| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹9,817.62 (2.02%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.0 L+₹16,346.33 (3.36%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
21 Sept 2026, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer REW Samba
Refer as per BOQ
2026_RDPR_324508_5
119 REW samba of 2026-27, Date 12.09.2026
Open Tender
Civil Works
Percentage
30 days
Ghagwal
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹9,800
25 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kind of soil | 37.52 | Cum | 479.3 | ₹17,983.34 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 18.71 | Cum | 4,826.5 | ₹90,303.82 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 16.11 | Cum | 5,733.6 | ₹92,368.3 |
| 4 | Supply of stone | 6.9 | Cum | 700 | ₹4,830 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 | 0.65 | cum | 7,788.4 | ₹5,062.46 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level using TMT Bars | 45.92 | kg | 123.2 | ₹5,657.34 |
| 7 | Centring and shuttering incl strutting, propping,and removal of same for foundation and footings | 95.26 | sqm | 286.35 | ₹27,277.7 |
| 8 | Suspended floor | 1.49 | sqm | 718.2 | ₹1,070.12 |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 9.29 | sqm | 416 | ₹3,864.64 |
| 10 | Providing and laying 60mm thick factory made cement concreteinterlocking paver block of M-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 271.52 | sqm | 816.15 | ₹2,21,601.05 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_1094632.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .