Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.5 L+₹12,271.95 (5.17%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹2.5 L+₹13,917.45 (5.87%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹2.7 L+₹31,230.83 (13.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹2.7 L+₹33,891.44 (14.3%)Admitted-Fee/PreQual/Technical/Finance KERALA KL | ALAPPUZHA | KERALA | 688548 | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | vijayan L1 | REJIN L4 | SIBIN B S L3 | JAYAN NAIR L5 | SURESH M L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Side wall | ||||||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 18.81 | cum | 323 ₹6,075.63 Lowest | 364.21 ₹6,850.79 | 426 ₹8,013.06 | 367.82 ₹6,918.69 | 338.48 ₹6,366.81 |
| 1.00 | OD98519/2026-2027:DRY RUBBLE MASONRY without concrete levelling course) with good quality blasted rubble(without bond stone) and packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 56.22 | cum | 3,880 ₹2,18,118.08 Lowest | 4,392.98 ₹2,46,955.76 | 4,070 ₹2,28,799.12 | 4,436.53 ₹2,49,403.97 | 4,082.69 ₹2,29,512.5 |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 1.43 | cum | 7,010 ₹9,989.25 Lowest | 7,881.59 ₹11,231.27 | 7,373 ₹10,506.53 | 7,959.72 ₹11,342.6 | 7,324.9 ₹10,437.98 |
| 1.00 | OD98718/2026-2027:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 3.04 | cum | 384 ₹1,165.44 Lowest | 432.78 ₹1,313.49 | 404 ₹1,226.14 | 436.99 ₹1,326.26 | 402.14 ₹1,220.49 |
| 1.00 | OD98520/2026-2027:Supplying and fixing nameboard of size 75x60 cm size using GI pipe as post and 1mm thick MS sheet surrounded by MS angles including painting,lettering and fixing in concrete etc as per direction of Engineer-in-charge | 1 | each | 1,830 ₹1,830 Lowest | 2,057.92 ₹2,057.92 | 2,551 ₹2,551 | 2,078.32 ₹2,078.32 | 1,912.57 ₹1,912.57 |
Tender Value
₹3.3 L
EMD Value
₹8,315
Closing Date
16 Jul 2026, 6:00 pmClosed
Assistant EngineerMudakkal Grama Panchayat
Assistant EngineerMudakkal Grama Panchayath
Annual Plan-Mudakkal GP, Proj. No.119/2026- 27-Improvements to Kodalikonam saju Foundation member road wall in ward 15- General Civil Work
2026_LSGD_859544_1
19/AE/ET/JLY/2026
Open Tender
Civil Works - Roads
Item Rate
60 days
Mudakkal GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹735
₹8,315
18 Jul 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
8 Jul 2026 - 16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Side wall | |||||
| 1.001 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 1 | cum | - | - |
| 1.002 | OD98519/2026-2027:DRY RUBBLE MASONRY without concrete levelling course) with good quality blasted rubble(without bond stone) and packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | - | cum | - | - |
| 1.003 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | - | cum | - | - |
| 1.004 | OD98718/2026-2027:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | - | cum | - | - |
| 1.005 | OD98520/2026-2027:Supplying and fixing nameboard of size 75x60 cm size using GI pipe as post and 1mm thick MS sheet surrounded by MS angles including painting,lettering and fixing in concrete etc as per direction of Engineer-in-charge | - | each | - | - |
stage.html
html • 0.02 MB
finance_1453382.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
afii.pdf
Other Document • 0.24 MB
viewsbd.pdf
Tender Documents • 1.74 MB
prelim.pdf
Tender Documents • 0.26 MB
viewnit.pdf
Other Document • 0.03 MB
fot.pdf
Other Document • 0.25 MB
feeremi.pdf
Other Document • 0.34 MB
integrity.pdf
Additional Documents • 0.23 MB
epay.pdf
Other Document • 0.23 MB
BOQ_1453382.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .