Loading…
Loading…
Tender ID
Tender Value
₹5.8 Cr
EMD Value
₹5.8 L
Closing Date
30 Mar 2026, 7:00 pmClosed
Exeuctive Engineer, Panchayat, R. & B. Division, Patan
Resurfacing & Strengthening of Siddhpur-Maloj Road (Ch.0/00 to 7/900 Km.) Ta Siddhpur, Dist. Patan, Pkg. No. MMGSY/SCSP/PTN/31/2025 -2026.
281977
32 / 2025-26
Open
Civil Works - Roads
Works
Patan
7 documents required · 7 mandatory
₹9,000
Yes
Executive Engineer, Road &Building (Panchayat) Division, Patan
₹5.8 L
Yes
28 Feb 2026
28 Feb 2026
28 Feb 2026
30 Mar 2026
28 Feb 2026
MMGSY SCSP - PTN - 31. - 2025 - 2026 Resurfacing & Strengthning of Siddhpur Meloj Road, CH
-0/000 to 7/900 In Siddhpur Taluka, Dist-Patan.
QUANTITY STATEMENT
It. Description of Item (with brief specification and Estimated rate
Quantity Unit Rate In Amount
No. reference to book of specifications) In words
1 Clearing and grubbing road land including uprooting 3.16 Hec 28455.08 Rupees Twenty
rank vegetation grass bushes, shrubs, sapling and trees Eight Thousand
girth up to 300 mm removal of stumps of trees cut Four Hundred
earlier and disposal of unserviceable materials (C) By Fifty Five and
mechanical means in area of light jungle Paise Eight
2 Box cutting the road surface to proper slope and 1600.00 Cum. 114.44 Rupees One
camber for making a base of road work including Hundred
removing the excavated stuff and depositing on the road Fourteen and
side slops as directed upto 50 mts. Lead. Paise Forty
3 Earthwork for embankment including breaking clods, 25615.75 Cum. 165.42 Rupees One
dressing with all lead and lift (excluding watering and Hundred Sixty
consolidation)(C) From Borrow area within 1.0 Km.lead Five and Paise
4 Rolling & Watering Of earhwork in Layers With Vibratory 26649.75 Cum. 23.41 Rupees Twenty
Roller including filling in depressions which occur Three and
during the process.(SOR It Code 26002A P.no-255+ Paise Forty
Code-26003 P.No-187) One Only
5 Construction of granular sub-base by providing well 265.00 Cum. 1144.67 Rupees One
graded material, (Metal 25.60 mm to 53 mm 35%, B.T. Thousand One
Kapachi 25.60 mm to 4.75 mm 45% & Coarse sand Hundred Forty
below 2.38 mm 20% }spreading in uniform layers with Four and Paise
motor grader on prepared surface, mixing by mix in Sixty Seven
place method with rotavator at OMC, and compacting Only
with smooth wheel roller to achieve the desired density,
complete as per Technical Specification Clause
Grading I(Rate Analysis)
6 Provdining and laying W.B.M of B.T.M.C metal of size 45 168.00 Cum. 1619.38 Rupees One
mm to 90 mm size including 0.27 Cu.m. stone screening Thousand Six
& 0.08 Cu.M. stone dust as filler including spreading, Hundred
watering & consolidation by vibratory roller 80KN to Nineteen and
100KN static weight.100 mm thick compected. Paise Thirty
7 Provdining and laying W.B.M of B.T.M.C metal of size 45 476.00 Cum. 1520.59 Rupees One
mm to 63 mm size including 0.12 Cu.M. Stone Screeing Thousand Five
& 0.08 Cu.M. stone dust as filler including spreading, Hundred
watering & consolidation by vibratory roller 80KN to Twenty and
100KN static weight. 75 mm thick compected each of Paise Fifty
two layer. Nine Only
8 Providing and laying bituminous grout base course 37.5 3360.00 MT 2315.34 Rupees Two
mm thick using asphalt VG-30 for tack coat at the rate of Thousand
4 Kg./ 10 Sq.Mt. on WBM surface using B.T. stone Three Hundred
aggregates as per required gradation with the asphalt of Fifteen and
VG-30 grade at the rate of 1.99 % i.e. 19.90 Kg. /M.T. by Paise Thirty
weight by mix including heating and mixing in drum mix Four Only
plant, transporting the mix spreading the same by paver
finisher and consolidation by vibratory roller including
cost of all materials, fuel labours, tools and plant etc.
using contractors own drum mix plant etc.
complete{Rate Analysis}
9 providing and laying 37.50 mm thick compacted 3610.00 MT 2842.35 Rupees Two
bituminous macadam using stone chips 0.66 Cum per Thousand Eight
M.T. mix. As gradation and using asphalt grade VG 30 for Hundred Forty
tack coat for 2.50 kg/10smt on BT surface and mixing 34 Two and Paise
Kg M.T. (L.e. 3.40 % of mix ) including heating the asphalt Thirty Five Only
and aggregate by continuous batching drum mix plant
transporting mixed material and spreading the same by
paver finisher and consolidation by vibretory roller of
KN to 100 KN static weight including the cost of labour
oil lubricants etc using contractor's own machineries
and plants (R.A.)
10 Providing and laying 20 mm thick Mixed seal surfacing 1917.00 MT 3396.17 Rupees Three
using stone shipping and aggregates as per M.O.R.T. & H Thousand
gradation and asphalt grade VG-30 for mixing at the rate Three Hundred
of 51.00 Kg./ M.T. i.e. 5.10% of total mix weight of the Ninety Six and
including heatine the asphalt and aggregates ny Paise
continous batching of drum mix plant and spreading the Seventeen
same by paver finisher and consolidation with vibratory Only
roller and flushing sand @ 0.30 CuM. / 100 Sq.Mt.
including providing all materials qequipemnts, tools and
plant, oil, Kerosene, firewood, labour charges etc.
comp. using contractor's own machineries, drum mix
and paver finisher etc. complete(R.A)
11 Providing hard side shoulder of 100 mm thick for 1415.00 Cum. 668.32 Rupees Six
embankment using quarry spall with all lead and lift and Hundred Sixty
including watering and rolling and consolidation of sub Eight and Paise
grade in layers at OMC to required dry density including Thirty Two Only
filling depression which occur during the process using
vibratory roller of 80 KN to 100 KN (selected quarry spall
having CBR value not less than 30.0{As per R.A.}
12 Scarifying graveled macadam or bitumen macadam 39050.00 Sqm. 43.58 Rupees Forty
surface 6 cms. to 10 cms. depth i.c. stacking useful Three and
materials on road side and disposing of remaining stuff. Paise Fifty
13 Dismentaling the existing structure including removing 264.00 Cum. 974.66 Rupees Nine
and stacking the dismentelled materials as and where Hundred
directed. (A) R.C.C. work. Seventy Four
and Paise Sixty
14 Excavation for foundation upto 1.5 m depth including 994.00 Cmt 117.08 Rupees One
sorting out and stacking of useful material and disposing Hundred
off the excavated stuff upto 50 m lead(A) Loose or soft Seventeen and
soil Paise Eight
15 Excavation for foundation in sand, gravel, clay soft soils 1065.00 Cmt 535.45 Rupees Five
and murrum etc. including shoring, strutting dewatering Hundred Thirty
as necessary and disposing of the excavated stuff as Five and Paise
directed.(A) Depth upto 3.0 M. and lead upto 100m Forty Five Only
16 Excavation for foundation in sand, gravel, clay soft soils 659.00 Cmt 628.18 Rupees Six
and murrum etc. including shoring, strutting dewatering Hundred
as necessary and disposing of the excavated stuff as Twenty Eight
directed.(B) Depth from 3.0 to 6.0 M.and lead upto and Paise
100m Eighteen Only
17 Providing & laying CC 1:4:8 , (1 cement:4 Coarse sand:8 259.00 Cmt 2775.60 Rupees Two
machine crushed stone aggregate 40mm nominalsize) Thousand
and curing complate in Foundation & Plinth. Seven Hundred
and Paise Sixty
18 Providing and casting in situ ordinary cement concrete M- 1510.00 Cmt 3618.98 Rupees Three
150 mix and providing necessary pin headers including Thousand Six
shuttering, scaffolding, laying vibrating curing and Hundred
finishing complete without V Grooves. (A) Height from Eighteen and
0.0 to 5.00 mt Paise Ninety
19 Providing and casting in situ controlled cement concrete 1367.00 Cmt 4982.98 Rupees Four
M-20 for R.C.C. return as per drawings including Thousand Nine
centering shuttering, scaffolding where necessary, Hundred Eighty
laying vibrating, curing and finishing complete.(A) Height Two and Paise
from 0.0 to 5.0 M. (1) Piers (2) Abutment (3) RCC return Ninety Eight
20 Providing and casting in situ controlled cement 36.00 Cmt 5167.58 Rupees Five
concrete M-25 for R.C.C. work in pier cap,abutment Thousand One
cap and dirt wall including controlled cement concrete Hundred Sixty
M-30 bed blocks or pedstals of required size below Seven and
bearings as per detailed drawings, centering, shuttering, Paise Fifty
scaffolding, wherever necessary, laying vibating, curing Eight Only
and finishing complete.
21 Providing and casting. in situ controlled cement 106.00 Cmt 5394.16 Rupees Five
concrete M-300 for R.C.C. solid slab including centering, Thousand
scaffolding, curing and finishing complete. Three Hundred
22 Providing and casting in situ ordinary cement concrete 23.00 Cmt 5178.66 Ninety Four
concrete M-300 for approach slab including Thousand One
formwork curing and finishing complete. Hundred
23 Providing and casting in situ ordinary cement concrete M- 45.00 Cmt 5352.78 Rupees Five
400 for average 100 mm thick wearing coat laid as Thousand
directed including tamping ,vibrating, finishing, curing Three Hundred
and filling in joints with bitumen complete. Fifty Two and
24 Providing and casting in situ ordinary cement concrete 20.00 Cmt 5069.77 Paise
M-400 for Kerbs/Kerb blocks including formwork, Thousand Sixty
curing and finishing complete. Nine and Paise
25 Supplying and fixing reinforced concrete heavy duty non- 45.00 Rmt 1190.05 Seventy
pressure pipes with collars for culverts carrying heavy Thousand One
traffic as per IS 458-1991 specifications including setting Hundred
the pipes in C.M. 1:2 watering and laying (to level or Ninety and
slopes) of class NP3 of following internal daimeters.(ii) Paise Five Only
26 Providing and laying Ordinary cement concrete M.150 187.00 Rmt 3775.43 Rupees Three
for curing complete excluding cost of formwork and Thousand
reinforcement for reinforced concrete work in (A) Seven Hundred
Foundations, footings,Base of columns and Mass Seventy Five
concrete and Paise Forty
27 Providing TMT Bar FE 500D reinforcement for R.C.C. 11836.84 kg 76.98 Rupees
work including bending, binding and placing in position Seventy Six
complete upto floor two level and Paise
28 Providing and fixing in position Mild steel dowel bars in 18.00 No 341.28 Rupees Three
pier caps or abutment caps for anchorage in fixed end Hundred Forty
as per detailed drawings including cutting, bending and One and Paise
welding complete. Twenty Eight
29 Providing and fixing in position Mild steel dowel bars in 18.00 No 399.69 Only
pier caps or abutments caps for anchorage in free end Hundred
as per detailed drawing including cutting, bending and Ninety Nine
welding complete. and Paise Sixty
30 Providing PVC 100 mm diameter water spouts including 12.00 NO. 159.36 Rupees One
necessary iron grating as per drawings Hundred Fifty
31 Providing and laying - Filter Media 600mm thick directed 207.00 Smt 1298.37 Rupees One
at the back of abutments, returns and wing walls as per Thousand Two
detailed specifications. Hundred
32 Providing And Laying weep hole in Abutment and returns 345.00 No. 146.03 Rupees One
By using PVC pipe of 110 mm dia Including Laying in Hundred Forty
proper grade and jointing the Completed as per Detiled Six and Paise
Specification Three Only
33 Providing and casting in situ ordinary cement concrete M- 340.00 Cmt 4697.60 Rupees Four
250 for average 200 mm thick wearing coat laid as Thousand Six
directed including tamping ,vibrating, finishing, curing Hundred
and filling in joints with bitumen complete with Ninety Seven
Compaction and finishing of cement concrete road by and Paise Sixty
trimix process providing extra labour charges for the Only
trimix vacum dewatering service process on cement
concrete road surface by using vacum dewatering pump
floater surface vibrator including making groves and
rough finish to surface as per in including levelling the
complet ( Rate Analysis)
34 Providing Pre-moulded asphalt filler joints as per 62.00 Smt 703.52 Rupees Seven
drawings.(A) 12 mm Hundred Three
and Paise Fifty
35 Providing during Temporary diversion suitable for traffic 100.00 Rmt 2818.13 Rupees Two
the construction period of the Bridge /C D work by Thousand Eight
leveling existing ground and Provdining and laying W.B.M Hundred
of B.TM.C metal of size 45 mm to 63 mm size in layers Eighteen and
etc. complete. Paise Thirteen
36 Providing and laying rubble for appron (each stone 184.00 Cmt 1000.77 Rupees One
weighting not less than 40Kg.) including and packing and Thousand and
filing in the interestices with quarry-spalls.. Paise Seventy
37 Providing and fixing Hectometer as per I.R.C. type design 32.00 No 116.08 Rupees One
including painting, lettering etc. complete.(i) Fixing in Hundred
Earth Sixteen and
38 Providing and fixing Ordinary Kilometer Stone of precast 8.00 No 1293.39 Rupees One
C.C. 1:2:4 including necessary reinforcement as per Thousand Two
I.R.C. type design in C.C. 1:4:8 including Hundred
painting,lettering etc. complete (For O.D. road V.R.) Ninety Three
39 Providing and fixing 5th Kilometer Stone of precast C.C. 2.00 No 1935.15 Rupees One
1:2:4 including necessary reinforcement as per I.R.C. Thousand Nine
type design in C.C. 1:4:8 including painting,lettering etc. Hundred Thirty
complete. Five and Paise
40 Citizen' s information Board- Providing and fixing of 1.00 No 10977.69 Rupees Ten
typical information board as per instruction. Two MS Thousand Nine
plates of 1.6mm thick, of 900 mm x 750mm size fixed at Hundred
top & bottom duly welded with MS angles of 25 x 25 x 5 Seventy Seven
mm thick M.S plate shall be welded by two vertical M.S and Paise Sixty
flats & four horizontal M.S flates 5 mm thick to 75 mm x Nine Only
75 mm of 12 SWG square tubes postsduly embedded in
cement concrete M-15 grade blocks of 600mm x 600mm
x 75mm, below ground level. Painting New letters &
figure of any shade with ready mixed synthetic enample
paint of superior quality in required shade and colour,
All sections offramed posts and steel tube will be
painted with primer and two coats of epoxy paints as per
drawing Clause 1701 and
41 Project Information Board: Providing and fixing of typical 1.00 No 11832.15 Rupees Eleven
Project informatory sign boardwith Logo as per 1700 of Thousand Eight
MORD specifications and drawing. The board will be a Hundred Thirty
composite unit consisting ofThree Plates ACM Two and Paise
(Aluminum Composite Material), material specificaitons Fifteen Only
as per clause 17001.3. The topmost plate will be of 3mm
ACM in diamond shape of 600x600mm size, riveted with
MS angle iron frame of25mmx25mmx5mm size on back
on edges. The middle 4mm ACM plate of will be
1200x150mm size rivetedwith MS angle iron frame of
25mmx25mmx5mm size on back on edges. The main
4mm ACM lower mostplate will be 1500mmx600mm
size, riveted with MS angle iron frame of
25mmx25mmx5mm size. Riveting ofall the sheets over
angle and flat iron frame will be done neatly to have
plain surface on one side. The angleiron frame of lower
most plate and flat iron frame of the middle plate will be
welded to two nos 75mmx75mm (12 SWG) sheet tubes
posts placed at 1125mm apart centre to centre. the top
of the middle platewill be flushed with the top of 75mm
dia medium steel tube posts and these posts will be
embeded in cementconcrete M15 grade block of
450x450x600mm below ground level. The height of the
bottom of the lowerplate will be 1200mm from normal
ground level and the bottom of the middle plate will be
100mm above thetop level of the lower most plate. the
diamond shaped plate mounted over flat angle iron
frame will beconnected to middle plate by square steel
section of 47mmx47mm, thickness 12SWG having a
42 Direction sign (Junction board):-Providing and fixing sing 8.00 No 14831.71 Rupees
boards made out of 2mm aluminium sheet; size 244 x Fourteen
122cms. rectangle as as per the design of IRC-67-1977 Thousand Eight
pre treated with phospheting process & acid etching; Hundred Thirty
coated with one coat of epoxy primer and two coats of One and Paise
best quality epoxy paint; reflectorised with retro Seventy One
refiective sheeting as per latest M.O.S.T. Specifications; Only
Letters and numerals should be as per IRC-30-1968,
3.1m long (2 nos) stand post and frame fabricated from
suitable size iron angle of 50 x 50 x 5mm 75x75x6mm as
required; painted with best quality epoxy coatings in
black and white bends. the details of symbol or
inscription / numerals for each board shall be as per the
instruction of engineer in charge. The fixing at site shall
be in 1:2:4 CC block of size 45 x 45 x 60cms. for each
leg. including excavation curing etc. complete under the
supervision of engineer in charge.(A) Engineer
43 STOP Sign :-Providing and fixing sing boards made out of 4.00 No 6704.36 Rupees Six
4mm ACP (Aluminium Composite Panel); size 90 cms. Thousand
Octagonal as per design of IRC-67-2012. Pre treated Seven Hundred
with phospheting process & acid etching; coated with Four and Paise
one coat of epoxy primer and two coats of best quality Thirty Six Only
epoxy paint ; reflectorised with High Intensity Prismatic
Grade retro refiective sheeting of Type-4 as per ASTM D-
4956 and latest MORD Specifications; 3.1mtr long stand
post of Iron Angle 75 x 75 x 6 mm as required and frame
fabricated from suitable size iron angle of 35 x 35 x
3mm; painted with best quality epoxy coatings in black
and white bends. The details of symbol for each board
shall be as per the instruction of engineer in charge. The
fixing at site shall be in 1:2:4 CC block of size 45 x 45 x
Cms. for each leg including excavation, curing
etc.complete under the supervision of engineer in
charge. A warranty for 7 years for the Retro reflective
sheeting from original manufacturer shall be submitted
by contractor. (A) Class-B High Intensity Grade Retro
Reflective Sheeting
44 Village name/ Bump Ahed sign :-Providing and fixing sing 16.00 No 5045.36 Rupees Five
boards made out of 2mm aluminium sheet; size 90 x Thousand Forty
60cms. rectangle as as per the design of IRC-67-1977 Five and Paise
pre treated with phospheting process & acid etching; Thirty Six Only
coated with one coat of epoxy primer and two coats of
best quality epoxy paint; reflectorised with retro
refiective sheeting as per latest M.O.S.T. Specifications;
Letters and numerals should be as per IRC-30-1968,
3.1m long (2 nos) stand post and frame fabricated from
suitable size iron angle of 50 x 50 x 5mm painted with
best quality epoxy coatings in black and white bends.
the details of symbol or inscription / numerals for each
board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC block of
size 45 x 45 x 60cms. for each leg. including excavation
curing etc. complete under the supervision of engineer
in charge.(A) Engineer Grade(VR)...
45 Hazard Marker Sign :-Providing and fixing sing boards 16.00 No 2423.74 Rupees Two
made out of 2mm aluminium sheet; size 90 x 30cms. Thousand Four
rectangle as as per the design/drawing attached (IRC) Hundred
pretreated with phospheting process & acid etching; Twenty Three
coated with one coat of epoxy primer and two coats of and Paise
best quality epoxy paint; reflectorised with retro Seventy Four
refiective sheeting as per latest M.O.S.T. Specifications; Only
3.1m long stand post and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm & 50 x 50 x
5mm painted with best quality epoxy coatings The fixing
at site shall be in 1:2:4 CC block of size 45x45x 60cms.
for each leg. including excavation curing etc. complete
under the supervision of engineer in charge.(A) Engineer
46 Regulatory/Mandatory signs :Providing and fixing sing 14.00 No 3439.81 Rupees Three
boards made out of 2mm aluminium sheet; size 60cms. Thousand Four
diameter circle as per the design of IRC-67-1977 pre Hundred Thirty
treated with phospheting process & acid eteching; Nine and Paise
coated with one coat of epoxy primer and two coats of Eighty One
best quality epoxy paint; reflectorised with retro Only
refiective sheeting as per latest M.O.S.T. Specifications;
3.1m long stand post and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm 75x75x6mm as
required; painted with best quality epoxy coatings in
black and white bends. the details of symbol for each
board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC block of
size 45 x 45 x 60cms. for each leg. including excavation
curing etc. complete under the supervision of engineer
in charge.(A) Engineer Grade(VR)...INo-26094A, SOR 24-
47 Road marking with hot applied thermoplastic paints with 1746.00 Sqm. 367.72 Rupees Three
reflectorising glass beads on bitumin surface providing Hundred Sixty
and laying a hot applied thermoplastic compound 2.5 Seven and
mm thick including reflectorising glass beads @ 250gms Paise Seventy
per sqm area, thickness of 2.5mm is excluding of Two Only
surface applied glass beds as per IRC:35-2015. The
finished surface to be level, uniform and free from
streaks and holes. zebra patta /bump patta lane/center
line/ edge line/cut patta. The white color marking should
provide liminance coefficinet on cemend road shalll be
min 130 mcd/m2/lux and Asphalt road shall be min
mcd/m2/lux during the service life during the day time.
The marking should meet the performance criteria for
night time reflectivity, wet reflectivity and skid
resistance as mentioned in the section-15 of IRC 35-
2015. Warranty for the Retro reflectivity should be two
48 Cat Eye / Road Stud / RPM: Supplying Raised Pavement 1941.00 No 217.40 Rupees Two
Markers made of polycarbonate and ABS moulded body Hundred
and reflective panels with Micro prismatic lens (No Seventeen and
Glass bead lens) capable of providing total internal Paise Forty
reflection of the light entering the lens face and shall Only
support a load of 13635 kgs. tested in accordance to
ASTM D 4280 Type H and complying to Specifications of
Category A of MORTH Circular No RW/NH/33023/10-97
Ð DO III Dt 11.06. 1997. The height, width and length
shall not exceed 20 mm, 130 mm and 130 mm and with
minimum reflective area of 13 Sqcm on each side and
the slope to the base shall be 35 +/- 5 degree. The body
of the marker should having finger grip for easy and
accurate placement and application with epoxy /
bituminous Adhesive as recommended by the
manufacturer of the marker. The color of the marker
should be as per the IRC 35-2015 and as directed by
Engineer-in-charge.
49 Metal Beam Crash Barrier 160.00 Rmt 5700.44 Rupees Five
Type - A, "W" : Metal Beam Crash Barrier (Providing and Thousand
erecting a "W" metal beam crash barrier comprising of 3 Seven Hundred
mm thick corrugated sheet metal beam rail, 70 cm and Paise Forty
above road/ground level, fixed on ISMC series channel Four Only
vertical post, 150 x 75 x 5 mm spaced 2 m centre to
centre, 1.8 m high, 1.1 m below ground/road level, all
steel parts and fitments to be galvanised by hot dip
process, all fittings to conform to IS:1367 and IS:1364,
metal beam rail to be fixed on the vertical post with a
spacer of channel section 150 x 75 x 5 mm, 330 mm long
complete as per clause 810)
50 Providing and lauying weep hole in Aburtments, and 177.00 No 90.82 Rupees Ninety
|returns by using A.C. pipe of 100MM including fixing in and Paise
proper grade and jointing the complete as per detailed Eighty Two
|specification Only
51 Supplying fitting and fixing in position true line and level 31.00 Sqm. 63.13 Rupees Sixty
tar paper between abutment etc complete confirmig to Three and
IRC:83.of Morth Spe.complete inclu.all accessories as Paise Thirteen
Iner drawing and soeci.lAs Per MRÌ Only
52 Providing and fixing TMT dowel bars of minimum 77.00 Rmt 490.65 Rupees Four
32mm dia. For anchoring by drilling holes in Hundred
|foundation strata including necessary bending, Ninety and
hooking of dowel bars and grouting the holes Paise Sixty Five
complete as per detailed drawing and as directed Only
53 Providing and laying in position FE 550/550D TMT bar 33.87 MT 78369.22 Rupees
reinforcement including cutting, bending, hooking and Seventy Eight
tying complete as per detailed drawings for the All RCC Thousand
work.Add different of FE500/550D= 4459.00 Three Hundred
0 deduct credit lump sum 0.00 0 0.00 -50000.00
Rupees Five Crores Eighty Three Lakhs Six Thousand Two Hundred Twenty Three and Paise Sixty Four Only
I/We am/are willing to carry out the work at…% above/below percent(Should be written in figures and words) of the
estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Rs............... Estimated amount put to tender Rs.........
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R & B Sub Division Panchayat R & B Division
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills.
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01-SBD Pkg No. MMGSY-SCSP-PTN-31-2025-26.pdf
3.1 SPECIFICATION.pdf
5.0 SCHEDULE B.pdf
9.5 MMGSY GR.pdf
9.0.GR to be attached with DTP_SBD_with Index.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .