| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAdmitted-Finance SHOP NO AL 1 GROUND FLOOR SUVIDHA COMPLEX VASCO DA GAMA 403802 INDIA | SOUTH GOA | GOA | 403802 | ₹34.0 L | L1 | Admitted-Finance |
| 2 | L2₹44.2 LAdmitted-Finance H NO S 2 VIRGINKAR ENCLAVE LAYAMATI DAVORLIM SALCETE GOA | SOUTH GOA | GOA | 403103 | ₹44.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHETRAM SHARMA L2 | DEEPAK ENGINEERS AND CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Removing of old tyre fenders by gas cutting of existing chain and D shackle for replacing with new tyre and chains and supplying and fixing used truck tyres, labour, transportation etc. complete , core cutting of holes 3 "dia 3 nos per tyre for passing the chain to fix it on the rail using D shackle. Supplying and fixing 3/4" D shackles for securing the tyre with chains including supplying and fixing 3/4" dia MS chain by gas cutting the chain to the required size for securing on both ends of the tyre to the fishing jetty rails. Rate includes supply of tyres, 3 holes per tyre, chain labour and tools and transportation etc. complete for jetty work. | 68 | Nos. | 7,900 ₹6,33,896 Lowest | 8,424 ₹6,75,941.76 |
| 2.00 | Supplying of used 90 LBS rails and Gas cutting the old existing rails from the jetty fabricating the new used rails to the required size and welding to the existing structure for strengthening the fishing jetty as and where required including driving the rails vertically in the sea bed. Rates include transportation of rail to site, labour, gas, welding rods, tools tackles etc. for jetty work. All labour materials etc. complete | 246 | Mts | 6,550 ₹19,01,334 | 4,680 ₹13,58,510.4 Lowest |
| 3.00 | Providing and fabricating 10mm MS new plates including dismentling of old / damaged plates and welding to the existing jetty structures, wherever required, the rates includes material, labour, gas, welding rod and tackles etc. including 2 coats of marine paint all complete for jetty works. All labour materials etc. complete | 132 | Sq.m. | 11,505 ₹17,92,018.8 | 8,355 ₹13,01,374.8 Lowest |
| 4.00 | LBS rails from the Jetty replacing old / damaged rail doublers plate 10mm x 2 meter plates. Total 26 nos. doublers. Including all materials, labour etc. complete for jetty works. All labour materials etc. complete | 1 | Job | 54,000 ₹63,720 | 39,999.56 ₹47,199.48 Lowest |
| 5.00 | Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
a All works upto plinth level | 2.62 | Cum | 7,850.63 ₹24,271.01 | 5,469 ₹16,907.96 Lowest |
Tender Value
₹42.5 L
EMD Value
₹85,000
Closing Date
7 Aug 2026, 5:00 pmClosed
EE II
aquem baixo rawanfond
Repairs, Upkeeping and Maintenance works of Khariwada Fishing Jetty for the Year 2026-27 at Khariwada, in Vasco Constituency
2026_WRD_30582_1
WDII/TECH/F17/11e/2026-27/SN4
Open Tender
Miscellaneous Works
Item Rate
30 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹85,000
19 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing of old tyre fenders by gas cutting of existing chain and D shackle for replacing with new tyre and chains and supplying and fixing used truck tyres, labour, transportation etc. complete , core cutting of holes 3 "dia 3 nos per tyre for passing the chain to fix it on the rail using D shackle. Supplying and fixing 3/4" D shackles for securing the tyre with chains including supplying and fixing 3/4" dia MS chain by gas cutting the chain to the required size for securing on both ends of the tyre to the fishing jetty rails. Rate includes supply of tyres, 3 holes per tyre, chain labour and tools and transportation etc. complete for jetty work. | 68 | Nos. | - | - |
| 2 | Supplying of used 90 LBS rails and Gas cutting the old existing rails from the jetty fabricating the new used rails to the required size and welding to the existing structure for strengthening the fishing jetty as and where required including driving the rails vertically in the sea bed. Rates include transportation of rail to site, labour, gas, welding rods, tools tackles etc. for jetty work. All labour materials etc. complete | 246 | Mts | - | - |
| 3 | Providing and fabricating 10mm MS new plates including dismentling of old / damaged plates and welding to the existing jetty structures, wherever required, the rates includes material, labour, gas, welding rod and tackles etc. including 2 coats of marine paint all complete for jetty works. All labour materials etc. complete | 132 | Sq.m. | - | - |
| 4 | LBS rails from the Jetty replacing old / damaged rail doublers plate 10mm x 2 meter plates. Total 26 nos. doublers. Including all materials, labour etc. complete for jetty works. All labour materials etc. complete | 1 | Job | - | - |
| 5 | Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
a All works upto plinth level | 2.62 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tendernotice_2.pdf
PDF • 0.16 MB
BOQ_30991.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].