Tender Value
₹16.7 L
EMD Value
₹42,000
Closing Date
2 Sept 2026, 3:00 pm5d left
CMD, KRL
KRL Administration Office, Velloor,Kottayam
CONSTRUCTION OF ESSENTIAL CIVIL INFRASTRUCTURE WORKS FOR 110/11KV SUBSTATION INCLUDING RCC OIL SUMP AND FIRE WALL BETWEEN FIRST AND SECOND TRANSFORMERS AT INDUSTRIAL RUBBER COMPLEX, VELLOOR, KOTTAYAM DISTRICT, KERALA. (Retender)
2026_KRL_866598_1
KRl/IF/TENDER/11/2026-27
Open Tender
Civil Works - Others
Item Wise
60 days
Velloor
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
₹42,000
24 Aug 2026
24 Aug 2026
3 Sept 2026
24 Aug 2026
2 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1Oil Sump and Fire wall | ||||||
| 1.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 91.2 | cum | - | - | 18% |
| 1.02 | OD : Driving down sand piles 100 mm dia @ 75cm c/c to approved lines and levels through various strata using steel pipes with cc shoe at bottom after keeping the shoe and removing the steel pipe and filling the space with sand and consolidating well for required length. | 648 | m | - | - | 18% |
| 1.03 | OD : Providing Temporary Z steel sheet pile of available size, driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour hire charges etc complete for protection of adjacent structures, road and removing the same after work as per the directions of Engineer- in-Charge. | 63 | sqm | - | - | 18% |
| 1.04 | 2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 19.2 | cum | - | - | 18% |
| 1.05 | 50.2.3.1 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 290 | hour | - | - | 18% |
| 1.06 | 50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 58.14 | cum | - | - | 18% |
| 1.07 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.14 | cum | - | - | 18% |
| 1.08 | 5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 57.8 | sqm | - | - | 18% |
| 1.09 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 25.01 | sqm | - | - | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
drawings.pdf
Other Document • 1.02 MB
tenderdocumentfirewall2.pdf
Tender Documents • 1.75 MB
BOQ_1466750.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].