Tender Value
₹16.8 L
EMD Value
₹17,000
Closing Date
23 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchayat (R&B) Division, Valsad
New Gujarat Pettarn -2024-25 (10Percent State Level) , Construction of Smasanbhumi at VillageKakadkopar , Tal. Kaprada, Dist. Valsad. (Re-invite)
296938
51 of 2025-26
Open
Civil Works - Buildings
Valsad
5 documents required · 5 mandatory
₹1,500
Executive Engineer, Panchayat (R&B) Division, Valsad
₹17,000
16 Apr 2026
16 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
Name of work :- New Gujarat Pettarn -2024-25 (10% State Level) , Construction of Smasanbhumi at Village
Kakadkopar , Tal. Kaprada, Dist. Valsad.
: : BILL OF QUANTITIES : :
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
1 52.90 Excavation for foundation upto 1.5M depth 254.37 Rupees Two Cu.mt
including sorting out and stacking of Hundred Fifty
useful materials and disposing of the Four and Paise
excavated stuff upto 50 Meter lead. Thirty Seven Only
( C ) Hard Murrum
2 27.34 Excavation for foundation depth from 1.50m 287.48 Rupees Two Cu.mt
to 3.00m including sorting out and Hundred Eighty
stacking of useful materials and Seven and Paise
disposing of the excavated stuff upto 50 Forty Eight Only
Meter lead. ( D )Soft rock not
required blasting
3 7.18 Providing and laying cement concrete 1:4:8 ( 2680.21 Rupees Two Cu.mt
1 Cement : 4 Coarse sand : 8 hand broken Thousand Six
stone aggregate 40mm nominal size ) and Hundred Eighty
curing complete excluding the cost of and Paise Twenty
formwork and reinforcement for reinforced One Only
concrete wirk(A) Foundations and Plinth
4 7.75 Providing and laying cement concrete 1:2:4 ( 3948.18 Rupees Three Cu.mt
1 Cement : 4 Coarse sand : 4 -graded Thousand Nine
stone aggregate 20mm nominal size ) and Hundred Forty
curing complete excluding the cost of Eight and Paise
formwork and reinforcement for reinforced Eighteen Only
concrete wirk in (A) Foundations,
footings,Base or columns and mass
5 4.10 Providing and laying ordinary cement 10040.66 Rupees Ten Cu.mt
concrete 1:2:4 ( 1 Cement : 4 Coarse sand : Thousand Forty
4 -graded stone aggregate 20mm nominal and Paise Sixty
size ) and finishing smooth with curing etc. Six Only
complete including the cost of formwork but
excluding the cost of reinforcement for
R.C.C. work in:(B) COLUMNS, up to gl-pl
6 63.17 Filling available excavated earth 130.39 Rupees One Cu.mt
(excluding rock) in trenches. plinth, Hundred Thirty
sides of foundations etc. in layers not and Paise Thirty
exceeding 20cm. in depth consolidating Nine Only
each disposited layer by ramming and
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
7 8.46 Providing and laying ordinary cement 7665.60 Rupees Seven Cu.mt
concrete 1:2:4 ( 1 Cement : 4 Coarse sand : Thousand Six
4 -graded stone aggregate 20mm nominal Hundred Sixty
size ) and finishing smooth with curing etc. Five and Paise
complete including the cost of formwork but Sixty Only
excluding the cost of reinforcement for
R.C.C. work in:(A) BEAMS, gb-pb
8 640.74 Filling foundation and plingth with murrum or 289.06 Rupees Two Cu.mt
selected soil in layer of 20 cm in thickness Hundred Eighty
including ramming watering and Nine and Paise
consolidating etc. complete. Six Only
9 4.12 Providing and laying ordinary cement 10040.66 Rupees Ten Cu.mt
concrete 1:2:4 ( 1 Cement : 4 Coarse sand : Thousand Forty
4 -graded stone aggregate 20mm nominal and Paise Sixty
size ) and finishing smooth with curing etc. Six Only
complete including the cost of formwork but
excluding the cost of reinforcement for
R.C.C. work in:(B) COLUMNS, for ground
10 15.91 Brick work using Hydraulically Pressed burnt 4021.02 Rupees Four Cu.mt
