Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.7 L+₹27,400 (5.00%)Rejected-AOC 512 CHITTILAKATTU IRIPANAM TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.0 L+₹51,245 (9.36%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
31 Aug 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deepak V S
SM(P and P)c
Instrumentation Maintenance Assistance in Acid area Phase II (2022-23) at FACT-CD, Ambalamedu.
2022_FACT_706817_1
04028/2022-2023/E26027
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDN105,CDN106,CDN111)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
22 Sept 2022
16 Aug 2022
1 Sept 2022
16 Aug 2022
31 Aug 2022
16 Aug 2022
Instrumentation Maintenance Assistance in Acid area Phase II (2022-23) at FACT-CD, Ambalamedu.
pH meter checking:The work includes removal of pH sensor from line, cleaning of sensor as per standard procedure, calibration checking of pH sensor as per procedure using standard buffer solutions after connecting with transmitter. Note: All material, required for the work will be provided by FACT free of cost.
Removal and Refixing of Temperature Elements with Thermowells/ Thermowell pockets: The work includes removal of thermowell-element assemblies/ Thermowell pockets (Flange size upto size 1.5 inch, length upto 1500mm) for inspection, refurbishing the fittings, leak checking minor welding if required for leak proofing and fixing back with proper gaskets, nuts and bolts. Note: All material, required for the work will be provided by FACT free of cost.
Removal and refixing of Instruments from Process Line / Vessel: The work includes removal of Pressure, Level transmitters/switches, level gauges and pressure gauges (End connection flange size upto 4", rating up to 150#), Magnetic/Mass flowmeters, Control valves etc (flange size upto 1", rating upto 150#) from plant site, transporting them to Instrumentation lab / workshop for inspection/repairs etc, bringing back to site and fixing back in position, at site with proper gaskets, bolts & nuts, ensuring leak proof connection. Note: All material, required for the work will be provided by FACT free of cost.
Refurbishment of Float & Rope for Tank Level Measurement:The work includes refurbishment of float and rope type level indicators of various storage tanks with new rope and float as required. The scope of work includes fabrication of float and accessories, transportation of all necessary items from Stores / Workshop to site, and installation as per instructions from the Engineer-in-Charge. Note: All material, required for the work will be provided by FACT free of cost.
Fabrication and mounting of Instrument stanchions:The Work includes fabrication of instrument stanchion (size 50 NB, SCH80 MS pipe, length approx. 130cm) with base plate of size 225mm X225mm X 6mm.and fixing the stanchion using anchor bolts or welding on “I" beam / Channels. Note: All the materials required for the work will be supplied by FACT as free issue.
Fabrication and mounting of field Instrument supports: The work includes fabrication of instrument supports (size 50 NB, SCH80 MS/SS pipe,"L"shape size 300X 200mm approx) and fixing the support using anchor bolts or welding on "I" beam / Channels. Note: All the materials required for the work will be supplied by FACT as free issue.
Laying of 6 mm/8mm SS pneumatic tube: Work includes laying of 6 mm/8mm SS pneumatic tubing between air headers, air filter regulators, I/P Converters etc of control valves located at the plant site. The tubing will involve providing standard SS fittings from air header to control valve accessories as required. Ends shall be connected at air header tapings, air filter regulator or I/P Converter. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing. Note: All the materials required for the work will be supplied by FACT as free issue.
Impulse line Tubing for Transmitters up to 12mm SS: The work includes laying of the SS tubes/pipes(sizes 12 mm) on angle supports, clamping, interconnection with suitable fittings, termination of tube at both the ends, providing of SS identification tags wherever necessary and pressure testing from the instrument 1st isolation valve to flow/pressure transmitter, Level instruments etc. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing. Note: All the materials required for the work will be supplied by FACT as free issue.
Installation of GRP/FRP Enclosure:Work includes fixing of FRP/ GRP diagonal enclosure of size 450X400X400 (W X D X H) approx for existing field instruments. The enclosure shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles. Note: All the materials required for the work will be supplied by FACT as free issue.
Installation of FRP/ GRP canopies for Field JBs: Work involves fixing of FRP/ GRP canopies of size 550X 450X 325mm (W X D X H) approx for existing junction boxes. The canopies shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles. Note: All the materials required for the work will be supplied by FACT as free issue.
Installation of FRP/ GRP canopies for Field Instruments: Work includes fixing of FRP/ GRP canopies of size 360 X 445 X 370mm (W X D X H) approx for existing field instruments. The canopies shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles. Note: All the materials required for the work will be supplied by FACT as free issue.
Fabrication and Fixing Ladder Type Aluminum Cable tray (250mmto 400mm): Aluminum Angles and Flats (for carrying out this work) will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items (including free supply items from FACT) from Lab / Stores to site. The work also includes Fabrication of ladder type cable racks of sizes 25cm to 40cm using Aluminum angles (65x65x6mm or 50X50X6mm) and their erection. Aluminum flats of size 50X8mm shall be used as cross bars and shall be provided at intervals of 50cm(for horizontal run) by drilling two numbers of holes at each end and fixing it with fasteners [fasteners (SS bolt, SS nut and SS washers to be supplied by contractor (M8X40mm) and two washers]. The cross bar shall be provided at 30cm intervals for vertical run of the trays. Fixing of the rack to the existing structures shall be using suitable MS angle welded supports or using proper anchor bolts, wherever required and as decided by the Engineer-in-Charge. The work shall include painting of MS supports with two coats of anti-corrosive epoxy paint (grey colour) over two coats of suitable primer. Epoxy paint and primer shall be provided by FACT.
Laying of Signal/Power Cables - 1 pair /1 triad /2 Triad/3 Core: Work includes transportation of cables to site, Installation of signal/ power cables-1 pair /1 triad /2 Triad/3 Core with wires of size 0.5/1/1.3/2.5 SQMM by laying on new/existing cable tray/ rack / clamping on the wall / structure / routing through GI pipe/trenches. The cables are to be laid from junction boxes to field instruments. Dressing of cables in racks shall be by using Aluminum strips of size 20x5mm at intervals of minimum 1 meter on horizontal runs and 30 cm on vertical runs. The scope of work includes fixing identification tags on either end of the cables before entering the instruments, junction boxes or control room. The tags may be tied to the cable using SS wires. The aluminum flat strips shall be fixed using M6 X40 SS Fasteners The supply of fasteners and SS wire as detailed above is in the scope of contractor. Cables and identification tags will be supplied by FACT free of cost.
Laying of Signal/Power Cables - 12 pair/ 20 pair/24 Core: Work includes transportation of cables to site, Installation of signal/ power cables-20 pair / 12 pair / 24 core with wires of size up to 2.5 SQMM by laying on new/existing cable tray/ rack / clamping on the wall / structure / routing through GI pipe/trenches. The cables are to be laid from junction boxes to Junction Boxes / DCS Control Room. Dressing of cables in racks shall be by using Aluminum strips of size 20x5mm at intervals of minimum 1 meter on horizontal runs and 30 cm on vertical runs. Clamping of cables on structure shall be by welding and fixing suitable cleats. The scope of work also includes fixing identification tags on either end of the cables before entering the instruments, junction boxes or control room. The tags may be tied to the cable using SS wires. The supply of fasteners and SS wire as detailed above is included in this item. Cables and identification tags will be supplied by FACT free of cost.
Dressing and arranging of Existing Cables on Prefabricated Aluminum Tray of sizes up to 200mm. : Work includes removal of the cables of various sizes, from the MS/Aluminum slotted trays, and arranging and Dressing of the cables in Angle / Ladder type Aluminum cable racks by using SS wire / Aluminum Flat strips(20x5mm) at intervals of minimum 50cm on horizontal runs and 30 cm on vertical runs. The aluminum flat strips shall be fixed on the Aluminum angle tray using M6 X40 SS Fasteners. Supply and installation of all other items required for the completion of work, like SS wire, nuts, bolts, washers is included in this item. The work also includes transportation of removed cables to scrap yard . The rate shall be quoted for dressing of cables of various sizes (up to 4 - 5 branch/multicore cables) on unit length of cable tray.
Dressing and arranging Existing Cables on Prefabricated Aluminum Tray of sizes above 200mm: Work includes removal of the cables of various sizes, from the MS/Aluminum slotted trays, and arranging and Dressing of the cables in Angle / Ladder type Aluminum cable racks by using SS wire / Aluminum Flat strips (20x5mm) at intervals of minimum 50cm on horizontal runs and 30 cm on vertical runs. The aluminum flat strips shall be fixed on the Aluminum angle tray using M6 X40 SS Fasteners. Supply and installation of all other items required for the completion of work, like SS wire, nuts, bolts, washers is included in this item. The work also includes transportation of removed cables to scrap yard . The rate shall be quoted for dressing of cables of various sizes (upto 10 - 15 branch/multicore cables) on unit length of cable tray.
Signal/Power Cable Glanding, 1/2" :Work includes transportation of all necessary items to site, Glanding of the signal and power cables of size 1 Pair / 1 Triad at junction boxes and field using double compression / single compression glands of size 0.5inch. The glanding shall be done with good workmanship and securing of glands shall be proper and tight. Stripping of insulations from wires shall be done without nicking the conductor. Standard stripping tools of proper design shall be used for carrying out the work. Cable glands will be supplied by FACT free of cost.
Signal/Power Cable Glanding, 1.25-1.5": Work includes transportation of all necessary items to site, Glanding of the signal and power cables of size 20Pair / 12 Pair / 24 Core at junction boxes using double compression / single compression glands of size 1.25inch and 1.5inch. The glanding shall be done with good workmanship and securing of glands shall be proper and tight. Stripping of insulations from wires shall be done without nicking the conductor. Standard stripping tools of proper design shall be used for carrying out the work. Cable glands will be supplied by FACT free of cost.
SO2 Stack Analyser Calibration checking: Work includes Calibration checking of SO2 Stack Analyser in Sulphuric Acid Plant as per standard procedure using the Zero and Span Gas cylinders provided. Prior to the Calibration check, the Sample handling system components to be checked of any leaks and purging/clearing any dirt/Acid accumulations inside any of the components. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Cell cleaning and Calibration checks- Ammoniacal Nitrogen analyser: Work includes Calibration checking of Ammoniacal Nitrogen Analyser in Effluent Treatment Plant as per standard procedure using Standard Buffer Solutions. Prior to the Calibration check, the sensor cells to be removed from the Drain channel and cleaned thoroughly. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge
Cell cleaning and Calibration checks- Flouride analyser: Work includes Calibration checking of Flouride Analyser in Effluent Treatment Plant as per standard procedure using Standard Buffer Solutions. Prior to the Calibration check, the sensor cells to be removed from the Drain channel and cleaned thoroughly. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Routine Cleaning and Checking of PM Analyser : Work includes Routine checking & cleaning of Particulate Matter (PM) Analyser system in Phosphoric Acid Plant as per standard procedure. The work involves Cleaning/Checking of the analyser components such as -Water regulator filters, Blower intake Filters & Water Tank etc. This work shall be done in co-ordination with the Instrumentation Technician. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Refurbishment of Dust Collector Valves: Work includes Refurbishment of Faulty Dust Collector Valves (3inch size) at Phosphoric Acid Plant with available spares such as Diaphragm, SOV Coil etc. and checking the same as per standard procedure: This work shall be done in co-ordination with the Instrumentation Technician.All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Removal, Surface Cleaning & Refixing of RADAR Level Transmitters: Work includes Removal, Surface Cleaning & Refixing of Unguided RADAR Level transmitters presently installed at Sulphuric Acid and Phoshporic Acid Storage Tanks at FACT-CD. This work shall be done in co-ordination with the Instrumentation Technician.All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge
Seat Leakage testing of Control Valves (Body Size less than or equal to 3inches): Work includes fixing of specified size Flanges at inlet side of a Control Valve( Body Size less than or equal to 3inches) using Nuts, Bolts and gaskets. Further to this the Flange inlet shall be connected to Hydraulic Pump and pressure raised as per specified ranges/setting repeatedly as per instruction from the Shift-In-Charge. The work shall be carried out at Workshops at Acid Area/Central Lab Area. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Seat Leakage testing of Control Valves (Body Size greater than or equal to 4inches): Work includes fixing of specified size Flanges at inlet side of a Control Valve(Body Size greater than or equal to 4inches) using Nuts, Bolts and gaskets. Further to this the Flange inlet shall be connected to Hydraulic Pump and pressure raised as per specified ranges/setting repeatedly as per instruction from the Shift-In-Charge. The work shall be carried out at Workshops at Acid Area/Central Lab Area. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Removal and Refixing of Actuators from Control Valve Body : Work includes de-coupling and removal of Actuator part from Control Valve Assembly. After related valve works have been completed, the Shift-In-Charge shall direct the worker to fix back the actuator onto the Valve body. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Gland Packing of Control Valves : Work includes gland packing of control valves of various sizes. The existing worn out gland packings shall be removed properly from the Valve prior to packing with new packing glands provided. The work shall be deemed to be completed if the Gland leakage test is found to be OK All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Body Leakage testing of Control Valves (Body Size less than or equal to 3inches) :Work includes fixing of specified size Flanges at inlet and outlet sides of a Control Valve(Body Size less than or equal to 3inches) using Nuts, Bolts and gaskets. Further to this the Flange inlet shall be connected to Hydraulic Pump and pressure raised as per specified ranges/setting repeatedly as per instruction from the Shift-In-Charge. The work shall be carried out at Workshops at Acid Area/Central Lab Area. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Body Leakage testing of Control Valves (Body Size greater than or equal to 4inches):Work includes fixing of specified size Flanges at inlet and outlet sides of a Control Valve(Body Size greater than or equal to 4inches) using Nuts, Bolts and gaskets. Further to this the Flange inlet shall be connected to Hydraulic Pump and pressure raised as per specified ranges/setting repeatedly as per instruction from the Shift-In-Charge. The work shall be carried out at Workshops at Acid Area/Central Lab Area. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Junction Box Termination connections refurbishment: Work includes refurbishment of Termination wiring connections inside Instrument Junction Boxes. The Junction Boxes house upto 20no.s of single pair cables and 1no.s of 20pair Multicable (max 80 terminations). The work involves replacement of all damaged Terminal blocks, cleaning of wire ends, putting wiring Ferrules, crimping of wire ends with lugs and tight Terminations.All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Sulphuric Acid Concentration Analysers Dry Calibration & Standardization:Work includes removal of Sulphuric Acid concentration analyser cell (Toroidal conductivity type) from Cell boot after proper isolation and draining. This cell shall be properly cleaned and then the Dry Calibration shall be checked along with the Transmitter using Potentiometric method. After the verification, the cell shall be fixed onto the cell boot using Nuts/Bolts and suitable gasket. Once the analyser is put in line, the Wet Standardization to be done based on Lab results.This work shall be done in co-ordination with the Instrumentation Technician.All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Replacement of Control Valve Air Regulators: Work includes removal of Air regulators from Control Valves in line and replacement of these with a supplied new one. All the fitting connections has to be properly lined up without any leaks. The supply pressure setting has to be matched to the Control valve specification as per instruction from Shift-In-Charge. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Replacement of Control Valve I/P’s: Work includes removal of I/P (Current to pneumatic convertor) from Control Valves in line and replacement of these with a supplied calibrated new one. All the fitting connections has to be properly lined up without any leaks. Once installed, the Stroke of the valve shall be checked as per instruction from Shift-In-Charge. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Replacement of Control Valve Positioner: Work includes removal of existing Positioner from Control Valves in line and replacement of these with a supplied calibrated new one. All the fitting connections has to be properly lined up without any leaks. The Positioner linkage shall be coupled to the valve correctly as per the specified Stroke length & Direction. Once installed, the Stroke of the valve shall be checked as per instruction from Shift-In-Charge.All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Removal ,Cleaning and refixing of Capacitance type Level probes:Work includes removal of existing Capacitance level probes (upto 3m length) from line and cleaning the entire length of the probe using Water/Dil. HCL. Once cleaned properly, the probe to be put back in line. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Instrument Loop Diagnosis and rectification: Work involves attending works related to instrument loop wiring faults. The checking would involve verification of Sensor side connections, Junction Boxes, DCS/ PLC Panels etc. Necessary wiring drawings shall be referred by the contract personnel prior to the work. Multimeters /Loop Calibrators/Temperature Calibrators to be used to diagnose the issues. The rectification work would involve Tightening of connections/ Replacement of Terminal blocks/ Crimping of wiring terminations etc. This work shall be done in co-ordination with the Instrumentation Technician. All materials/tools required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Supply of Unskilled Labor (8HR SHIFT BASIS):Charges for providing services of the following category of workers with tools on 8 hour shift basis (mandays) for attending works including installation/ repair/calibration/commissioning assistance for FACT during execution of the contract. The type of work includes re-routing, dressing and clamping of existing cables (various sizes – 20pair,12 pair, single pair etc), existing pneumatic tubes(sizes up to 12mm), from damaged cable trays onto new cable trays, and removal of existing cable trays, removal and re-rolling of old cables for disposal, cleaning of instrument panels, control valves, covering with polythene sheets for protection etc and transportation of instruments (including control valves, flow meters, transmitters etc and material from site to Lab/workshop/scrap yard as required. The charges shall include supervision of the workmen.
VIKRAMAN NAIR S
GOPINATHA PANICKER ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_743640.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .