Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.0 CrAdmitted-Finance | ₹67.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹67.1 CrAdmitted-Finance | ₹67.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹68.7 CrAdmitted-Finance | ₹68.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹70.1 CrAdmitted-Finance | ₹70.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹70.1 CrAdmitted-Finance | ₹70.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DIVYA SIMANDHAR CONSTRUCTION PVT. LTD. L3 | JSR Constructions Pvt Ltd L2 | M/s Anmol Associates L4 | Bhavya Construction L5 | KLD CREATION INFRASTRUCTURE PVT LTD L1 | DIPAK NAG L6 | TAPESH CHANDRA DEBNATH L8 | SRI HARSHA CONSTRUCTIONS L9 | Mungamuru Sri Hari L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II) | 1 | Lump Sum | 68,71,00,000 ₹68.7 Cr | 67,10,00,000 ₹67.1 Cr | 70,07,19,870 ₹70.1 Cr | 70,11,00,000 ₹70.1 Cr | 67,00,55,000 ₹67.0 Cr | 72,40,53,557 ₹72.4 Cr | 83,94,95,000 ₹83.9 Cr | 86,24,00,000 ₹86.2 Cr | 72,89,19,000 ₹72.9 Cr |
Tender Value
₹78.8 Cr
Closing Date
30 Dec 2020, 11:00 amClosed
K K Agarwal
National Highways and Infrastructure Development Corporation Ltd 3rd floor, PTI Building, 4-Parliament Street, New Delhi
Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length 12.000 km) of Agartala - Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II)
2020_NHIDC_598334_1
NHIDCL/Tripura/NH-108B/A-K P-II/2020
Open Tender
Civil Works
547 days
Tripura
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
4 Feb 2021
20 Nov 2020
31 Dec 2020
20 Nov 2020
30 Dec 2020
12 Dec 2020
20 Nov 2020 - 9 Dec 2020
11 Dec 2020
Amount
Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II)
JSR Constructions Pvt Ltd
DIVYA SIMANDHAR CONSTRUCTION PVT. LTD.
M/s Anmol Associates
Bhavya Construction
DIPAK NAG
Mungamuru Sri Hari
TAPESH CHANDRA DEBNATH
SRI HARSHA CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.04 MB
DCA.pdf
Tender Documents • 2.37 MB
SCHEDULES.pdf
Tender Documents • 4.67 MB
RFP.pdf
Tender Documents • 2.61 MB
ExecutiveSummaryofDPR.pdf
Tender Documents • 3.13 MB
PandPandDrawings.pdf
Tender Documents • 14.37 MB
BOQ_628662.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid