Tender Value
₹26.9 L
EMD Value
₹54,000
Closing Date
26 Aug 2026, 9:00 amClosed
AJAY NIRALA
Muncipal Corporation Sonipat
Const.of boundry wall MS Grill on wall and Nala
2026_HRY_541578_1
2026D1108214 B410 4705 8F99 C55DF38D3C13292ULB
Open Tender
Civil Works
Works
10 days
Sonepat
All skilled and unskilled works costing up to 1 crore will be reserved for Cooperative Labour and Construction Societies at the rates approved for similar works in the recent past, through tenders within the concerned PWD circle
2 documents required · 2 mandatory
₹5,000
₹54,000
Yes
18 Aug 2026
18 Aug 2026
26 Aug 2026
18 Aug 2026
26 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate] | 64.4 | Sqm | 181 | ₹11,656.4 |
| 2 | [11.14]15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall. [Through Rate] | 252 | Sqm | 176 | ₹44,352 |
| 3 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] | 465.32 | Sqm | 49 | ₹22,800.68 |
| 4 | [11.9.1]15 mm cement plaster on rough side of single or half brick wall of mix: 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 1,865.01 | Sqm | 139 | ₹2,59,236.39 |
| 5 | [11.96.1]Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 1. New work (Two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | 1,865.01 | Sqm | 85 | ₹1,58,525.85 |
| 6 | [12.50.2]Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. 2. Fixed to openings /wooden frames with rawl plugs screws etc. [Through Rate] | 3,490 | Kg. | 105 | ₹3,66,450 |
| 7 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 501.42 | cum | 78 | ₹39,110.76 |
| 8 | [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate] | 244.66 | cum | 46 | ₹11,254.36 |
| 9 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 8.13 | cum | 3,476 | ₹28,259.88 |
| 10 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 62.56 | cum | 2,442 | ₹1,52,771.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_620991.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].