clay building brick having crushing strength Thousand Twenty
not less than 35 kg/sq. cm. in foundation One and Paise
and plinth in Cement mortar 1:6 (1 Cement : Two Only
6 fine sand) ( B) Conventional method.up to
11 6.36 Providing and laying ordinary cement 7665.60 Rupees Seven Cu.mt
concrete 1:2:4 ( 1 Cement : 4 Coarse sand : Thousand Six
4 -graded stone aggregate 20mm nominal Hundred Sixty
size ) and finishing smooth with curing etc. Five and Paise
complete including the cost of formwork but Sixty Only
excluding the cost of reinforcement for
R.C.C. work in:(A) BEAMS, slab beams
12 13.64 Brick work using Hydraulically Pressed burnt 4295.99 Rupees Four Cu.mt
clay building brick having crushing strength Thousand Two
not less than 35 kg/sq. cm. in foundation Hundred Ninety
and plinth in Cement mortar 1:6 (1 Cement : Five and Paise
6 fine sand) ( B) Conventional method.for Ninety Nine Only
13 6.96 Providing and laying cement concrete 1:4:8 ( 2680.21 Rupees Two Cu.mt
1 Cement : 4 Coarse sand : 8 hand broken Thousand Six
stone aggregate 40mm nominal size ) and Hundred Eighty
curing complete excluding the cost of and Paise Twenty
formwork and reinforcement for reinforced One Only
concrete wirk(A) Foundations and Plinth -
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
14 9.94 Providing and laying ordinary cement 6888.15 Rupees Six Cu.mt
concrete 1:2:4 ( 1 Cement : 4 Coarse sand : Thousand Eight
4 -graded stone aggregate 20mm nominal Hundred Eighty
size ) and finishing smooth with curing etc. Eight and Paise
complete including the cost of formwork but Fifteen Only
excluding the cost of reinforcement for
15 3367.75 Providing TMT Bar FE 500 D reinforcement 76.21 Rupees Seventy Kg
for R.C.C. work including bending ,binding Six and Paise
and placing in position complete up to floor Twenty One Only
16 74.57 Providing 15mm thick cement plaster in 220.01 Rupees Two Sq.mt
single coat on rough (similar)side of single Hundred Twenty
or half brick walls for interior plastering upto and One Paisa
floor two level and finished with a floating Only
coat of neat cemrnt slurry (ii) Cement mortar
1:3 (1-cement :3-sand)
17 125.99 Providing 10 mm thick cement plaster in 153.67 Rupees One Sq.mt
Single coat on brick/concrete wall for interior Hundred Fifty
plastering finished even and smooth in (ii) Three and Paise
cement mortar 1:3 (1 cement : 3 sand) Sixty Seven Only
Ground floor ceiling
18 185.62 20 mm thick sand faced cement plaster with 300.66 Rupees Three Sq.mt
gutkha finish on wall up to all height above Hundred and
ground level consisting of 12mm thick Paise Sixty Six
backing coat of c.m. 1:3 (1 cement : sand) Only
and 8 mm thick finishing coat of c.m. 1:1 (1
cement : 1 sand) etc. Complete
19 87.64 P & L polished kotastone slab flooring over 965.59 Rupees Nine Sq.mt
20mm (average) thick base of cement Hundred Sixty
mortar 1:6 ( 1 cement: 6 coarse sand) laid Five and Paise
over and jointed eith grey cement slurry Fifty Nine Only
mixed with pigment to match the shed of
slab including rubbing and pollishing etc.
complete (A) 25mm thick
20 386.20 Finishing Wall with weather proof exterior 114.53 Rupees One Sq.mt
emulsion painting (two coats) to give an Hundred Fourteen
required shape even shade after thoroughly and Paise Fifty
brushing the surface remove all dirt and Three Only
remains of loose powdered materials with a
coat of cement washing etc. Complete
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
21 1000.00 Providing Erection and fixing double coated 3.95 Rupees Three and Ltr
ISI water Tank of required capacity each Paise Ninety Five
with all necessary fittings and connection etc Only
complete on Terrace.
22 36.00 Providing laying and jointing in true line and 91.84 Rupees Ninety Rmt
level 25mm dia. U.P.V.C. Pipe ( SCH- 40) One and Paise
for cold water including fittings make Eighty Four Only
PRINCE / SUPREME / ASTRAL / FINOLEX
or equivalent as approved by Engineer In
Charge. Pipe shall be fixed on the wall with
the help of clamp at every two metre C/C or
shall be concelled as directed including
necessary fittings etc. including testing of
pipe and joints and fixing the same with
adhesive solvent, including cost of all
23 6.00 Providing laying and jointing in true line and 72.65 Rupees Seventy Rmt
level 15mm dia. U.P.V.C. Pipe ( SCH- 40) Two and Paise
for cold water including fittings make Sixty Five Only
PRINCE / SUPREME / ASTRAL / FINOLEX
or equivalent as approved by Engineer In
Charge. Pipe shall be fixed on the wall with
the help of clamp at every two metre C/C or
shall be concelled as directed including
necessary fittings etc. including testing of
pipe and joints and fixing the same with
adhesive solvent, including cost of all
24 2.00 Providing and fixing Gun metal check or non- 420.63 Rupees Four No.
return fullway wheel valve.(C) 25mm dia Hundred Twenty
and Paise Sixty
25 2.00 Providing and fixing screw down bib taps of 186.83 Rupees One No.
following size (A) Brass screw down bib tap Hundred Eighty
polished bright (i)15mmdia Six and Paise
Eighty Three Only
26 2.00 Providing and fixing the metal-CI stand for 25835.80 Rupees Twenty No.
resting Dead body in place of the process Five Thousand
burning process made of appropriate metal Eight Hundred
section as per IS Code and material which Thirty Five and
can with stand temperature of 500 to 1000' Paise Eighty Only
C , design and make as suggested by the
engineer in charge.
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
27 12.00 Providing and laying (to level or slopes ) and 348.04 Rupees Three Rmt
jointing reinforced concrete light duty non Hundred Forty
presssure pipe I.S. Class NP-2 of the Eight and Paise
following internal diameter with collars and Four Only
butt ends prepared for coller joints Including
testing of joints complete ( C ) 250mm
28 1.00 Providing and fixing board made up og 1616.00 Rupees One No.
GI/MS frame with GI Sheet which display the Thousand Six
information of type of work Hundred Sixteen
,logo,expenditure,name of agency, etc. Only
complete. As per design approved by
engineer in charge.
29 57.55 Excavation for foundation upto 1.5 m depth 117.07 Rupees One Cum
including sorting out and stacking of Hundred
useful materials and disposing off the Seventeen and
excavated stuff upto 50 Meter lead. (A) Paise Seven Only
Loose or soft soil ( I ) 0 To 1.5 mt. Depth
30 46.48 Filling available excavated earth (Including 130.39 Rupees One Cum
rock in trenches plinth, sides of foundations Hundred Thirty
etc. in layers not exceeding 20 cm. in depth and Paise Thirty
consolidating each deposited layer by Nine Only
ramming and watering)
31 6.79 Providing and laying cement concrete 1:2:4 3855.17 Rupees Three Cum
(1-Cement : 2- coarse sand : 4- hand Thousand Eight
Machine crushed stone aggregates 40 Hundred Fifty Five
mmnominal size) and curing complete and Paise
including cost of formwork in (A) PCC Seventeen Only
32 4.28 Providing and laying controlled cement 4419.76 Rupees Four Cum
concrete M.250 and curing complete Thousand Four
inculding the cost of formwork but Excluding Hundred Nineteen
the cost of reinforcement for reinforced and Paise
concrete work in foundation, footings base Seventy Six Only
of column and mass concrete. (A) Footing
33 3.76 Providing and laying controlled cement 7963.85 Rupees Seven Cum
concrete M.250 and curing complete Thousand Nine
inculding the cost of formwork but Excluding Hundred Sixty
the cost of reinforcement for reinforced Three and Paise
concrete work in All Types of Column D) Eighty Five Only
Column, Pillers, posts and struts , upto
34 5.27 Providing and laying controlled cement 6265.03 Rupees Six Cum
concrete M.250 and curing complete Thousand Two
inculding the cost of formwork but Excluding Hundred Sixty
the cost of the cost of reinforcement for Five and Paise
reinforced concrete work in Beams. (E) Three Only
Beam, upto Plinth
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
35 1420.11 Providing and fixing TMT bars Fe-500D steel 76.21 Rupees Seventy Kg
reinforcement for R.C.C. work including Six and Paise
binding, bending and placing in position Twenty One Only
complete upto floor two level ,Ground Floor,
First Floor , Second Floor, Third Floor,
Terrace Floor (all floor).
36 21.37 Brick work using common brunt clay building 4021.02 Rupees Four Cum
bricks having crushing strength not less than Thousand Twenty
35 kg/sqcm. in foundation and plinth in One and Paise
cement mortar 1:6 (1 cement :6 fine sand) Two Only
etc.comp. (B) Conventional Ground floor
37 232.59 20mm thick sand faced cement plaster on 300.65 Rupees Three Sqm
walls upto height 10 metres above ground Hundred and
level consisting of 12mm thick backing coat Paise Sixty Five
of C.M. 1:3 (1-cement : 3-sand) and 8mm Only
thick finishing coat of C.M. 1:1 (1-cement : 1-
sand) etc. complete. Upto Ground Floor to
38 232.59 Finishing wall with weather proof exterior 114.53 Rupees One Sqm
emulsion paint on wall surface (two coats) to Hundred Fourteen
give an required shape even shade after and Paise Fifty
thoroughly brushing the surface to remove Three Only
all dirt, and remains of loose powdered
materials.etc complete. Priming: Apply a
liberal coat of exterior acrylic primer and
allow it to dry for 4-5 hours. Application of
putty is not recommended. Minimum 4-6
hours duration is required between each
coat of weather shield max paint
39 93.87 Providing & fixing 5 nos wire fenching G.I. 348.45 Rupees Three Sqm
Fixing on 25 X 25 X 5 MM ISA M.S. Section Hundred Forty
Including bolts and nuts or by screws. Eight and Paise
including applying a priming coat of red lead Forty Five Only
paint and two coats of synthetic enamel
paint etc complete.
40 10.72 Applying priming coat over new steel and 122.49 Rupees One Sqm
other metel surface after and including Hundred Twenty
preparing the surface by throughly cleaning, Two and Paise
oil,grease, dirt and other foreign matter and Forty Nine Only
scoured with brushes fine steel wood,
scrapers and sand paper with ready mixed
priming paint brushing red lead. and
Painting two coats (excluding priming coat)
on new steel and other metal surface with
enamel paint, brushing, interior to give an
even shade including cleaning the surface
an even shade including cleanicn the
surface of all dirt, dust and other foreign
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
41 2.14 Steel work welded in built up sections, 9047.86 Rupees Nine Quintal
framed work including cutting, hoisting, fixing Thousand Forty
in position and applying a priming coat of red Seven and Paise
lead paint :- Eighty Six Only
(A) In beams and joints channels angles,
column, tees, flats with connecting plates or
angle cleats as in
Rupees Sixteen Lakhs Seventy Eight Thousand Eight Hundred Fifty Seven and Paise Forty One Only
Deputy Executive Engineer Executive Engineer
Panchayat ( R & B) Sub Division Panchayat (R&B) Division
Kaparada Valsad.
I/we am/are/ willing to carry out the work at ………………….% below / Above
……………………………………….percent below / Above
(should be written in figures and words)
Tendered amount mentioned above amount of my / our tender works out as under.
Tendered Amount1678857.42
Rs……………………… Tendered Amount Rs………………………
Deduct………. % below Rs……………………. Add…………% Above Rs………………….
Net Amount Rs………………………………. Net Amount Rs……………………………….
Net Amount in words in Rs……………………………………………………………………………………….
All works shall be carried out as public works department Handbook and other specification
of Division or as directed.
All the columns in schedule should be filled in ink or ballpen and the total of the entries in last
column should be struck by the contractor under his signature.
Rate quated include clearance of site (Prior commencement of work and at its close) in all
respects and hold good for work under all conditions,site moisture, weather etc.
The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
GST and Income tax TDS will be deducted at a source while making payments of bills
Estimated Estimate Rate Total amount
Estimated Estimate Rate Total amount
Sr. according to
but may be Item of work Unit
No. In figures In Words estimated
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
To be continued on additional sheet,if found necessary.
Executive Engineer
Signature of the contractor Panchayat (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML