Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-Finance 6 RAMESHWAR COMPLEX OPP OSCAR CITY SADHU VASVANI ROAD RAJKOT 360007 | RAJKOT | GUJARAT | 360007 | L1 | Accepted-Finance Meeting NIT criteria | |
| 2 | L2₹22.3 L+₹6.4 L (40.0%)Accepted-Finance 1001 SHIVALIK ABAISE 100 FEET ROAD OPP ANANDNAGAR APARTMENT PRAHALADNAGAR AHMEDABAD AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | L2 | Accepted-Finance Meeting NIT criteria | |
| 3 | Not Admitted-Fee/PreQual/Technical ASHOK MARG LUCKNOW UTTAR PRDESH 226001 | LUCKNOW | UTTAR PRADESH | 226001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹49,615
Closing Date
16 Jul 2020, 6:00 pmClosed
S.K. Gupta AGM (E E)
Electrical Engg. Office, Rajkot Airport, Rajkot
Comprehensive Maintenance of Split Type A.C., Cassette Type AC, Water Coolers and Centralized Reverse Osmosis System (200 and 25 LPH capacity) for Two Years (2020-2022) at C.A. Rajkot.
2020_AAI_52408_1
AAI/RAJ/AGM(E-E)/NIT-03/20-21
Open Tender
Electrical Works
Works
730 days
Rajkot Airport
PQQ as per NIT
12 documents required · 12 mandatory
₹1,180
Airports Authority of India
₹49,615
24 Jul 2020
7 Jul 2020
21 Jul 2020
7 Jul 2020
16 Jul 2020
7 Jul 2020
7 Jul 2020 - 15 Jul 2020
Amount
Comprehensive maintenance of 1.5 ton split type A/C (including compressor) for one month as per the special condition attached. (No. of AC 12 X 24 months = 288)
Comprehensive maintenance of 1.5 ton split type A/C (without compressor) for one month as per the special condition attached. (No. of AC 39 X 24 months = 936)
Comprehensive maintenance of 2 ton split type A/C (including compressor) for one month as per special condition attached. (No. of AC 21 X 24 months = 504)
Comprehensive maintenance of 2 ton split type A/C (without compressor) for one month as per special condition attached. (No. of AC 18 X 24 months = 432)
Comprehensive maintenance of 3 ton 3 phase tower type split A/C (including compressor) for one month as per special condition attached. (No. of AC 4 X 24 months = 96)
Comprehensive maintenance of 3 ton 3 phase cassette type A/C (including compressor) for one month as per special condition attached. (No. of AC 7 X 24 months = 168)
Comprehensive maintenance of 4 ton 3 phase tower type split A/C (including compressor) for one month as per special condition attached. (No. of AC 9 X 24 months = 216)
Comprehensive maintenance of 4 ton 3 phase cassette type A/C (including compressor) for one month as per special condition attached. (No. of AC 20 X 24 months = 480)
Comprehensive maintenance of Water Coolers of various capacities / make for one month as per the special condition attached. (No. of WC 9 X 24 months = 216)
Installation, Testing, Commissioning of split type AC of 1.5 / 2.0 TR. capacity including all necessary connections, gas charging (as per requirement) and making interconnection wiring between indoor & outdoor units etc. complete as per the instructions of engineer in charge.
Dismantling of 1.5 / 2.0 TR A/C including all necessary connections, wiring between indoor and outdoor units etc. complete as per the instructions of engineer in charge.
Supply and fixing of copper pipe and nitrile insulation for 1.5 / 2.0 TR AC complete as per the instructions of engineer in charge, etc. as required.
Supply and fixing of stand for 1.5 / 2.0 TR AC outdoor unit : a) Floor mounting stand
Supply and fixing of stand for 1.5 / 2.0 TR AC outdoor unit : b) Wall mounting stand
Servicing i/c. replacing minor spare of RAJ make air cooler, installed at CISF barrack as per direction of E.I.C. (No. of Air Cooler 50 X 2 times = 100, as and when required.)
Supply spare of RAJ air cooler (As and when required). A) Air cooler electric motor 1/8 HP ( i/c )
Supply spare of RAJ air cooler (As and when required). b) Air cooler pump medium
Supply spare of RAJ air cooler (As and when required). c) Air cooler swing motor
Supply spare of RAJ air cooler (As and when required). d) Air cooler fan 16"
Supply spare of RAJ air cooler (As and when required). e) Air cooler outer net ice cool
Comprehensive Maintenance of 2 nos. X 200 LPH capacity centralized R.O. Plant complete with all accessories including consumable and all spare parts but excluding the R.O. membrane. Complaints and breakdown should be attended on priority.
Operation of 200 LPH R.O. plant on all days including Sundays days and holidays in one shift.
Supply of RO membrane compatible for BOQ item no.21.
Comprehensive maintenance of ION Exchange Make 5 nos. X 25 LPH R.O. unit including consumable items and all spare parts i/c. membrane etc. complete as required.
Comprehensive maintenance of 2 nos. of storage type water cooler with inbuilt RO of capacity of 40 Ltr/hr with rotary compressor & having 80 Ltr storage capacity etc. complete as required. (Consumable RO Filter not included in this scope)
Supply of RO membrane for 80 PSS RO (Product code : GWPDPCR8000000)
Supply of 10" PF candle for 80 PSS RO (Product code : GWPDPCR8000000)
Supply of 10" AC Block for 80 PSS RO (Product code : GWPDPCR8000000)
Submission of water portability report (i/c. Chemical & Bacteriaological) from govt. lab / approved govt. lab of sample collected from the location as per instruction of E.I.C. Report to be submitted once in three month.
CENTRE TAP ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .