Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.2 LAdmitted-Finance | -5.11% | ₹23.2 L | L1 | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
11 Aug 2026, 6:00 pmClosed
Executive Engineer
KDA Kota
Civil Work
2026_UITKo_581060_2
NIT 17/2026-27 (8)
Open Tender
Civil Works
Percentage
180 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
1500 Secrectry KDA, 500 MD RISL
₹50,000
Yes
18 Aug 2026
8 Aug 2026
12 Aug 2026
8 Aug 2026
11 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. | |||||
| 1.1 | M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 17.1 | Cum | 3,847 | ₹65,783.7 |
| 2 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level
including curing, compaction, finishing with rendering in
cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 6.57 | Cum | 4,934 | ₹32,416.38 |
| 3Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) | |||||
| 3.1 | Thermo-mechanically Treated bars (Conforming of relevent IS code) | 515.9 | Kg | 77 | ₹39,724.3 |
| 4Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :of | |||||
| 4.1 | Suspended floors, roofs, landings, staircases, balconies,
girders, cantilevers, bands, coping bed plates, anchor blocks,
sills, chhajjas, lintel, beam, plinth beam etc. | 49.6 | Sqm | 340 | ₹16,864 |
| 5Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : | |||||
| 5.1 | 20mm thick. | 434 | Sqm | 190 | ₹82,460 |
| 6Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : | |||||
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
Special_Condition_8.pdf
Tender Documents • 0.43 MB
BOQ_1038301.xls
BOQ • 0.33 MB
Corrigendum.pdf
Other Document • 0.42 MB
Corrigendum_17.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].