shall be kept at night
and arrangement of watchman to prevent accidents should be done, sufficient care
protective measure shall be taken to see that the excavation shall not affect or damage
the adjoining structure. The contractor shall be entirely responsible for any injury to life
and damage to the properties etc. Necessary protection work such as guide ropes,
crossing places, barricades, caution boards etc. shall be provided by the contractor.
Volume-III, PRICE BID
7.0 The excavation in all sorts of soil, hard murrum, soft rock or hard rock or any
type of soil shall have to be carried out up to the required depth by the agency
8.0 DISPOSAL OF EXCAVATED STUFF
8.1 No excavated stuff from trench are to be placed even temporarily nearer than
meter or greater distance up to 90 meter or as prescribed by the Engineer from the
outer edge of trench. All excavated material will be the property of the board. The rate of
excavated includes sorting out of useful materials and stacking then separately as
directed within specified lead. The excavated stuff suitable and useful for refilling or for
other use shall be stacked at convenient places. The materials not useful in any wet
shall be disposal off as directed by the Engineer from the outer edge of trench.
8.2 The site should be cleared off on completion of work.
9.0 ADDITIONAL REQUIREMENTS
At the joints of pipes, the trench shall be excavated to an additional depth of 15 cm. and
width of 30 cm. And length of 15 cm. beyond the edge of collar on both the sides or as
directed. The rate includes for such extra excavation made at the joints. The trenches
shall be excavated perfectly in straight line. The bottom of the trench shall be kept as
per invert level or as directed. To maintain the proper slope the usual method of site
rails and boning rods shall be adopted. The contractor shall have to provide and fix and
maintain sight rails and boning rod without any extra cost.
If the contractor fails or makes delay to give hydraulic test of the pipe line laid in any of
the section, without any genuine reason, he shall be responsible to get any part of the
length trenches refill in such case i.e. before tasting for safety of pedestrian and/or
vehicular traffic as found necessary by the engineer-in-charge without any extra cost. If
found necessary any directed by the Engineer-in-charge. The contractor shall have to
excavate the refilled trenches, during hydraulic test without any extra cost.
At all road crossings, trenches shall be excavated only for half width of the road and
pipe shall be laid. The other half shall be excavated only after back filling over the laid
pipeline is done so as to make it suitable for the traffic. The contractor shall provide
direction when the pipeline is to be laid along the road as required and shall maintain
Volume-III, PRICE BID
the diversion or any part of it, without any extra cost. At all road crossings, the pipe
shall be laid below the crest of read.
9.2 The contractor shall break the road surface by excavation chiselling to the exact
width and length as shown on the drawing or as directed by the Engineer-in-charge.
The excavated stuff shall be deposited in uniform layers to avoid mixing with other kind
of materials at non-objectionable place or as directed by the Engineer-in-charge.
10.1 Excavation in excess of the sanctioned dimensions shall not be measured not
paid for and if an ordered by the Engineer the contractor shall have to fill up the excess
depth with excavated stuff with watering ramming etc. (Completed as specified) for
trench without any extra payment to the contractor.
10.2 The item of excavation shall include unless and otherwise mentioned.
(a) Clearing of site
(b) Setting out work including all materials and labour.
(c) Providing and subsequently removing, shoring and strutting outing
(d) Excavation and removal and staking of all excavated stuff as directed.
(e) Necessary protection including labour materials equipment etc. to ensure
safety and protection against risk or accident.
(f) Providing facilities for inspection and damage to property if caused during
progress of work.
(g) Compensation for injury to life and damage to property if caused during progress
(h) Restoring of water supply connections, sewer connections, telephone
lines, khalkuwa soapiest etc. if damaged by contractor without extra
(i) Dewatering of excavated pit trench during the progress of work.
Volume-III, PRICE BID
(j) Clearing the site on completion of works directed by the Engineer.
UNIT OF RATE: The unit of rate shall be per Cum.
Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost
of conveyance from stores to site of works including cost of labour, material, except cement solvent,
giving satisfactory hydraulic testing as per ISI code.
Pipe and fittings shall be lifted from manufacturing site to site of work at his own cost.
During transportation any damage shall be occure to pipes for fittings the replacement
of pipes or fittings given by the contractor at-least own cost.
Before laying the pipes it shall be brushed throughout the length so that dust or soil
can be removed. The fittings should also be brushed. The pipes shall be laid in trenches
in straight line.
The jointing material such as coupling & Solution etc. to be supplied by the contractor.
All the specials such as bends, tees, reducers etc. shall be fixed as per instruction of
engineer-in-charge in the pipeline. The pipe shall be hydraulically tested during the
testing no leakage shall be observed. If leakage observed, it shall be set right by the
contractor at its own cost as per the instruction of Engineer-in-charge.30% payment
shall be made after hydraulic testing of pipe line.
Payment shall be made on running metre basis.
Lowering laying & jointing of G.I.pipe with G.I. specials of following diameter in proper position,
grade and alignment as directed by Engineer in charge, including cost of conveyance from store to
site of work incl.cost of labour, giving hydraulic testing etc. complete.
100 mm Dia G.I. Pipe (M.D)
1) Pipe and fittings shall be lifted from manufacturing site to site of work at
his own cost. During transportation any damage shall be occur to pipes for
fittings the replacement of pipes or fittings given by the contractor at-least own
Volume-III, PRICE BID
2) Before laying the pipes it shall be brushed throughout the length so that
dust or soil can be removed. The fittings should also be brushed. The pipes shall
be laid in trenches in straight line.
3) The jointing material such as coupling to be supplied by the contractor.
4) All the specials such as bends, tees, reducers etc. shall be fixed as per
instruction of engineer-in-charge in the pipeline.
5) The pipe shall be hydraulically tested during the testing no leakage shall
be observed. If leakage
observed, it shall be set right by the contractor at its own cost as per the
instruction of Engineer-in-charge.30% payment shall be made after hydraulic
testing of pipe line.
6) Payment shall be made on Running meter basis.
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of
surplus stuff as directed within a radius of 3 km.
The work shall be carried out as per the description of the item in Schedule-B & as per
the specification laid down in P.W.D. handbook vol. I & II.
The excavated earth shall be used after getting approval of the Engineer in charge
proper consolidation and watering shall be done.
The payment shall be made on Cum basis.
Deputy Executive Engineer
Public Health Sanitary Unit
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular 1_3-A Certificat Paripatra.pdf.pdf
pdf • 1.11 MB
Circular 1_Badhakam Shramyogi.PDF
pdf • 0.74 MB
Circular 1_DMO_2631_21-Apr-2023_872.pdf
pdf • 0.24 MB
Circular 1_Insaurance1.jpg
jpg • 1.82 MB
Circular 1_Insaurance2.jpg
jpg • 1.98 MB
Circular 1_Labour Fee Circular.pdf
pdf • 0.09 MB
Circular 1_Mat.Test.GR.pdf
pdf • 0.13 MB
Circular 1_SIGN BOARD.pdf
pdf • 0.30 MB
Circular 1_SPECIAL CLAUSE.pdf
pdf • 0.67 MB
Circular 2_DTP circular p-1.pdf
pdf • 2.15 MB
Circular 2_DTP circular p-2.pdf 2.pdf
pdf • 1.41 MB
Circular 2_DTP circularp-3.pdf
pdf • 1.39 MB
Circular 2_DTP circularp-4.pdf
pdf • 2.43 MB
Circular 3_DTP circular p-5.pdf
pdf • 2.82 MB
Circular 3_DTP circular p-6.pdf
pdf • 2.23 MB
Circular 3_DTP circular p-7.pdf
pdf • 2.55 MB
gst latest.pdf
DMO_2941_01-Apr-2026_744.pdf
DEDANA PRICE BID (1).pdf
Dedana GCC.pdf
vol 1 dedana.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .