| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.4 L+₹48,384.53 (6.12%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.5 L+₹59,296.13 (7.51%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹8.7 L+₹83,833.42 (10.6%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹8.7 L+₹84,796.55 (10.7%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹8.9 L
EMD Value
₹25,000
Closing Date
28 Dec 2019, 3:00 pmClosed
EXECUTIVE ENGINEER , LSGD DIVISION ,PALAKKAD
OFFICE OF THE EXECUTIVE ENGINEER , LSGD DIVISION
Dist Pt PKD 2019-20 School Building Maintenance at GHS Manikaparambu in Thachanattukara GP Proj No 94/20
2019_LSGD_312301_2
275/E/19-20
Open Tender
Civil Works - Buildings
Item Rate
180 days
EXECUTIVE ENGINEER, LSGD DIVISION
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Yes
online
₹25,000
Yes
9 Mar 2020
19 Dec 2019
31 Dec 2019
19 Dec 2019
28 Dec 2019
19 Dec 2019
Amount
School Maintenance
15.28.1 : Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet
15.19 : Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
15.57 : Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
50.6.7.2 : Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
10.16.1 : Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
12.48 : Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
12.49 : Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
10.5.1 : Providing and fixing 1 mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using M.S. angels 40x40x6 mm for diagonal braces
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
MOHAMMED SHAREEF
MUHAMMED SHAFI T
NIZAR P
ABDUL SAMAD M
Bidder Name
ABDUL SAMAD M
MUHAMMED SHAFI T
MOHAMMED SHAREEF
ANAS. P
NIZAR P
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_459701.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .