| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.3 L+₹26,355.44 (2.19%)Rejected-AOC | ₹12.3 L+₹26,355.44 (2.19%) | L2 | Rejected-AOC L2 |
Tender Value
₹15.4 L
EMD Value
₹38,386
Closing Date
23 Sept 2024, 3:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer, P.H.Division,Irinjalakuda
DEPOSIT Nagara Sanjaya Pathadhy Supplying and laying in 160mm PVC pipe (438m length) from Saraswathy Vidhyalayam ( Transformer Pooppthy Colony Road) to Poyya Panchayath End Point
2024_KWA_690556_1
15/EE/PHD/IJK/2024-25
Open Tender
Civil Works - Water Works
Item Rate
180 days
Poyya
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹38,386
14 Nov 2024
10 Sept 2024
24 Sept 2024
10 Sept 2024
23 Sept 2024
10 Sept 2024
10 Sept 2024 - 23 Sept 2024
Amount
Cost of Materials
100.98.226:Supply of PVC Pipe, 8kg/cm2, 160mm Dia.
100.98.441:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 40mm.
100.98.484:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Hand Wheel PN 1.6, Size 150mm.
OD223463/2023-2024:Supply of GI pipe, 80mm dia
OD223466/2023-2024: Cost of PVC Specials @3% of cost of Pipe (laying length)
OD229478/2023-2024:Cost of G I specials @ 5% of cost of pipe (laying length)
Working Charges
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.2.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock Requiring Blasting.
100.1.9:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock Requiring Blasting.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes.
100.32.2:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 40mm Single Acting Air Valve.
100.31.1.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class I.
15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar
4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
100.98.1008:Engaging Coolie.
OD229179/2023-2024:Taking connection from the line of size up to 160mm dia for providing service connection or connecting to the branch line using PVC/GI/MS saddle and specials including all labour charges necessary earth work excavation and refilling, bailing out water, providing fencing and caution , boards etc. but excluding cost of saddle piece, CID/CIR joints tail pieces and specials.
OD229182/2023-2024:Reinstating existing service connections from the dismantled pipe line to the newly laid pipe line , including cost of 20 mm ASTM pipe, 20 mm ASTM valve, 20 mm elbow, saddle etc. and all labour charges for laying , necessary earth work excavations and all incidental charges etc. complete as per the directions of departmental officers.
18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
Appendix-4- Estimate From PWD Road Division, Pooppathy Colony Road ( Transformer) to Poyya Panchayath End Point.
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
55.24:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average out put of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 percent of mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause NO. 507 complete in all respects (using 7% shredded plastic) Grading - II (13.2 mm nominal size)
E.V.Benny
Bidder Name
E.V.Benny
GIRIDAS K S
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .