| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAdmitted-Finance 206 207 VIKRAM TOWERS T SOHANLAL MARG RAJENDRA PLACE CENTRAL DELHI DELHI 110008 | WEST DELHI | DELHI | 110008 | ₹43.2 L | L1 | Admitted-Finance |
| 2 | L2₹44.2 L+₹97,500 (2.26%)Admitted-Finance 7 395B CHERIA VAPPALASSERY ANGAMALY SOUTH 683573 | ANGAMALY | ERNAKULAM | KERALA | 683573 | ₹44.2 L+₹97,500 (2.26%) | L2 | Admitted-Finance |
| 3 | L3₹48.0 L+₹4.8 L (11.1%)Admitted-Finance | ₹48.0 L+₹4.8 L (11.1%) | L3 | Admitted-Finance |
| 4 | L4₹65.2 L+₹22.0 L (51.0%)Admitted-Finance | ₹65.2 L+₹22.0 L (51.0%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | M/s WattSun Energy India Private Limited L4 | Zivah International Private Limited L1 | EVER GREEN ENERGY TECHNOLOGIES PRIVATE LIMITED L3 | Virgin Power and Engineering Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and Commissioning of 90kWp On-grid Solar Photovoltaic Power Plant at Prefab Building at Technopark Phase I Campus, conforming to MNRE specifications as amended from time to time, consisting of Mono Crystalline silicon solar cells, necessary protections, earthing, mounted on on Aluminium/GI structure of suitable strength suitable for mounting on the slanted rooftop without affecting the asthetic beauty with following components complete as required
a) Solar Photovoltaic Module shall be TOPCon bifacial with mono-crystalline silicon solar cells and of capacity 535Wp or above, manufactured in India, conforming to IS14286/IEC61215, IS/IEC61730-Part-1, IS/IEC61730-Part-2. Solar Photovoltaic Module Efficiency shall not be less than 22%. PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 85% at the end of 25 years.
b) Power Conditioning Unit (PCU) of capacity note less than 100kW (Grid Tie), 350-800VDC Input voltage range and 415VAC, three phase, 4wire, 50Hz+/-2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50-degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency.
c) Data Monitoring System complete with accessories.
d) Fixing of Array junction box & Main junction box with IP65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.
e) Lightning and surge voltage protection.
f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs/cable trays and other accessories etc. as required.
g) Solar Irradiance should be measured with an integrating pyranometer (Class II or better) should be provided with the sensor mounted in the place of the array. Readout should be integrated with data logging system and the same should be used for analysing solar panel performance ratio.
For more details please refer tender document (Clause 6-Technical Specifications) | 1 | Ls | 61,27,576 ₹61,27,576 | 40,06,000 ₹40,06,000 | 46,00,000 ₹46,00,000 | 40,05,000 ₹40,05,000 Lowest |
| 2.00 | SITC of 3-ph 4-wire class LT Net meter/Bidirectional ToD Meter (Import – Export metering) of accuracy class 0.5s with RS-485 communication port, capable of measuring active energy (both import and export) and reactive
energy (import) by 3 ph, 4 wire principle suitable for balanced / un-balanced 3 phase load (With KVAr, KWh, KVA measuring registers), installation in sheet steel enclosure (meter box) having terminal blocks. including the supply and installation of metal enclosure and isolator of required rating . | 1 | nos | 30,000 ₹30,000 Lowest | 44,000 ₹44,000 | 47,200 ₹47,200 | 30,000 ₹30,000 Lowest |
| 3.00 | SITC of IOT-enabled Solar PV Monitoring & Analytics system with following features,
1.On-site sensor installation: Installation of solar irradiation, surface module temperature, ambient temperature, humidity, wind speed, and dust monitor (atmospheric turbidity sensor).
2.Real-time monitoring and data analysis: Integration of sensor data into a web-based monitoring dashboard for real-time insights and historical data analysis.
3.Key performance indicators (KPIs): Calculation and display of Performance Ratio (PR), expected vs. actual power output, module efficiency, and other relevant metrics.
4.Cloud-based portal: Access to a cloud-based portal for comprehensive system performance evaluation, including exporting data in CSV or PDF formats for further analysis.
5.Fault detection and notification: Immediate notification for low performance, system malfunctions, and other critical alerts.
6.Inverter integration: Integration of the solar plant inverter for detailed performance analysis. | 1 | nos | 2,50,000 ₹2,50,000 | 1,50,000 ₹1,50,000 | 64,900 ₹64,900 | 50,000 ₹50,000 Lowest |
| 4.00 | Supply, installation, testing, and commissioning of an industrial-grade 4G LTE Wi-Fi router for providing reliable internet connectivity to solar inverters and data loggers for remot monitoring. The router shall support SIM-based 4G/3G cellular networks, with at least one RJ-45 LAN port for wired connection to inverter or gateway, and shall be capable of 24×7 continuous operation. The sim card shall be supplied buy the contractor along with suitable 1 year internet plan. The ID proof required to register sim card will be provided by Technopark. | 1 | nos | 10,000 ₹10,000 | 30,000 ₹30,000 | 29,500 ₹29,500 | 4,500 ₹4,500 Lowest |
| 5.00 | Supply of 32" FHD or higher LED TV with Google TV or Android operating software, for the remote monitoring of solar online data and insights. | 1 | nos | 15,000 ₹15,000 Lowest | 20,000 ₹20,000 | 23,600 ₹23,600 | 18,000 ₹18,000 |
| 6.00 | Preparation of all drawings submitting and getting approval from electrical inspectorate, submitting of Completion certificates and arranging inspection, getting sanction and energization certificate etc, for commissioning of the whole installation in the premises. | 1 | LS | 90,000 ₹90,000 | 70,000 ₹70,000 | 35,400 ₹35,400 Lowest | 3,10,000 ₹3,10,000 |
Tender Value
₹45.0 L
EMD Value
₹50,000
Closing Date
9 Jun 2026, 3:00 pmClosed
Chief Executive Officer
Chief Executive Officer,Park Centre, Technopark Phase I Campus, Trivandrum
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 90KWP GRID CONNECTED SOLAR PV PLANT AT PREFAB BUILDING,TECHNOPARK PHASE-I CAMPUS.
2026_ETPK_853119_1
ETPK/PH-I/2026-27/E-05
Open Tender
Electrical Works
Item Rate
90 days
Technopark Phase I Campus, Trivandrum
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,950
₹50,000
Park Centre, Technopark Phase I Campus
14 Jul 2026
26 May 2026
10 Jun 2026
26 May 2026
9 Jun 2026
30 May 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing and Commissioning of 90kWp On-grid Solar Photovoltaic Power Plant at Prefab Building at Technopark Phase I Campus, conforming to MNRE specifications as amended from time to time, consisting of Mono Crystalline silicon solar cells, necessary protections, earthing, mounted on on Aluminium/GI structure of suitable strength suitable for mounting on the slanted rooftop without affecting the asthetic beauty with following components complete as required
a) Solar Photovoltaic Module shall be TOPCon bifacial with mono-crystalline silicon solar cells and of capacity 535Wp or above, manufactured in India, conforming to IS14286/IEC61215, IS/IEC61730-Part-1, IS/IEC61730-Part-2. Solar Photovoltaic Module Efficiency shall not be less than 22%. PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 85% at the end of 25 years.
b) Power Conditioning Unit (PCU) of capacity note less than 100kW (Grid Tie), 350-800VDC Input voltage range and 415VAC, three phase, 4wire, 50Hz+/-2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50-degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency.
c) Data Monitoring System complete with accessories.
d) Fixing of Array junction box & Main junction box with IP65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.
e) Lightning and surge voltage protection.
f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs/cable trays and other accessories etc. as required.
g) Solar Irradiance should be measured with an integrating pyranometer (Class II or better) should be provided with the sensor mounted in the place of the array. Readout should be integrated with data logging system and the same should be used for analysing solar panel performance ratio.
For more details please refer tender document (Clause 6-Technical Specifications) | - | Ls | - | - |
| - | SITC of 3-ph 4-wire class LT Net meter/Bidirectional ToD Meter (Import – Export metering) of accuracy class 0.5s with RS-485 communication port, capable of measuring active energy (both import and export) and reactive
energy (import) by 3 ph, 4 wire principle suitable for balanced / un-balanced 3 phase load (With KVAr, KWh, KVA measuring registers), installation in sheet steel enclosure (meter box) having terminal blocks. including the supply and installation of metal enclosure and isolator of required rating . | - | nos | - | - |
| - | SITC of IOT-enabled Solar PV Monitoring & Analytics system with following features,
1.On-site sensor installation: Installation of solar irradiation, surface module temperature, ambient temperature, humidity, wind speed, and dust monitor (atmospheric turbidity sensor).
2.Real-time monitoring and data analysis: Integration of sensor data into a web-based monitoring dashboard for real-time insights and historical data analysis.
3.Key performance indicators (KPIs): Calculation and display of Performance Ratio (PR), expected vs. actual power output, module efficiency, and other relevant metrics.
4.Cloud-based portal: Access to a cloud-based portal for comprehensive system performance evaluation, including exporting data in CSV or PDF formats for further analysis.
5.Fault detection and notification: Immediate notification for low performance, system malfunctions, and other critical alerts.
6.Inverter integration: Integration of the solar plant inverter for detailed performance analysis. | - | nos | 1 | - |
| - | Supply, installation, testing, and commissioning of an industrial-grade 4G LTE Wi-Fi router for providing reliable internet connectivity to solar inverters and data loggers for remot monitoring. The router shall support SIM-based 4G/3G cellular networks, with at least one RJ-45 LAN port for wired connection to inverter or gateway, and shall be capable of 24×7 continuous operation. The sim card shall be supplied buy the contractor along with suitable 1 year internet plan. The ID proof required to register sim card will be provided by Technopark. | - | nos | 1 | - |
| - | Supply of 32" FHD or higher LED TV with Google TV or Android operating software, for the remote monitoring of solar online data and insights. | - | nos | - | - |
| - | Preparation of all drawings submitting and getting approval from electrical inspectorate, submitting of Completion certificates and arranging inspection, getting sanction and energization certificate etc, for commissioning of the whole installation in the premises. | - | LS | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tender_Doc.pdf
Tender Documents • 1.75 MB
BOQ_1441675.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .